Loading...
HomeMy WebLinkAboutContract 37697-A3 (2)AMENDMENT No. 3 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (City) and TCB, Inc., (Engineer) made and entered into City Secretary Contract No. 37697 (the Contract) which was authorized by M&C C-22905 on the 8th of July, 2008 in the amount of $521,814.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $11,670.00 which was administratively authorized on the 18th of August, 2010, Amendment No. 2 in the amount of $7,250.00 administratively authorized on the 20th of June, 2011; and WHEREAS, TCB, Inc. has merged into AECOM Technical Services, Inc.; WHEREAS, the CONTRACT involves engineering services for the following project: 2007 Critical Capital Project Council District 4 Pavement Reconstruction, Water and Sanitary Sewer Replacement in Arnold Court, Blevins Street, Clarence Street East, Clarence Street West, 29th Street, Aster Avenue, Eagle Drive, Fairview Street, Marigold Avenue, Bird Street, Bonnie Brae Avenue, Bonnie Brae Crossover, Clary Avenue, Concord Street, Dalford Street, Blue Flag Lane and Bryce Canyon Drive Project Nos. 00939, 00941, 00942 and 00944 WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to change the Engineer from TCB, Inc. to AECOM Technical Services, Inc. and include an increased scope of work and revised fee. NOW THEREFORE, City and Engineer, acting herein by and tln•ough their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. All references to TCB, Inc. shall be replaced with AECOM Technical Services, Inc. and Engineer shall be and mean AECOM Technical Services, Inc. 2. Article I of the CONTRACT is amended to include services specified in a proposal letter dated November 16, attached hereto and incorporated herein. The cost to City services to be performed by Engineer totals $9,930.00. the additional engineering 2011, a copy of which is for the additional design OFFIOIAg RRCORD CITY SRCR�TARY FT. !NORTH, TX I Contract Amendment No. 3 Page 1 of 2 AMENDMENT No. 3 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (City) and TCB, Inc., (Engineer) made and entered into City Secretary Contract No. 37697 (the Contract) which was authorized by M&C G22905 on the 8th of July, 2008 in the amount of $521,814.009 and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $11,670.00 which was administratively authorized on the 18th of August, 2010, Amendment No. 2 in the amount of $7,250.00 administratively authorized on the 20th of June, 2011 a and WHEREAS, TCB, Inc. has merged into AECOM Technical Services, Inc.; WHEREAS, the CONTRACT involves engineering services for the following project: 2007 Critical Capital Project Council District 4 Pavement Reconstruction, Water and Sanitary Sewer Replacement in Arnold Court, Blevins Street, Clarence Street East, Clarence Street West, 29th Street, Aster Avenue, Eagle Drive, Fairview Street, Marigold Avenue, Bird Street, Bonnie Brae Avenue, Bonnie Brae Crossover, Clary Avenue, Concord Street, Dalford Street, Blue Flag Lane and Bryce Canyon Drive Project Nos. 00939, 00941, 00942 and 00944 WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to change the Engineer from IB, Inc. to AECOM Technical Services, Inc. and include an increased scope of work and revised fee. NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. All references to TCB, Inc. shall be replaced with AECOM Technical Services, Inc. and Engineer shall be and mean AECOM Technical Services, Inc. 2. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal letter dated November 16, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $9,930.00. ®FFlClqL RRCORD MTV S�ORf*TARY NORTH, iX _ _ _ Contract Amendment No. 3 Page 1 of 2 3. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so ,that the total fee paid by the City for all work and services shall be an amount of $550,664.00. 4. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: ,� z i2 APPROVAL RECOMMENDED: Dougla . Wiersig, P.E. Director, Transportation and lic Works APPROVED AS TO FORM AND LEGALITY: Assistant City Attorney ATTEST: City pb-a-���i�j �OR��,� �� ENGINEER AECOM Technical Services, Inc. r�� 0 1 . D'Adam, P.E. Vice -President DATE: / � /Z u ._ Date: E� :� �L� OFF�C�A4 RECORa CITY ��CRETARY �T. WORTH, TX Contract Amendment No. 3 Page2of2 A ar^ AECOM 817 698 6722 tel /' zCV 1200 Summit Avenue 817 698 6700 fax Suite 600 Fort Worth, Texas 76102 www.aecom.com November 16, 2011 Mr. Richard Argomaniz, PE City of Fort Worth Transportation and Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 Subject: Critical Capital Projects for District 4 City of Fort Worth Secretary Contract Number 37697 Supplemental Amendment #3 Dear Mr. Argomaniz: This letter is in response to the City's request for AECOM to provide additional work for the subject project based on a January 3, 2011 meeting. The meeting was conducted to provide a status of the design for segments 4B, 4C, and 4D, and to discuss additional design efforts. The City asked AECOM to prepare a supplemental for the 46/4D projects to add sidewalk to certain streets, andto provide a design for an extension of a 6-inch waterline on the District 4A project. Below is a description of the supplemental items. Supplemental Items 1. Sidewalk on 4B —The City asked AECOM to provide sidewalks along the north and south side of NE 29`h Street and the south side of Aster Street, and the east side of Fairview Street between NE 28"' Street and NE 291h Street, since there are schools in the neighborhoods. The effort required to perform this work is shown below: • Modify Plans: AECOM will modify roadway plan sheets and cross-section sheets to include the sidewalks. Add ramps in appropriate locations. No sidewalk walls are anticipated. • Update Bid Proposal: The quantities Will be updated to show the revisions and each section will be added as a bid alternate. 2. Waterline on 4A —During construction, a long service line to a commercial property was identified. The service line was an existing small diameter line (2-inch or less) and the City asked AECOM to prepare a plan sheet to show the replacement of the existing service line with a new 6-inch waterline. The primary purpose of the sheet was to present the waterline to TxDOT so that a ROW permit could be acquired. The effort required to prepare the plan sheet is shown below: • Prepare Plan Sheet: AECOM will prepare a waterline plan sheet to show the 6-inch waterline. The cost to do this additional work is $9,930. A breakdown of this fee is provided as Attachment 1. If you have any questions, please don't hesitate to contact me at 512.457.7815 or by email at don.dadamO.aecom.com, Likewise, you can contact Matt Abbe at 817.698.6722 or by e-mail at matthew.abbe@aecom.com. Sincerely, r As Don D'Adain, PE rice President Attachments:. Fee table rn m U m v0i rn ..gype� roi qT V' U) V O M of 01 t0 n N N Oi N N m W fH f9 fA �9 fA f9 b9 b w _ M M N m O F A e fA 49 6901 f9 Vl C m 7 C O U a L m F ~ o w a d <O N "T `o 'o LL J O N N 01 y � L N co a a 06 e3 a a v Y N C N N O G a w n e w c a o . v ° 0° Y o as 3 a m o a a s a ts O N to y F yN M&C Request Review Page 1 of 3 �i�'t City of Fort Worth Employee Intranet �'��T W4R`>s'1ii a/2s/zoiz Staff Action Tracking `Council Agenda ', M&C ; Employee Directory ACToday ', Employee Classifieds i PRS IT Online ?Departments s Print M&C COUNCIL ACTION: Approved on 7/8/2008 DATE: 7/8/2008 REFERENCE NO.: C-22905 LOG NAME: 302007CODIST4 CODE: C TYPE: NON -CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of an Engineering Agreement with TCB, Inc., in the Amount of $521,814.00 for Pavement Reconstruction and Water and Sanitary Sewer Main Replacements on 4A -Arnold Court, Blevins Street, Clarence Street East and Clarence Street West; 46 - 29th Street, Aster Avenue, Eagle Drive, Fairview Street and Marigold Avenue; 4C -Bird Street, Bonnie Brae Street, Bonnie Brae Crossover, Clary Avenue, Concord Street and Dalford Street; 4D -Blue Flag Lane and Bryce Canyon Drive (Project Nos. 4A-00939, 4B-00941, 4C-00942, 4D-00944) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an engineering agreement with TCB, Inc., in the amount of $521,814.00 for pavement reconstruction and water and sanitary sewer main replacements on 4A -Arnold Court, Blevins Street, Clarence Street East and Clarence Street West; 4B - 29th Street, Aster Avenue, Eagle Drive, Fairview Street and Marigold Avenue; 4C -Bird Street, Bonnie Brae Street, Bonnie Brae Crossover, Clary Avenue, Concord Street and Dalford Street; 4D -Blue Flag Lane and Bryce Canyon Drive (Project Nos. 4A-00939, 4B-00941, 4C-00942, 4D-00944). DISCUSSION: On March 6, 2007, M&C G-15621, the City Council authorized