HomeMy WebLinkAboutContract 37704STATE OF TEXAS S COUNTY OF TARRANT S AMENDMENT NO. 2 CITY SECRETARY (M&C Needed) WHEREAS, the City of Fort Worth (City) Perkins, (Engineer) made and entered into City 32301, (the Contract) which was authorized by the 20925 on the 30th day of April 2005; and CONTRACT NO. T)Dq and Teague Nall and Secretary Contract No. City Council by M&C C- WHEREAS, the Contract involves engineering services for the following project: 2004 CIP Stream WF-4 (Lebow Channel) Hydrologic and Hydraulic Analysis (City Project No. 00084) WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum f ee, NOW THEREFORE, City their duly authorized agreement which amends the and Engineer, acting herein by representatives, enter into the Contract: 1. and through following Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated July 23, 2008, a copy of which is both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $599,650.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $861,150.00. All other provisions of the Contract which are not expressly OFFIGIAL F�� �ORO FT. WORTH, Iw.f ORIGINAL amended herein shall remain in full force and effect. EXECUTED on this the day of , 20081 in Fort Worth, Tarrant County, Texas, ATTEST: City Secretary APP]�2QVAL RECOMMENDED Name : Nilchael A. Jones Principal 1100 Macon Street Fort Worth, Texas 76102 APPROVED/A$ TO FORM AND LEGALITY: Assistant C�ity�A£torney Contract:. Au'thorizatiOR APPROVED: Fernando Costa Assistant City Manager i C3��i�Ip+L Ri���1RD �1TY SECRETARY W" TEM UE MALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning July 231 2008 Ms. Dena Johnson, P.E City of Fort Worth Department of Engineering 1000 Throckmorton Fort Worth, Texas 76102 RE: AMENDMENT NO. 2 - LEBOW CHANNEL ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan CITY OF FORT WORTH PROJECT NO. 00084 (TNP Project No. FTW OS200) Dear Ms. Johnson: Attached is an updated and revised proposal for Amendment No. 2 —Lebow Channel Engineering Planning/Study Services: Schematic Plan, per your request. We have included the following Attachments and Exhibits to the City's Standard Agreement for Engineering Services for your review and consideration: Exhibit A-1 Supplemental Scope of Services (Amendment No. 2) Attachment B Compensation and Payment Schedule Exhibit 134 Method of Payment Exhibit 13-2 Engineer's Hourly and Reimbursable Rate Schedule Exhibit 13-3A Summary of Total Project Fees Exhibit 13-3B Professional Services Fee Summary Exhibit 13-3C Fees for Surveying Services Exhibit 13-3D Additional Services Exhibit B-3E Additional Services — Printing / Reproduction Exhibit 13-4 Pre -Design Opinion of Probable Construction Cost Attachment C Changes and Amendments to Attachment A Attachment D Project Schedule Exhibit D-1 Project Schedule — Projected / Actual Project Dates Attachment E Project Location Map Our proposal currently reflects a 17.4% M/WBE participation by a M/WBE surveying consultant (A.N.A. Consultants, L.L.C.), in accordance with the M/WBE goal of 17.0% established for this project by the M/WBE office. 1100 Macon Street •Fort Worth, Texas 76102 • 817.336.5773 phone • 817.336.2813 fax www. tnp-online. com Please do not hesitate to contact me know if you have any questions or need further information. I will be glad to provide clarification and/or explanation wherever needed. We look forward to the opportunity to continue our partnership with the Department of Engineering and our service to the City of Fort Worth. Sincerely, TEAGUE NALL AND PERKINS, INC. Michael A Principal Jones, Attachments EXHIBIT "A= I SUPPLEMENTAL SCOPE OF SERVICES (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan The following is a description of the additional scope of service