Loading...
HomeMy WebLinkAboutContract 37717-A3AMENDMENT NO. 3 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 6J 1 1I " A3 COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Dannenbaum Engineering Corporation, (Engineer) made and entered into City Secretary Contract No. 37717, (the Contract) which was authorized by the City Council by M&C C- 23050 on the 16th day of Sept 2008. WHEREAS, the Contract involves engineering services for the following projects ,5A (Project 00946),5B ( Project 00947) & 5C ( Project 00950) all part of the Critical Capital program. Engineering Design Services: Street Reconstruction, Water and Sewer Replacement on 5A ( Project # 00946 ) Water Project No. P265-531200 605170094630 Sewer Project No. P275-531200 705170094630 - Bideker avenue ( MLK Freeway - E Dead end ) - Bright street ( Berry street - Reed street ) - Burton avenue (Vaughn bled- Campbell Street) 5B ( Project # 00947 ) Water Project No. P265-531200 605170094730 Sewer Project No. P275-531200 705170094730 - Ave M ( Miller avenue - Hughes avenue ) - Edgewood Terrace ( Judy lane - Hampshire blvd ) - Valley View drive ( E Hurst Blvd or S.H 10 - 100' South of S.H 10 ) 5C ( Project # 00950 ) Water Project No. P265-531200 605170095030 Sewer Project No. P275-531200 705170095030 - Capers avenue ( Stalcup rd - Farrel Lane ) - Osborne Lane ( S Hampshire Blvd - Old Handley road > OFFICIAL RECORD Ransom terrace ( Maceo Lane - Truman Drive ) Plant avenue ( Craig street - Cravens road ) CITY SECRETARY FT. WORTH, TX WHEREAS, it has become necessary to execute Amendment No.3. Existing right of way on Edgewood Terrace is deficient, additional right of way would allow the possible addition of sidewalks, & the relocation of Utilities within the newly acquired Parkway. Suggested additional work is in contract 5B or Project 00947. Subsequently there is an increase in the scope of work, and a maximum fee revision; NOW THEREFORE, City and Engineer, acting herein by and through their July authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 18tn ,2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $ 12,870.00 . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $484,981.00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the Tarrant County, Texas. ATTEST: Marty City Hendr S ecretary APPROVAL RECOMMENDED: William A' Director, And Public l day of 2010, in Fort Worth, Transportation Works Department Dannebaum Engineering Corporation ENGINEER By: Name: Wayne G Ahrens, P.E. Principal 6421 Camp Bowie ,Suite 400 Fort Worth, Texas 76116 APPROVED AS TO FORM AND LEGALITY: Assistant City A torney APPROVED: Fernando Assistant Costa City Manager OFFICIAL RECORD CITY SECRETi4RY AICP T. WORTH, TX 4141 BLUE LAKE CIRCLE. SUITE 240 DALLAS TEXAS 75244 V9J 239-2002 ,r Fis.cAencr March 18, 2010 Mr. Khal Jaafari, P.E. TPW Department City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas 76102-6311 RE: Supplemental Agreement No. 3 2007 Critical Capital Project (Council District 5) Bideker Avenue, Bright Street, Burton Avenue, Avenue M, Edgewood Terrace South, Plant Avenue, Capers Avenue, Osborne Lane, & Ransom Terrace City Project Nos. 00946, 00947, & 00950 Dear Mr. Jaafari: Dannenbaum is submitting this fee Amendment to the above reference additional services requested. The following is a brief description and cost services to be provided on this project: Additional Services for Edge�,vood Terrace (Contract SB — CPN 