the sale of $42,325.000.00 in Certificates of Obligation for the purpose of funding part of the Critical Capital Needs Program. That amount included funds for design for pavement reconstruction on the following streets: Street Arnold Court Blevins Street Clarence Street East Clarence Street West 29th Street Aster Avenue Eagle Drive Fairview Street Marigold Avenue Bird Street Bird Street Bonnie Brae Street Bonnie Brae Crossover Clary Avenue Limit Goddard Street to Northwest Cul De Sac Grapewood Street to Race Street Marsalis Street to Airport Freeway Marsalis Street to Airport Freeway Bonnie Brae Street to Fairview Street North Riverside Drive to Bolton Street Gwynne Street to Bolton Street Northeast 28th Street to Kimbo Road North Riverside Drive to Bolton Street North Riverside Drive to Bonnie Brae Street Bonnie Brae Street to Bonnie Brae Street East Belknap Street to Yucca Avenue Bonnie Brae Street to Bonnie Brae Street North Riverside Drive to Seaman Street file://C:\Documents and Settings\ArgomaR\My Documents\2007 CRITICAL PROJECT\M&C Re... 2/28/2012 M&C Request Review Page 2 of 3 Concord Street Dalford Street Blue Flag Lane Bryce Canyon Drive Bonnie Brae Street to Bonnie Brae Street Bonnie Brae Street to Bonnie Brae Street Buttonwood Drive to Whitewood Drive Bryce Canyon Drive West to Bear Lake Drive TCB, Inc., proposes to perform the necessary design work for a lump sum fee of $521,814.00. City Staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $227,222.52: 4A: (water; $10,950.00 sewer; $10,950.00 and streets; $16,060.00); 4B: (water; $14,600.00 sewer; $10,950.00 and streets; $28,517.50); 4C: (water; $16,425.00 sewer; $10,950.00 and streets; $68,454.76); and 4D: (water; $10,950.00 sewer; $10,950.00 and streets; $17,465.26) is required for project management by the Engineering Department. M/V1/BE —TCB, Inc., is in compliance with the City's M/VVBE Ordinance by committing to 26 percent M/WBE participation. The City's goal on this project is 26 percent. This project is located in COUNCIL DISTRICT 4, Mapsco, 63D, J, M R, 64P, T, 36R and S. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of the Water Capital Projects Fund, the Sewer Capital Projects Fund and the 2007 Critical Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P264 531200 604170093931 7 634.00 P264 531200 604170093932 $15.268.00 P264 531200 604170093933 2 545.00 P264 53120D 604170093951 4 922.00 P274 531200 704170093931 5109.00 P274 531200 704170093932 $10.218.00 P274 531200 704170093933 1 703.00 P274 531200 704170093951 4 952.00 C295 531200 204400093931 8 336.00 C295 531200 204400093932 $16,671.00 C295 531200 204400093933 2 779.00 C295 531200 204400093951 5 339.00 P264 531200 604170094131 $13.048.00 P264 531200 604170094132 $26.095.00 P264 531200 604170094133 4 349.00 P264 531200 604170094151 9 994.00 P274 531200 704170094131 4 866.00 P274 531200 704170094132 9 731.00 P274 531200 704170094133 1 622.00 file://C:�Documents and Settings�ArgomaR�lV1y Documents�2007 CRITICAL PROJECT�IVI&C Re... 2/28/2012 M&C Request Review Page 3 of 3 Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: P274 531200 704170094151 5 544.00 C295 531200 204400094131 $21,819.00 C295 531200 204400094132 $43.639.00 C295 531200 204400094133 7 273.00 C295 531200 204400094151 $11,153.00 P264 531200 604170094231 $16,668.00 P264 531200 604170094232 $33,337.00 P264 531200 604170094233 5 556.00 P264 531200 604170094251 $12,708.00 P274 531200 704170094231 1 432.00 P274 531200 704170094232 2 865.00 P274 531200 704170094233 477.00 P274 531200 704170094251 1 539.00 C295 531200 204400094231 $34,367.00 C295 531200 204400094232 $68,735.00 C295 531200 204400094233 $11.456.00 C295 531200 204400094251 $20,514.00 P264 531200 604170094431 3 760.00 P264 531200 604170094432 7 520.00 P264 531200 604170094433 1 253.00 P264 531200 604170094451 2 491.00 P274 531200 704170094431 2 609.00 P274 531200 704170094432 5 217.00 P274 531200 704170094433 870.00 P274 531200 704170094451 2 446.00 C295 531200 204400094431 $10,683.00 C295 531200 204400094432 $21,367.00 C295 531200 204400094433 3 561.00 C295 531200 204400094451 5 774.00 Fernando Costa (8476) A. Douglas Rademaker (6157) Dena Johnson (7866) ATTACHMENTS 302007CODIST4.pdf file://C:�Documents and Settings�ArgomaR�lVly Documents�2007 CRITICAL PROJECT�NI&C Re... 2/28/2012