tasks that the ENGINEER will perform on behalf of the OWNER. Work under this Amendment No. 2 includes engineering services for the following: 2004 CIP Stream WF4 L:BOW CHANNEL SCHEMATIC PLAN Project No. 00084 The intent of this schematic plan development and refinement is primarily to: a. Establish limits for the proposed construction improvements, as well as proper limits for property and/or easement acquisition; b. Facilitate completion of the Section 404 Individual Permit application; c. Provide guidance for acquiring ROW and removing remaining structures from floodplain; and d. Identify future drainage improvement projects within the watershed and prepare recommendations for an action/implementation plan pertaining to the orderly phasing for construction and ROW acquisition. For the purposes of this schematic plan the project limits are defined as the channel from Brennan Avenue to De RidderAvenue. Upon receipt of notice to proceed, the ENGINEER will perform the following tasks: Task 1 —SCHEMATIC PLAN (Basic &Additional Services) 1. Continue development and refinement of the detailed plan for Lebow Channel (Stream WF-4) based upon the proposed concepts for improvements identified in the Lebow Watershed Study — H&H Analysis, dated December 2006. These improvement concepts include: a. Channel re -alignment (Lower Lebow Channel); b. F000dplain and channel restoration (Lower Lebow Channel); c. Channel capacity and conveyance (Upper Lebow Channel); d. Detention (Upper Lebow Channel); and e. Roadway crossings (Lower and Upper Lebow Channel), 2. Using the City's latest available topographic (2400t contour) and/or aerial maps as a base, prepare schematic plan and profile design (approx. 30% plans). These plans will be prepared at a scale of 1"=20' or 40'h/1"=4' or 5'v and will be used as the base EA1-1 plan for the future phases of improvements along Lebow Channel, as well as supporting documentation for submittal of the Section 404 Individual Permit application currently in progress. In addition to reflecting the preliminary design concepts (i.e., grading, floodplain restoration, channel and culvert/roadway crossing improvements), the plans will identify and reflect: a. Potential easement and/or right-of-way needs; b. A footprint or corridor for the future trail system; c. Cut and fill areas along the channel; d. Areas of significant tree canopy loss, as well as potential areas for tree canopy mitigation. The schematic plan will also incorporate existing, currently ongoing, and/or approved designs for improvements at Oscar Avenue, 32nd Street, Vera Cruz Street, Brennan Avenue, N.E. 28th Street, Dewey Street and Decatur Avenue, 3. Evaluate/study alternative channel improvement options in specific locations as identified by the City where there may be a need to minimize and/or identify the impact and easement requirements to a property or properties adjacent to the channel. Specific areas of interest may include, but are not limited to: a. Trail Drivers Park; b. Re -alignment of the drainage channel from 28th Street to Loraine Street for potential restoration of natural floodplain and channel; c. Industrial area/properties between Dewey Street and Vera Cruz Street; d. Area north of Vera Cruz Street between Schadt Street and Schwartz Avenue, including potential changes in fence line, trail requirements, and a possible overflow channel; e. Channel improvements in the vicinity of Schwartz Avenue and Long Avenue to remove primary structures from floodplain; f. Channel re -alignment, as necessary for street/culvert crossings north of Long Avenue; and g. Items of interest north of Eva Street, including but not limited to buildings, major trees, required property acquisitions, and other items with significant impact. 