00947): contract based on for the additional As requested by your February 23, 2010 email, the City wishes to acquire additional Rights of Way to accommodate sidewalks along Edgewood Terrace South. This amendment includes the effort associated with preparing ten (10) Rights -of -Way documents for the City's use in acquisition. Summary of Contract Fee for Contract SB: Original Contract Amount $ 97,037.00 Amendment No. 1 $ 0.00 Amendment No. 2 $ 0.00 Amendment No. 3 $ 12,870000 Revised Contract Amount $ 109,907.00 Work Phase Summary (Includes all Amendments to date): Work Water Sewer T/PW (Paving &Drainage) Phase Original Revised Original Revised Original Revised 51 3,687.00 3,687.00 21251400 2,251.00 55938.00 17,638.00 31 6,386.00 6,386.00 31448,00 3,448.00 153712.00 16,063000 32 12,774.00 12,774.00 6,898.00 61898,00 311426,00 32,128.00 33 2,129.00 21129600 15150.00 1,150.00 5,238.00 5,355.00 Total 245976.00 24,976.00 13,747,00 13,747.00 58,314,00 717184,00 G:'�1210\d397-32�AdminAAgreement\SA3\Lclter.laaiiiri 03-iR-2010.doc Mc Khal Jaafari, PI Supplemental Agreement No. 3 March 18, 2010 Page 2 of 2 Summary of Contract Fee for Total Project (CPN 009469 00947 & 00950): Original Contract Amount $ 451,313.00 Amendment No. 1 $ 18,958.00 Amendment No. 2 $ 1,840.00 Amendment No. 3 $ 12 870.00 Revised Contract Amount $ 4845981.00 Work Phase Summary (Includes all Amendments to date): Work Water Sewer T/PW (Paving &Drainage) Phase Original Revised Original Revised Original Revised 51 24,336.00 24,336.00 85164.00 85164.00 325500.00 50,500.00 31 28,049000 28,049.00 9,409.00 93409600 785436.00 82,584.00 32 2 56,096.00 56,096.00 18,818.00 18,818.00 1565874600 1653171.00 33 9,349.00 11,189.00 31136900 3,136.00 265146.00 273529.00 Total 117,830.00 1195670600 39,527.00 395527.00 293,956.00 325,784.00 Thank you for your consideration of this amendment request. If you have any questions in the meantime, please do not hesitate to call. Sincerely, 00/ uC-"rt Caldwell, P.E. Project Manager cc: Gary W. Fisher, P.E. File 4397-32 G:A1210\4397-32\�AdrainAAgreementASA3\Letter laaliiri 03-18-2010.doc ATTACHMENT "B" COMPENSATION AND SCHEDULE 2007 CRITICAL CAPITAL PROJECT (COUNCIL DISTRICT 5) STREET RECONSTRUCTION, WATER AND SANITARY SEWER REPLACEMENT CONTRACT 5B ON AVENUE M (MILLER TO HUGHES), EDGEWOOD TERRACE SOUTH (JUDY TO HAMPSHIRE) AND VALLEY VISTA DRIVE (SH10 TO 100-FEET SOUTH) SUPPLEMENTAL AGREEMENT NO.3 CITY PROJECT NO. 00947 I. Compensation: A. The Engineer shall be compensated a total lump sum fee of $12,870.00 as summarized in Exhibit "B-313". Payment of the total lump sum fee shall be considered full compensation for the services described in Exhibit "A" for all labor materials, supplies and equipment necessary to complete the project. B. The Engineer shall be paid monthly as described in Exhibit "B-1", Section 1 — Method of Payment. Each Invoice is to be verified as to its accuracy and compliance with the terms of this contract by an officer of the Engineer. II. Schedule: A. Phases 1 and 2 shall be completed 65 days after the "Notice to Proceed" letter is issued. The Scope of Services is outlined in Attachment "A", Exhibit "A" EXHIBIT "13-1" (SUPPLEMENTAL TO ATTACHMENT B) METHOD OF PAYMENT 2007 CRITICAL CAPITAL PROJECT (COUNCIL DISTRICT 5) STREET RECONSTRUCTION, WATER AND SANITARY SEWER REPLACEMENT CONTRACT 5B ON AVENUE M (MILLER TO HUGHES), EDGEWOOD TERRACE SOUTH (JUDY TO HAMPSHIRE) AND VALLEY VISTA