Loading...
HomeMy WebLinkAboutContract 37722 (2)City Project Number # 00726 INFORMAL DEVELOPER AGREEMENT TO BE EXECUTED BY DEVELOPERS WISHING TO LET THEIR OWN CONTRACTS FOR CONSTRUCTION OF WATER AND/OR WASTEWATER FACILITIES FOR (Project Name and Legal i �l(ECRETARIrr °.,ONTRACT NO Description) Chadwick Farms - Section 6 The undersigned DEVELOPER has familiarized himself with the City of Fort Worth's "Policy for the Installation of Community Facilities" governing water and/or wastewater facility installations and fully understands all the provisions, terms and conditions of that policy, and wishes to exercise the option contained in that policy permitting a DEVELOPER to let his own contracts for construction of such water or wastewater facilities. In addition to all other requirements of the City's Policy for the Installation of Community Facilities, the DEVELOPER specifically agrees to follow the procedures set forth below: 1. To employ a construction contractor who is approved by the Director of the Water Department. The requirements for such approval shall include, but not be limited to: a. The Contractor proposed to perform the work hereunder shall be prequalified as a bidder in the same manner that the City Water Department prequalifies bidders for City let contracts. The prequalification requirements for City let Water and Wastewater contracts are as follows: A current financial statement, and acceptable experience record, and an acceptable equipment schedule must be filed with the Director of the Water department at least two weeks prior to the hour for opening bids. The financial statement required shall have been prepared by an independent certified public accountant or an independent public accountant holding a valid permit issued by an appropriate state licensing agency, and shall have been so prepared as to reflect the current financial status. This statement must be current and not more than one (1) year old. In the case that a bidding date falls within the time a new statement is being prepared, the previous statement shall be updated by proper verification. Proposals submitted by a prospective bidder who has not fulfilled the above requirements shall be returned unopened. Liquid Assets in the amount of ten (10%) percent of the estimated project cost will be required. For an experience record to be considered to be acceptable for a given project, it must reflect the experience of the firm seeking qualifications in work of both the same nature and magnitude as that of the project for which bids are to be received, and such experience must have been on projects completed not more than five (5) years prior to the date on which bids are to be received. The Director of the Water Department shall be the sole judge as to the acceptability of experience for qualification to bid on any Fort Worth Water Department projects. The prospective bidder shall schedule the equipment he has available for the project and state that he will rent such additional equipment as may be required to complete the project an which he submits a bid. b. The Contractor shall meet the City's requirements for being licensed and bonded to do work in public streets. 2. To require the Contractor to furnish the Water Department performance bond and payment bond in the.name of the City and the Developer, and a maintenance bond in the name of the City on forms provided by the City, for 100% of the contract price of the facility, said performance, payment, and maintenance bonds to be furnished to the City before work is commenced. 3. To deposit with the Water Department an amount equal to 10% of the contract price for all facilities to be constructed by the Contractor employed by the DEVELOPER, prior to commencing of any construction work. Said amount shall be for the engineering services to be performed by the DOE Department In=house Design Section, if the Water Department has approved the plans and specifications for the work to be done. In this regard, if the DEVELOPER wishes to employ his own engineers to prepare plans and specifications, he may do CITY SECR ARY FT. WORTH, TX Revised: February 18, 2008 so, subject to the requirements of City's Policy for the Installation of Community Facilities (including waiver of all engineering charges) and to the further requirement that: a. Written approval by the Director of the Water Department of the plans and specifications so prepared shall be obtained prior to the employment of any contractor to perform the work contemplated. b. Approved plans and specifications shall be furnished to the Engineering Division of the Water Department prior to a Confirmation of Award of Contract being issued by the Department of Engineering Plan Review Division. 4. To require the Contractor to attend a Pre -Construction Meeting set up by the DOE Head Inspector prior to commencing construction of the facility or facilities so that inspection personnel will be available. 