4. Develop a line of taking that identifies parcels and/or easements (whole and/or partial) to be acquired by the City. 5. Prepare a schematic opinion of probable cost (OPC) for the proposed improvements. 6. Refine the Parks and Community Services concept plan for both sides of the drainage channel in the NuRock development area (immediately north of Long Avenue), and provide feasibility information regarding, but not limited to: a. A water quality feature; b. Stream restoration; c. Delineation and sizing of detention sites; d. Wet pond; e. Playing fields; and EA1-2 f. Pedestrian improvements. This work will include up to two (2) presentation of the refined concept beyond these will be facilitated, as Services, Items 1 & 3* meetings with the property owners and one (1) plan. Additional meetings and/or presentations requested by the City, under Task 2 — Special 7. Update the hydraulic model/study and 100-year floodplain delineation for the developed conditions conditions (analysis) to reflect the proposed schematic plan improvements. 8. Meet with the City bi-weekly (up to 12 meetings) to coordinate, review and discuss design and project status, including the Section 404 Individual Permit application and related environmental issues. 9. Assist and/or facilitate up to two (2) special public meetings/presentations regarding the various proposed Lebow Channel improvement projects. 10. Prepare a summary document/report outlining the recommended actions and/or implementation plan (beyond 30% design) for the development of the Lebow Channel watershed improvements, including, but not limited to: easement and right- of-way acquisitions, phasing, detention, construction, etc. Task 2 —SPECIAL SERVICES 1. Meet with property owners and other stakeholders to discuss and/or explain project scope and objectives, as requested by the City (approximately 8 — 10 meetings). 2. Assist and/or facilitate additional special public meetings) (beyond Task 1 —Item 9) regarding the various Lebow Channel improvement projects, as requested by the City. 3. Prepare exhibits, landscape architectural sketches and renderings regarding the proposed improvements, as requested by the City (approximately 8 — 10 sketches and/or renderings). 4. Provide supplemental topographic design surveys as needed for detailed design in certain locations, where approved by the City (approximately 80 hrs of field time and 80 hrs of office time). 5. Conduct surveys to establish critical slab elevations where information is missing or is needed (approximately 24 hrs of field time and 24 hrs of office time). 6. Furnish the City with property deeds and descriptions as necessary for property acquisition and/or easements for the Lebow Channel watershed improvements by conducting parcel surveys and/or preparing parcel exhibits and metes & bounds descriptions (or aliquot descriptions where appropriate), as directed by the City (approximately 35 parcels by metes & bounds description at $1,200/parcel; EA1-3 and 125 parcels by aliquot description w/o field survey at $650/parcel). This scope does not include property title insurance, platting or re-plattinq for the subiect properties. EA1-4 ATTACHMENT "B" COMPENSATION AND PAYMENT SCHEDULE (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO.00084 I. Compensation A. The ENGINEER shall be compensated a total lump sum fee of Four Hundred Seventeen Thousand, Seven Hundred, Eighty dollars ($417,780.00) for Basic & Additional Services, as summarized in Exhibit "13-313". Payment of the total lump sum fee shall be considered full compensation for the Basic & Additional Services (Tasks 1.1 — 1.10), as described in Attachment "A" and Exhibit "A-1", for all labor materials, supplies