DRIVE (SH10 TO 1004EET SOUTH) SUPPLEMENTAL AGREEMENT NO.3 CITY PROJECT NO. 00947 I. II. Method of Payment Partial payment shall be made to the Engineer monthly upon City's approval of an invoice from the Engineer outlining the estimated current percent complete of the total project. The aggregate of such monthly partial fee payments shall not exceed the following: Until satisfactory completion of Exhibits "A-1" and "A-2", Conceptual Engineering plan submittal and approval by the City, a sum not to exceed 30 percent of the total lump sum fee. Until satisfactory completion of Exhibits "A-1" and "A-2", Preliminary Construction all submittal to City, a sum not to exceed 60 percent of the total lump sum fee, less previous payments. Until satisfactory completion of Exhibits "A-1" and 44A-259, Final Construction plan submittal and approval by the city, a sum not to exceed 90 percent of the total lump sum fee, less previous payments. Progress Reports A. The Engineer shall submit to the designated representative of Director of Department of Engineering monthly progress reports covering all phases of design by the 15"' of every month in the format required by the City. B. If the Engineer determines in the course of making design drawings and specifications that the construction cost estimate of $0.00 (as estimated on Exhibit 13 4) will be exceeded, whether by change in the scope of the project, increased costs or other conditions, the Engineer shall immediately report such fact to the City's Director of the Department of Engineering and, if so instructed by Director of the Engineering Department, shall suspend all work hereunder. EXHIBIT "B-2" (SUPPLEMENT TO ATTACHMENT B) HOURLY RATE SCHEDULE 2007 CRITICAL CAPITAL PROJECT (COUNCIL DISTRICT 5) STREET RECONSTRUCTION, WATER AND SANITARY SEWER REPLACEMENT CONTRACT 5B ON AVENUE M (MILLER TO HUGHES), EDGEWOOD TERRACE SOUTH (JUDY TO HAMPSHIRE) AND VALLEY VISTA DRIVE (SH10 TO 1004EET SOUTH) SUPPLEMENTAL AGREEMENT NO.3 CITY PROJECT NO. 00947 Employee Classification Rate/Hour Principal $258.00 Project Manager/Planner $175.00 Senior Engineer/QA-QC $175.00 RPLS $100.00 Project Engineer $120.00 Design Tech. $90.00 CADD Tech. Clerical 2-Man Survey Crew $100.00 3-Man Survey Crew $120.00 4-Man Survey Crew $150.00 Reimbursables Cost + 10% Mileage $0.55 Per Mile Reproduction ►vork tivill be at carrrent commercial rates. Subcontractors tivill be paid for at actzral invoice cost plzrs te�� percent (10%). EXHIBIT "0-3A" SUMMARY OF TOTAL PROJECT FEES 2007 Critical Capital Project (Council District 5) Street Reconstruction, Water and Sanitary Sewer Replacement Contract 5B on Avenue M (Miller to Hughes), Edgewood Terrace South (Judy to Hampshire) & Valley Vista (SH10 to 1004eet South)) City Project No. 00947 SUPPLEMENTAL AGREEMENT No. 3 BASIC ENGINEERING DESIGN FEE: Estimated Construction Cost TSPE Curve A Basic Charge 15% Fee Reduction (Construction TOTAL CONSTRUCTION COST $ 6.5% 85.0% Basic Fee $ - SPECIAL SERVICES FEE M/WBE % M/WBE Field Surveys (ANA) $ 11,700000 $ 111700,00 100.0% SUBTOTAL (SPECIAL SERVICES) $ 11,700.00 $ 11,700.00 100.0% CONSTRUCTION SERVICES Construction Phase Services $ - $ - 0.0% As -Built Drawings $ - $ - 0.0% SUBTOTAL (CONSTRUCTION SERVICES) $ - $ - 0.0% REPRODUCTION (Assumes 1 contract with 1 total sheets) 8 Sets of Review Plans $ - $ - 0.0% 16 Sets of Preliminary Plans (Utility Clearance) $ - $ - 0.0% 50 Sets of Construction Plans $ - $ - 