5. To make this agreement, as well as the General Specifications of the Fort Worth Water Department (except as they are modified by the plans and specifications approved by the Director of the Water Department to govern construction of the work) an integral part of any contract with a contractor to construct any or all of the facilities involved. 6. To require the Contractor to allow the construction to be subject to inspection at any and all times by Department of Engineering Construction Inspection forces and not to install any Wastewater or water facility unless an inspector designated by the Director of the DOE is present and gives his consent to proceed. 7. To require the Contractor to pay for such laboratory tests made as the City may require. 8. To secure approval by the Director of the Water Department of any final payments, or if there is City Participation, all partial payments to the Contractor, such approval to pertain only to satisfactory completion of the work for which payment is made and not to constitute approval of the quantities on which payment is based. 9. To delay connection of any buildings to service lines of wastewater and water mains until such wastewater, water mains, and services have been completed to the satisfaction of the Water Department. 10. To furnish simultaneously with the execution of the construction contract let by the Developer, performance and payment (developer) bond in the name of the City of one hundred percent (100%) of the estimated contract cost of the related water and/or wastewater construction, as stated in the construction contract, to guarantee timely payments to the Contractor for completed work and/or to guarantee satisfactory performance of this agreement and substantial completion of the water and sewer facilities to be installed. If the deposit is in the form of cash, the deposit shall be for one hundred twenty five percent (125%) of the estimated developer's share of the cost of the Water and Wastewater facilities. In addition, developer shall pay to the City in cash for the construction inspection fee equal to two percent (2%) and a lab testing fee of two percent (2% for those started after December 14, 2005) of the developer's share of the construction cost of related water and/or wastewater facilities as stated in the construction contract. 11. Work hereunder shall be completed within two (2) years from date hereof, and it is understood that any obligation on the part of the City to make any refunds with respect to water and/or wastewater facilities shall cease upon the expiration of two (2) years from date hereof, except for refunds due from "front foot charges" on water and wastewater mains, which refunds may continue to be made for a period of ten (10) years commencing on the date that approach mains are accepted by the Director. If less than 70% of the eligible collections due to the developer have been collected, the Developer may request in writing an extension of up to an additional 10 years for collection of front charges. The DEVELOPER further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said DEVELOPER, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Revised: February 18, 2008 i It is expressly understood and agreed by the parties hereto that execution of this agreement does not bind the City of Fort Worth to participate in or contribute to the cost of any of the improvements described herein; nor shall the City of Fort Worth be responsible or liable for any portion of the costs incurred by the developer, its officers, agents, employees, contractors or sub -contractors for the design and construction of the improvements described herein, unless and until the parties hereto execute a Formal Community Facilities Agreement, duly authorized by the City Council at a regular meeting, signed by the City Manager, and providing for the City's participation in the costs of said improvements. This agreement pertains to water and/or wastewater facilities required to serve the following described property and project: Chadwick Farms —Section C ACCEPTED FOR FORT WORTH WATER DEPARTMENT: By: h DATE: ACCEPTED A,S�TjO FORM FORT WORTH L/Fr�AI rig FERNANDO COSTA, ASSISTANT CITY MANAGE DATE: 1401 Aw W IF DEVELOPER: (print developer entity) Kimball Hill Homes Chadwick Farms, L.P., a Texas limited partnership, successor�•by merger to Kimball Hill Homes Dallas, L.P., a Texas ljqited partnership Jeff Kullman, Division President (print name and title) DATE: Gd FFFFFFFFF Water Project # P 264-602150072683 Contract Amount for Water Improvement $ 183, 616.37 (See Attached Exhibit "A" for Water Layout and Cost Estimate) Sewer Project # P274 702130072683 Contract Amount for Sewer Improvement $106, 217.42 (See Attached Exhibit "A-1"for Sewer Layout and Cost Estimate) City Project Number # 00726 DOE # 5633 Related Plat Case # �-07-018 Related Building Permit # (If Applicable) (If Applicable) (Need 3 copies with original signature on each.) Mail to: Ms. Stephanie Francis, E.I.T. City of Fort Worth Water Engineering and Planning ' • FNQ �JZIRED 1000 Throckmorton Fort Worth Texas 76102 , CITY SECRETARY 1 Revised: February 18, 2008 N�I� ���itd�ti Secretary F; 0 a 3 0 z 0 W 0 0 N c a M M m w NTS CITY OO F FORT I I'OO RTH. TEX.aS Kimball Hill Homes DALLAS DIVISION 3010 LBJ FREEWAY, STE. 1100 DALLAS, TEXAS 75234 Phone (972 1 481-2200 2405 Mustang Drive, Grapevine, Texas 76051 Metro (817) 329-4373 } J } m o � w � N n w a N LEJ F a z w a z > w o J Z p a J w J } p > a LLJ S U a� L = F wp M u vz a u ~ N z inLLI z U z rA a U IL U n- o N �n O toU) O to QY X Ir X K X o a w a w a w z W O w S. / GI C1 \ Of £1 �( L �r -Q \ \ L NOO•. 9 P,FV g � SI 9£ ! b£ 1l1 t X11 ` Z �����Hjj� ^61 £Z 61 ZZ --OZ —Z OilIt Y� W Y� W a o o cn O W S a w J w O J ZO w S J Q _z W 3i W U) W 1n w } cn > cn Ir Cat r W® a aza z a N a V) a N z N z `9 o a O n a O u7 X n- X q a w n- w z • o W tf 8i w sl J 91 bl S \ all 11 5 S/ ZI K15 Of 13/ If / B / 01 6 £I \ 9 / 9 X.7 L 0• 91 W £ b of LI j ZZ ,. \L S Z to bEof co 936 If as J7 _.---tt 9 at at � Z£ b £ •. 8 \ \ 9£ I£ 9 9 B9 , £9 �. 91 !8 69 • OG1C L z OL Z9 �_ A z 6ZI Z£ J ttt 8cp of e I £ -- _ 6 CD �Q' 19 09 91 --- .. 99 69 jCD11 00 X0078 O£ OI 1 99 99 L9 61 -- ._ 09 tit N/ d ZI OF II 3b £9 �I LZ £1 . z9 1 Is o9 bl 8' S.S. LINE 9b 9Z � S� _ . SI IL.IC CTAT I bb � bZ b .9i i , ob 1b IZ X0078 �- - - -_ Z2 go la�££ Z£ 6! 92 1 Of 1 !' o£ ! sZ 8Z cz 9Z 3NI b 6 9! L I QS( O O N n 007f1 t i � Al N Li:Y3S!S3 � t -- X3I1f1Q V Ii3MLI.SIX'3 Project : CHADWiCK FARMS PHASE B Owner: Kimball Hill Homes Location : Ft. Worth, Texas Date : July 21, 2008 We propose to provide equipment, labor and material to perform the following operations. Our proposal is to Include these items as specifically listed, all other work items or materials are excluded. Quantities are approximate and based on our interpretation of the plans, invoicing and final contract price to be determined by measured installed quantity. This quote is void after thirty days from proposal date. This proposal is based on the civil drawings prepared by Goodwin & Marshall dated April 10, 2007. Water ;.�}�t�flt`aIi3�ii , " sZ93T1, .. •'''�t�..� �• . '�it[�.f� .. 1 8" DRA4 PVC Water Main 4,806 LF $ 15.17 $ 72,907.02 2 8" Gate Valve & Box 9 EA $ 902.68 $ 8/124912 3 Fire Hydrant Assembly 7 EA $ 21773014 $ 19,411698 4 1" Copper Water Service 154 EA $ 446.37 $ 68,740.98 6 Cast Iron Fittings 1.8 TN $ 41267,04 $ 7,662.67 7 Connect to Existing Stub -Out 6 1 EA 1 $ 300.00 1 $ 1,800.00 8 Concrete 5 CY $ 82.50 $ 412.50 9 Trench Safety 4,606 LF $ 0.20 $ 961.20 10 Water Testing 41806 LF 1 $ 0.15 is 720.90 5untotai ror Water; $ iau,ry I.sr Catiitan� �AWAr 8" SDR-35 PVC Sewer Main 21600 LF $ 15.25 $ 39,650.00 1 2 8" SDR-26 PVC Sewer Main 204 LF $ 16.17 $ 3,298.68 3 4' Diameter Manhole 9 EA $ 1,892.55 $ 17,032.95 4 Extra Vertical Depth for 4' Diameter Manhole 17 EA N/C N/C 5 4" SDR-26 PVC Sewer Service 57 EA $ 381.32 $ 21,735.24 6 4'{ SDR-35 PVC Sewer Service 45 EA $ 358.37 $ 16,126.65 7 Connect to Existing Sewer Main 2 EA $ 300.00 $ 600.00 8 Trench Safety 20804 LF $ 0.35 $ 981A0 9 Sewer Testing 2,804 LF $ 1.25 $ 3,505.00 10 Concrete 5 CY I $ 82.50 $ 412.50 SubtOtHt For sanitary sewer : $ 903,341.4t 6831 Ash Street -Frisco, TX 75034 Office 972 335-4510 Fax 972 712-0971 Srnrm main tic�tiE` . :..... A#�cri ri€kt .. ........:. .. 1�uatf►f.. . Uttrt Prue :: ���extti� 1 20' Std Curb Inlet 2 EA $ 3,600.00 $ 7,200.00 2 15' Std Curb Inlet 2 EA $ 3,190.00 $ 67380.00 3 27" CLIII RCP 406 LF $ 43.15 $ 17,518690 4 21" CLI I l RCP 30 LF $ 34.43 $ 1,032.90 5 Connect to Existing 27" & Remove HW 1 EA $ 500.00 $ 500.00 6 13' x 3' Strom Manhole 1 EA $ 2,200.00 $ 2,200.00 7 JTrench Safety I 438 LF $ 0,20 $ 87.20 Subtotal For Storm Drain :34,8'tB.vU Bonds i F.W. P & P Bonds w/ 2nd yr 100% Maintenance 1 LS 1 $ 8.625.00 $ 8,625.00 This nroaosal daes rat Include the foliowinta kerns - Inspection Fees Permits - Impact, Tap Or Connection Fees - Construction Staking or Surveying - Engineering Control Water Meters - Electrical Conduit Or Work - Landscaping Tree Removal Or Replacement - Right-0f-Way Clearing - Hydromulch, Seed Or Sod Grand Total : $ 327,627.79 - Construction Materials Testing - Traffic Control Plans - Adjustment Of Existing Utilities - Removal Or Replacement Of Paving - Erosion Control - Staom Water Management Plans - Import Of Select Material For Backfill - Offslte Export Of Spoils -Process Or Compaction Of Spoils - Final Adjustment In Paving Areas W e will require 23 working days for substantial completion and 7 working days for final completion. Respectfully Submitted, Rich Elliott Rodman Utilities 469-576-3493 6831 Ash Street -Frisco, TX 75034 Office 972 335-451 Q Fax 972 712-Q971