and equipment necessary to complete the project. B. The ENGINEER shall be reimbursed in an amount not to exceed One Hundred Eighty -One Thousand, Eight Hundred Seventy dollars ($181,870) for Special Services, as summarized in Exhibit "B-313". Payment for the Special Services (Tasks 2.1 — 2.6), as described in Attachment "A" and Exhibit "A-1 ", shall be in accordance to the Hourly & Reimbursable Rate Schedule shown in Exhibit "B-2" when requested and authorized by the City. C. The Engineer shall be paid monthly as described in Exhibit "B-1", Section I — Method of Payment. D. Each invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the Engineer. I1. Schedule A. A review set of the SCHEMATIC plans (approx. 30% plans), an updated hydraulic model &floodplain delineation, schematic -level opinions of probable cost, and a summary document/report shall be submitted to the OWNER within 132 working days after the "Notice to Proceed" letter is issued. B. A final set of the SCHEMATIC plans (approx. 30% plans), an updated hydraulic model &floodplain delineation, schematic -level opinions of probable cost, and a summary document/report shall be submitted to the OWNER within 15 working days after receipt of OWNER's comments regarding the review submittal. C. Special Services will be scheduled and completed as requested by the City. B-1 EXHIBIT "B-1" (SUPPLEMENT TO ATTACHMENT B) METHOD OF PAYMENT (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO.00084 I. Method of Payment The ENGINEER shall be paid monthly upon receipt of an invoice on the basis of the statements prepared from the books and records of account of the ENGINEER, based on the ENGINEER'S estimate of the percentage of completion of the Basic and Additional Services, plus the total for the Special Services provided during each billing period. Such statements shall be verified as to accuracy and compliance with the terms of this contract by an officer of the ENGINEER. Payment according to statements will be subject to certification by the Director of the Department of Engineering or his authorized representative that such work has been performed. The aggregate of such monthly partial fee payments shall not exceed the following: Until satisfactory completion and submittal of the review set of schematic plans, updated hydraulic model &floodplain delineation, opinions of probable cost and summary document/report, a sum not to exceed 90 percent (90%) of the total lump sum fee, plus 100 percent (100%) reimbursement of all Special Services performed to -date. The balance of fees, less previous payments, shall be payable after satisfactory completion and delivery of the final set of schematic plans, updated hydraulic model & floodplain delineation, opinions of probable cost and summary document/report. II. Progress Reports The Engineer shall submit to the designated representative of the Director of the Department of Engineering monthly progress reports covering all phases of the scope of services in the format required by the City. EXHIBIT "B-2" ENGINEER'S HOURLY AND REIMBURSABLE RATE SCHEDULE (Effective January 1, 2008 to December 31, 2008*) (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO. 00084 Engineering /Technical From To Principal $150 - $220 Per Hour Special Engineering Services Manager $150 - $200 Per Hour Project Manager $115 - $175 Per Hour Senior Engineer $110 - $210 Per Hour Engineer $80 - $120 Per Hour Landscape Architect / Planner $70 - $160 Per Hour Designer $85 - $110 Per Hour Senior Designer $100 - $135 Per Hour CAD Technician $60 - $85 Per Hour Senior CAD Technician $75 - $100 Per Hour IT Consultant $120 - $140 Per Hour IT Technician $70 - $100 Per Hour Clerical $50 - $75 Per Hour Resident Project Representative $70 - $100 Per Hour Land Agent $75 - $85 Per Hour Surveying From To Survey Office Manager $145 - $165 Per Hour Registered Professional Land Surveyor $105 - $135 Per Hour S.I.T. $70 - $90 Per Hour Senior Survey Technician $70 - $90 Per Hour Junior Survey Technician $60 - $75 Per Hour 2-Person Field Creww/Equipment $100 Per Hour 3-Person Field Crew w/Equipment $110 Per Hour 4-Person Field Crew w/Equipment $135 Per Hour 1-Person G.P.S. Creww/Equipment $110 Per Hour 2-Person G.P.S. Crew w/Equipment $130 Per Hour 3-Person G.P.S. Crew w/Equipment $150 Per Hour 1-Person Robotic Creww/Equipment $90 Per Hour 2-Person Robotic Crew w/Equipment $110 Per Hour Metes &Bounds Description (Survey &Exhibits) $1,200 Per Parcel or Lot Aliquot Description (Exhibits Only) $650 Per Parcel or Lot Direct Cost Reimbursables Photocopies, Scans & PDF Files: $0.10/page letter and legal size bond paper, B&W $0.20/page 11" x 17" size bond paper, B&W $1.00/page letter, legal and 11" x 17" size bond paper, color $2.00/page 22" x 34" and larger bond paper or vellum, B&W $4.00/page 22" x 34" and larger bond paper or vellum, color Plots: $1.00/page $2.00/page $4.00/page $6.00/page $6.00/page Mileage $0.505/mile 11" x 17" size bond paper, B&W 11" x 17" size bond paper, color 22"x34 and larger bond paper or vellum, B&W 22"x34 and larger bond paper or vellum, color 22"x34 and larger mylar or acetate, B&W All Subcontracted and outsourced services billed at rates comparable to TNP's billing rates shown above. Rates shown are for calendar year 2008 and are subject to change in subsequent years. EXHIBIT "B-3A" (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF TOTAL PROJECT FEES (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO.00084 Consulting Firm Prime Responsibility Amount Percent Prime Consultant: Teague Nall and Perkins, Inc. M/WBE Consultant: Survey Sub -Consultant (A.N.A. Consultants, L.L.C.) M/WBE Total Engineering, Project Mgmt., Property Acquisition, and Metes & Bounds Property/Easement Descriptions Aliquot Property/Easement Descriptions, Supplemental Design Survey TOTAL FOR PROFESSIONAL SERVICES Note: Non-M/WBE Consultants —None $ 494,900 82.6% $ 104,750 17.4% $ 104,750 17.4% $ 599,650 100.0% MNVBE Project Description Scope of Services Total Fee M/WBE Fee Percent Engineering Services Schematic Design B3A-1 $ 599,650 $ 104,750 17.4% EXHIBIT "B-30" (SUPPLEMENT TO ATTACHMENT B) PROFESSIONAL SERVICES FEE SUMMARY (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO.00084 BASIC ENGINEERING SERVICES (Schematic Plan - 30% Plans): Fee = (Construction Cost x 5.8%) x 85% x 30% = ($20,286,000 x 0.058) x 0.85 x 0.30 = $300,030 Total (Basic Engineering Services) ADDITIONAL SERVICES: Refine Concept for Detention Area North of Long Ave. (Task 1.6) Update Hydraulic Models & 100-Yr. Floodplain Delineation (Task 1.7) Bi-Weekly Project Meetings (Task 1.8) Special Public Meetings/Presentations (Task 1.9) Summary Document/Report (Task 1.10) Administrative Fee (10%) on Sub -Consultants Printing and Reproduction Total (Additional Services) SPECIAL SERVICES: - 25,140 19,680 = 12,320 22,200 10,475 $ 4,295 _ $ 117,750 Special Meetings w/Property Owners &Other Stakeholders (Task 2.1) _ Additional Public Meetings (Task 2.2) _ Prepare Special Exhibits, Sketches, Renderings, etc. (Task 2.3) _ Supplemental Topographic Design Surveys (Task 2.4) _ Field Surveys to Determine Critical Slab Elevations (Task 2.5) _ Prepare Parcel Exhibits and Descriptions (Task 2.6) _ TOTAL (Special Services) -Reimbursable B36- 1 $ 4,800 6,660 23,660 18,000 51500 $ 1234250 _ $ 181,870 EXHIBIT "B-3B" (SUPPLEMENT TO ATTACHMENT B) SUMMARY OF TOTAL FEE AND BREAKDOWN OF DESIGN FEE (LESS SURVEY FEE) (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO.00084 