0.0% 50 Sets of Specifications $ - $ - 0.0% 2 Sets of As -Built Plans $ - $ - 0.0% 1 Set of Mylars $ - $ - 0.0% Mounted Exhibit for Public Meetings $ - $ - 0.0% SUBTOTAL (REPRODUCTION) $ - $ - 0.0% 10% SUB -CONTRACTOR MARK-UP TOTAL LUMP SUM FEE 1,170.00 $ $ 121870.00 90 PROPOSED M/WBE SUBCONSULTANTS PROPOSED SERVICES FEES %CONTRACT ANA Consultants, LLC Field Survey $ 11,700.00 90.9% TOTAL M/WBE (City MIWBE Goal = 18%) $ 119700.00 90.9% PROPOSED NON-M/WBE SUBCONSULTANTS NONE EXHIBIT "13-313" FEE SUMMARY 2007 CRITICAL CAPITAL PROJECT (COUNCIL DISTRICT 5) -CONTRACT 5C STREET RECONSTRUCTION, WATER AND SANITARY SEWER REPLACEMENT ON AVENUE M (MILLER TO HUGHES), EDGEWOOD TERRACE SOUTH (JUDY TO HAMPSHIRE) AND VALLEY VISTA DRIVE (SH10 TO 100-FEET SOUTH) CITY PROJECT NO, 00947 SUPPLEMENTAL AGREEMENT N0a * * *PAVING/DRAINAGE* OPINION OF PROBABLE CONSTRUCTION COSTS CURVE "A" 6.5% X 0.85 = 5.525% ENGINEERING DESIGN DESIGN SURVEY (ANA) REPRODUCTION TOTAL PAVING/DRAINAGE FEE TOTAL FEE $ 1,170.00 $ 11,700.00 $ 0.00 $ 12,870.00 $ 12}870.00 SUMMARY OF TOTAL FEE AND BREAKDOWN OF DESIGN FEE (LESS SURVEY FEE) A. SUMMARY OF TOTAL FEE Service Description Water Sewer Paving/Drainage Total Engineering Services $ 0.00 $ 0.00 $ 19170.00 $ 1,170.00 Surveying Services $ 0.00 $ 0.00 $ 115700a00 $ 11,700000 Total $ 0.00 $ 0.00 $ 125870000 $ 129870600 B. BREAKDOWN OF DRAINAGE FEES (LESS SURVEY FEES Total Paving/Drainage Fee (less survey fee) Breakdown by Concept, Preliminary and Final Design 1. Concept (30%) _(Total Water Fee —Survey Fee) x (0.3) _ $ 351.00 2. Preliminary (60%) _ (Total Water Fee —Survey Fee)s(0.6) _ $ 702.00 3. Final (10%) —(Total Water Fee— Survey Fee) r (0.1) _ $ 117.00 13-313(I ) EXHIBIT "0-3C" SUPPLEMENTAL AGREEMENT No.3 City Project Nos. 00947 BREAKDOWN FOR REPRODUCTION FEE AND ADDITIONAL SERVICES FEE FOR: None per this Supplement Agreement f33C-I EXHIBIT "0"+ OPINION OF PROBABLE COST SUMMARY 2007 CRITICAL CAPITAL PROJECT (COUNCIL DISTRICT 5) STREET RECONSTRUCTION, WATER AND SANITARY SEWER REPLACEMENT CONTRACT 5B ON AVENUE M (MILLER TO HUGHES), EDGEWOOD TERRACE SOUTH (JUDY TO HAMPSHIRE) AND VALLEY VISTA DRIVE (SH10 TO 1004EET SOUTH) SUPPLEMENTAL AGREEMENT NO.3 CITY PROJECT NO. 00947 City Proiect No. 00947: Avenue M, Edgewood Terrace South &Valley Vista Drive Water $ 0.00 Sewer $ 0.00 Paving & Drainage $ 0.00 TOTAL $ 0.00 Total Water $ 0.00 Total Sewer $ 0.00 Total Paving & Drainage $ 0000 GRAND TOTAL $ 0000 Page 1 of City of Fort Worth, Texas COUNCIL ACTION: Approved %# 9/16/2008 DATE: Tuesday, September 161 2008 LOG NAME: 302007CODIST5 REFERENCE NO.: C-23050 SUBJECT: Authorize Execution of an Engineering Agreement in the Amount of $451,313.00 with Dannenbaum Engineering Corporation, for Pavement Reconstruction and Water and Sanitary Sewer Main Replacements on 5A.Bideker Avenue, Bright Street and Burton Avenue; 513-Avenue M, Edgewood Terrace South and Valley Vista Drive; 5C-Capers Avenue, Osborne Lane, Ramson Terrace and Plant Avenue (Project Nos. 5A-009460 58-009471 5C-00950) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an engineering agreement with Dannenbaum Engineering Corporation, in the amount of $451,313.00 for pavement reconstruction and water and sanitary sewer main replacements on 5A—Bideker Avenue, Bright Street and Burton Avenue; 513-Avenue M, Edgewood Terrace South and Valley Vista Drive; 5C-Capers Avenue, Osborne Lane, Ramson Terrace and Plant Avenue (Project Nos. 5A-00946, 513-009471 5C-00950). DISCUSSION: On March 6, 2007, M&C G-15621 the City Council authorized the sale of $42,325,000.00 in Certificates of Obligation for the purpose of funding part of the Critical Capital Needs Program. That amount included funds for pavement reconstruction on the following streets: Street Limit Bideker Avenue Martin Luther King Freeway to Bishop Street Bright Street East Berry Street to Reed Street Burton Avenue Vaughn Boulevard to Campbell Street Avenue M Miller Avenue to South Hughes Avenue Edgewood Terrace South Judy Lane to Hampshire Boulevard Valley Vista Drive 100 Feet South of Hiighway hway 10 to East Hurst (H g10) Capers Avenue Stalcup Road to Farrell Lane Osborne Lane South Hampshire Boulevard to Old Handley Road Ramson Terrace Maceo Lane to Truman Drive Plant Avenue Craig Street to Cravens Road Dannenbaum Engineering Corporation proposes to perform the necessary design work for a lump sum fee of $451,313.00. City Staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount, $192,209.02: 5A: water; $25,550.00 sewer; $10,950.00 and streets; $56,812.26; Page 2 of 58: water; $16,060.00 sewer; $10,950.00 and streets; $28,707.26; 5C: water; $10,950.00 sewer; $10,950.00 and streets; $21,279.50 is required for project management by the Engineering Department. Dannenbaum Engineering Corporation is in compliance with the City's M/VVBE Ordinance by committing to 26 percent M/WBE participation. The City's goal on this project is 24 percent. This project is located in COUNCIL DISTRICT 5, Mapsco, 54W. 78R, 78S, 78T, 78U, 79E, 79L, 79M, 79Q and 79R. FISCAL INFORMATION /CERTIFICATION: The Finance Director certifies that funds are available in the current capital budgets, as appropriated, of the Water Capital Projects Fund, the Sewer Capital Projects Fund and the 2007 Critical Capital Program Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P275 531200 705170094633 722.00 P275 531200 705170094733 $1,150000 P275 531200 705170095033 $1,265eOO P265 531200 605170094733 2129.00 P275 531200 705170094631 2166.00 P275 531200 705170094751 2 251.00 P265 531200 605170095033 2 278.00 P275 531200 705170094651 2 372.00 P275 531200 705170094731 3 448.00 P275 531200 705170095051 3 541.00 P265 531200 605170094751 3 687.00 P275 531200 705170095031 W793_00 P275 531200 705170094632 4 333.00 P265 531200 605170094633 4 942.00 C295 531200 205400094733 $5,238uOO P265 531200 605170095051 $5,871900 C295 531200 205400094751 $5 938.00 P265 531200.605170094731 $ 386.00 P265. 531200 605170095031 $6L834.00 P275 531200.705170094732 $6A9800 P275 5312007051.70095032 $7�588.00 C295.531200 205400095033 $71900.00 C295 531200. 205400095051 $9t412.00 P265 531200 605170094732 $12,774,00 C295. 531200 205400094633 $131008.00 Page 3 of CERTIFICATIONS: Submitted for City Manager's Office b}C Originating Department Head: Additional Information Contact: ATTACHMENTS 1. 302007CODIST5-1.pdf (Public) 2. 302007CODIST5-2.pdf (Public) 3. 302007CODIST5-3.pdf (Public) P265 531200 605170095032 P265 531200 605170094651 P265 531200 605170094631 C295 531200 205400094731 C295 531200 205400094651 C295 531200 205400095031 P265 531200 605170094632 C295 531200 205400094732 C295 531200 205400094631 C295 531200 205400096032 C295 531200 205400094632 Fernando Costa (8476) A. Douglas Rademaker (6157) Dena Johnson (7866) $13,669.00 MOM $15, 606.00 $15, 712.00 $17,150900 $23, 700.00 $29,654.00 $31,426.00 $39,024.00 $47,401.00 $78,047.00