A. SUMMARY OF TOTAL FEE SERVICE DESCRIPTION TOTAL Basic Engineering Services $ 300,030 Tasks 1.1 — 1.5 Additional Services $ 117,750 (Tasks 1.6 — 1.10, Admin. Fee & Printing/Reproduction) Special Services $ 181,870 Tasks 2.1 — 2.6 PROJECT TOTAL $ 599,650 B. BREAKDOWN OF ENGINEERING DESIGN FEES (LESS SURVEY FEES) SERVICE DESCRIPTION TOTAL Basic Engineering Services 300,030 (Tasks 1.1 — 1.5)$ Additional Engineering Services $ 117,750 Tasks 1.6 — 1.10, Admin. Fee & Printing/Reproduction) Special Services (Less Survey Services) 35,120 (Tasks 2.1 — 2.3)$ ENGINEERING SUBTOTAL $ 460,550 Survey Services $ 146,750 Tasks 2.4 — 2.6 PROJECT TOTAL $ 599,650 63B- 2 EXHIBIT "B-3C" (SUPPLEMENT TO ATTACHMENT B) FEES FOR SURVEYING SERVICES (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO. 00084 SURVEYING SERVICES: Supplemental Topographic Design Surveys (Task 2.4) _ $ (Assumes approx. 80 hours of field & 80 hours of office time) Field Surveys to Determine Critical Slab Elevs. (Task 2.5) _ (Assumes approx. 24 hours of field & 24 hours of office time) 5, 500 Prepare Parcel Exhibits and Descriptions (Task 2.6) _ $ 123,250 (Assumes approx. 35 parcels by metes & bounds description; and approx. 125 parcels by aliquot description) TOTAL (Surveying Services)* _ $ 146,750 Note: Surveying Services will be billed on hourly and reimbursable rates as shown in Exhibit "B-2". Only effort requested and authorized by the City will be billed. B3C-1 EXHIBIT "B-3D" (SUPPLEMENT TO ATTACHMENT B) ADDITIONAL SERVICES (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO, 00084 ADDITIONAL SERVICES: Refine Concept for Detention Area North of Long Avenue Update Hydraulic Models & 100-Year Floodplain Delineation Bi-Weekly Project Meetings Special Public Meetings/Presentations Summary Document/Report Administrative Fee (10%) on Sub -Consultants Total (Additional Services)* Note: Does not include Printing &Reproduction. = 25,140 19,680 12,320 22,200 10,475 e $ 113,455 HOURS OF EFFORT PROJECTIONS FOR ADDITIONAL SERVICES SUB -TASKS: Princ./ SUB -TASK PM Engr. L. A. CAD Cler. Total Total Hrs. Hrs Hrs Hrs. Hrs, Hrs. Fee Refine Concept for Detention Area 32 60 60 40 - 192 $23,640 i North of Long Avenue - Develop Refined Concept is 20 40 40 40 - 140 i Plan 3g1 £ - Meetings & Presentation 12 20 20 - - 52 ;. Update Hydraulic Models & 100 Year 32 120 - 60 212 $25,140 Floodplain Delineation - Update Hydraulic Models to Reflect Schematic Design 20 80 - 20 - 120 J`I; : (i 11.= - Delineate Updated Improved -a Condition Floodplain 12 40 - 40 - 92ell £;; I B3D- 1 Princ./ Engr, L. A. CAD Cler, Total Total SUB -TASK PM Hrs Hrs Hrs. Hrs. Hrs. Fee Hrs. - Pre -Meeting Preparation 6 48 - - - 54 � ` � � i N - Meetings 12 48 - - - 60 - Post-Mp eting Minutes & 6 24 - - - 30,4 Correspondence B3D- 2 EXHIBIT "B-3E" (SUPPLEMENT TO ATTACHMENT B) ADDITIONAL SERVICES —PRINTING /REPRODUCTION (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES: Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO, 00084 PRINTING/REPRODUCTION COSTS: Description No. Sets She is/Se CosttShee Total Cost Mounted Color Exhibits 2 10 $ 50.00 $ 15000000 Schematic Plans (2 Submittals/1 Set Ea.) 2 130 $ 4.00 $ 13040.00 Half -Size Plan (6-1st Submittal; 4-2nd Sub.) 10 130 $ 1.00 $ 11300600 Preliminary Summary Report 4 30 $ 0.10 $ 12.00 Prel. Color Exhibits (11x17) — Sum. Report 4 40 $ 2.00 $ 320.00 Final Summary Report 6 30 $ 0.10 $ 18.00 Final Color Exhibits (11x17) — Sum. Report 6 40 $ 2.00 $ 480.00 Photocopies 250 1 $ 0.10 $ 25.00 Binding/Punching/Delivery 1 1 $100,00 $ 100.00 Total Printing/Reproduction $ 4, 295.00 Note: Additional or interim check sets and/or reports requested by the City shall be provided according to the Hourly and Reimbursable Rate Schedule (Exhibit "B-2") B3E- 1 Teague Nall and Perkins, Inc, Exhibit B=4 Consulting Engineers Pre -Design Opinion of Probable Construction Cost LEBOW CHANNEL SCHEMATIC PLAN (Brennan Ave, to De RidderAve,) Owner: CITY OF FORT WORTH Date: June, 2008 ITEM NO. DESCRIPTION OF ITEMS I QUANTITY I UNIT UNIT COST TOTAL Lower Lebow Channel Brennan Ave. to Diamond Rd. 1 Mobilization & Site Preparation 85 Sta. subsidiary 0.00 2 Unclassified Channel Excavation 350 000 C.Y. $14.50 $5 075 000.00 3 Gabion Basket for Channel Bank Stabilization 3 500 C.Y. 190.00 $665 000.00 4 Channel Flowline Drop Structures 3 Locations 1 500 C.Y. 190.00 285 000.00 5 Restoration Cleanup,Seeding & Permanent Soil Stabilization Matting 151 000 S.Y. $7.00 $1057 000.00 6 Fence Replacement 1800 L.F. 15.00 $27,000a00 7 Erosion Control 85 Sta. $1 250.00 $106 250.0 Sub -Total Lower Lebow Channel 7 215 250.00 Upper Lebow Channel (Long Ave. to De Ridder Ave. 1 Mobilization & Site Preparation 75 Sta. subsidiary 0.00 2 Unclassified Channel Excavation 175,000 C.Y. 2125 $3 893 750.00 3 Remove Existing Multi -Pie 60"/66" RCPs Culvert Crossings 7 Each $10,000,00 $70,000,00 4 Remove Existing Multi -Box 3-10'x6' Culvert Crossing 1 Each $15,000,00 $15 000.06 5 3-10'x9' Multi -Box Culvert (5 Roadway Crossings) 950 C.Y. $850.00 $807,500.00 6 5-10'x9' Multi -Box Culvert 3 Roadway Crossings) 980 C.Y. 850.00 $833 000.00 7 Headwall/Win walls Railin for 340'x9' MBC 10 Each $21,000s00 $210,OOOtOO 8 Headwall/Wingwalls/Railing for 540'W MBC 6 Each $24 000.00 $144 000.00 9 Roadway Pavement Replacement 6,500 S.Y. 75.00 $487,500s00 10 Gabion Basket for Channel Bank Stabilization 20,500 C.Y. $190.00 $3 895 000.00 11 Restoration Cleanup,Seeding/Sodding & Perm. Soil Stabilization Matting 58 000 S.Y. $10.00 $580 000.00 12 Fence Replacement 11 500 L.F. 20.00 $230 000.00 13 Erosion Control 75 Sta. $800.00 $60 000.00 Sub -Total Lower Lebow Channel 11 225 750.00 Basis for Cost Projection: No Design Completed ❑ Preliminary Design ❑ Final Design Sub -Total Construction Cost 181441 000 Contingency: +/- 10% i 845 000 Total Construction Cost $20,286,000 ATTACHMENT "C" CHANGES AND AMENDMENTS TO ATTACHMENT (Amendment No. 2) ENGINEERING PLANNING/STUDY SERVICES. Schematic Plan 2004 CIP STREAM WF-4 LEBOW CHANNEL SCHEMATIC PLAN PROJECT NO.00084 I. Changes and Amendments to Attachment "A" Other than set forth in the Supplemental Scope of Services (Exhibit "A-1"), no changes to Attachment "A" are proposed. C-1 N W H Q h U W n O w a J I•- U Q W U W a. w J W 2 U U W O L G a. v E m t v W U N � Z U) E F c � a) Ve z_ Q Z z J a. 0 z_ w w z 0 z W to ii J Q H t U Q � O i 00 rn rn rn rn M M rn rn 0 0 0 0 0 0 0 0 0 0 w N N N N M M d LO = N O O O O O O O N N M O N N N N N M M cM = O O O O O O O O O O LL •a C C C C C to fp a) 70 a) a)F o apM00Ornrna)mrnrn =W 1- O o 00000000 ;L O q V � mil' tf ) 0 0 0 M to i W �+ O CD O O O O O o o N �Q W M 00 0�0 N N M M r O CD 0 0 0 0 0 0 0 0 0 a) a. o o o o 0 N N N N .0 (B (6 tc6 7070 a��-a�o i (D f r O O O Lo M M N N N �- 0 c O a� C S c o a) E LL C) O a� o CL U (D c) : a) U Y U c .0 (te) a) a E n o U ZL o Q� a o N o W a c) = o a)a) z E ) _Zo a) O '� E E ,N �C U 0 M (Q fB Z O U Q + C C w z U) D O U) C) I i G: LH r- N M qqt tip Ti M d7 1011 0 Page 1 of 2 City of Fort Worth, Texas Mayor and Council C� •TiiTi unication ..-,..� .�..... . _a.. COUNCIL ACTION: Approved on 9/9/2008 DATE: Tuesday, September 09, 2008 LOG NAME: 30AMEND2LEBOW REFERENCE NO.: C-23031 SUBJECT: Authorize Execution of Amendment No. 2 in the Amount of $599,650.00 to City Secretary Contract No. 32301 with Teague Nall and Perkins, Inc., for Engineering Planning and Study Services for the Lebow Channel Watershed Improvements (City Project No. 00084) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 to City Secretary Contract No. 32301 in the amount of $599,650.00 ($417,780.00 for Basic and Additional Services, and $181,870.00 for Special Services) with Teague Nall and Perkins, Inc., for basic and additional services and for special services, thus revising the total overall contract cost to $861,150.00. DISCUSSION: The 2004 Capital Improvement Program (CIP) includes funds for the LeBow Channel Watershed Improvement Project to alleviate flooding in multiple neighborhoods on the north side of Fort Worth. On October 16, 2007, Council approved the issuance and sale of bonds which will be used to fund Capital improvements in the storm water utility system scheduled over the next two years. This portion of the project is being funded with Storm Water Capital Project 2007 Revenue Bonds. A conceptual study of the watershed in 2005 identified several proposed improvements for the Lebow Channel Watershed. These improvements included adding storm water detention facilities in the upper watershed, elimination of hydraulic bottlenecks, acquisition of flood prone properties, and development of linear natural corridors along the lower portion of the watershed. On August 30, 2005, the City Council authorized the City Manager to execute an engineering agreement in the amount of $243,900.00 with Teague Nall and Perkins, Inc., for the hydrologic and hydraulic analysis of the Lebow Channel Watershed (M&C C-20925). On January 31, 2007, Amendment No. 1 in the amount of $17,600.00 was administratively authorized for additional design services required for pavement improvements on 32nd Street and Oscar Street and review of alternatives at the Long Avenue crossing. (City Secretary Contract No. 34830). Amendment No. 2 is for the next phase of planning and study to prepare an implementation plan for the Lebow Channel Watershed. Amendment No. 2 for the subject engineering agreement will provide the following: . Schematic plan of the Upper and Lower portions of the Lebow Channel Watershed based upon the proposed concepts identified in the hydrologic and hydraulic analysis; . Identify additional parcels and easements to be acquired by the City; . Updating the hydraulic model of the Lebow Channel Watershed to reflect the schematic plan improvements; . Provide additional topographic design surveys; . Provide property surveys for land acquisitions; and . Preparation of an implementation plan for the continued development of the Lebow Channel http://apps.cfwnet.org/council�acket/Reports/mc�rint.asp 9/17/2008 Page 2 of 2 Watershed Improvements. Teague Nall and Perkins, Inc., proposes to survey for a lump sum fee of $417,780.00 exceed $181,870.00 for Special Services. scope of services proposed. perform the necessary planning/study services and additional for Basic and Additional Services; and for an hourly fee not to City staff considers this fee to be fair and reasonable for the M/WBE —Teague Nall and Perkins, Inc., is in compliance with the City's M/WBE Ordinance by committing to 17 percent M/1/VBE participation on this Amendment No. 2. The City's goal on this amendment is 17 percent for the work covered in this amendment. This project is located in COUNCIL DISTRICT 2, Mapsco 48V, 48Z, 49W, 62D, 62H and 63A. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Storm Water Capital Project 2007 Revenue Bond Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P229 531200 202280008431 P229 531200 202280008451 P229 531200 202280008453 Submitted for City Manager's Office bv: Fernando Costa (8476) Originating Department Head: Additional Information Contact: A. Douglas Rademaker (6157) Rick Shaffer (6821) $452.900.00 $23.500.00 $123,250.00 http://apps. cfwnet. org/council�acket/Reports/mc�rint. asp 9/17/2008