Loading...
HomeMy WebLinkAboutContract 52367-AR2 4 CSC No.52367-AR2 RECEI\/ �RT APR 1 'VYnRTH. City of Fort Worth 2020k'e Construction Allowance Request Breakdown CiTY OF RWMffkn CA# Date 1WI0120 FT7 City Sec# 52367 —� cinr SEMETMY Client Project#(sA CO2288 FAC#(sJ 34014-0200431-5740010-0O2288-2015-14010199 Project N Timberland Boulevard Phase 3-Park Vista to US 377 Descrlpbw Contr-aclod McMahon Contracting L.P. City Inspector Mark McFaclin Funding 34014 30104 39008 Select Day Type Allocation Account Totals Original Contract Amount $2,925,291.77 $519,973.00 $600,000.00 $4,045,264.77 Extras to Date Credits to Date Current Contract Amount $2,925,291.77 $519,973.00 $600,000.00 $4,045,264.77 Amount of Proposed Allocation $54,313.28 $0.00 $0.00 $54,313.28 Original Allowance Available for Allocation $300,000.00 $300,000.00 Allowance Funds Previously Allocated $34,216.16 S34,216.16 Remaining Funds Available for this Allocation $265,783.84 $265,783.84 JUSTIFICATION SUN MARY IN ACCORDANCE WITH THIS CON STRUCTiON ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:This construction allowance request is to add Items 47C,47D,668,66C, 133D,193A, 193B and Remove Item 23. Pavement in TxDOT Right of Way was designed for 10"Concrete on 4'Type D Hot Mix Asphalt on 10"Lime Treated Subgrade. TxDOT requested the 4'Type D base layer be Superpave instead(an alternate version of asphalt mix). Item 47C is being added to replace Item 23. Item 47D is to remove and replace a fence on adjacent gas well site in order to build a retaining wall on the back of the 10'sidewalk. 66B and 66C are for major and minor sewer manhole adjustments and are two items that were needed and shown in the plans but not included as pay items. Item 133D is added to provide a temporary traffic signal solution at the 377 intersection for when the railroad crossing is closed. 193A is for a blow off valve on Keller's waterline,the blow off valve was in the plans but wasn't included as a pay item. 193E is explorartory work to confirm where/how the Keller waterline was to be built. The contractor found in 2 places the existing waterline had already been upgraded to the proposed plan and contractor needed to do some explorartory digging to find had already been done. 193A and 193B will be paid by City of Keller and they have approved the two items. C.frK� v. c By: C Company (Please Print) k17 O/-r �/� Signature: Address Z/A4,P-?;r- 6npw'r/ Title- r/plecxf City/State/Zip (Please Print) Date: ,r./ 9rl/f It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. JT Auldridge Name of Employee/Signature Senior Project Manager Title 11 This form is N/A as No City Funds are associated with this Contract Printed Name Signature Q ATTEST: Mary J. Kayser, City Secretary FROAL RECORD CCTV SEC R E-TrARYy FT OR'T�,`TX 0 ti cD M N Lf) C CD O O CZ) O CD co p 00 O O O • O LL 0 O O O O M U N - LO LO � - LO U CV M (Y N (1) Y C U) (d _T U LL_ Q Q cn Q cn J W W J W J O U O O O O CD O U ID O CD CD CD CD CDn C LC) N 3 _T cli O Ym � O L N 40 }i O (6 N d CL O 0) N O Q Z CDCD O CD O O .O _O IT M M M M M M ❑ N 4� M (D r Q O U Q o 0 O Ln > o x (� LV m m CO d L 00 cn ++ N M OS y NO N L a O o L 0 0 = Y Y U CD 0) cu � 2 ti � E- � � � Ln 0) U M O CO 0) N 2 Q c U) 'C 2 S CD O CN N O @ 0 Q CO w xCO a`� m o m m m U o o 0 2) w = c o o k 3 _o O O) C C U > > LL 0) 0) > > 5 U Z m cu U) � a W O Z oO o ) m o L a) Q Q a) � LL_ 0- o U o o ~ 2 o o d m m c m a O - LD U M cfl W f�l ` !N o m U � m U ti cfl Q M w m LL,I- CO CO 0 ti M N LO C co (n L.L O U U U Y O U c o` U U N 0 C w 3 2-1 L.) U 0 O LLJ LLI m m ML � W O d L O LLJ �J ^) O L U > Li w U � O V Q p LL O N 3 J L o o Cl) Q o U Q z o o o O m O "° U }' y_ N co M z 0 NO � O U m U o L d J O -0 0) O C L? N U C6 7 M O C o m U o c c N M c5 C6 O U co L N V co F NO U C Eo co m z - Q c co Ey p oLLU U U ca- LL 0- N c � d F�M o U CD 0 0 0 co 0 o m cfl o o (A:) o cfl en o cc (&: 0 0 0 0 � c3 uo c- 0 ,1- oo a) 0 o C) 0 0 V O O) Cb C') co C') -C) U) lD O U7 (1) ti4 co d C O v v C] v O bA C rb L U MWWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT Total $0.00 B AUTODESW BIM 360 fortworthgov)CO2288-Timberland Blvd and Park Vista Blvd, 0 MJ Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES Reviews > Reviewdetail CLOSED #24 Timberland Construction Allowance Request#2 Export Report - This review is closed. Names Description Version Markup Comments Approval st: PROGRESS CO2288-Construction Allowance Requ- -- V1 0 No comments yet. `Approve Initiator Initial Review n p CO2288-Construction Allowance Requ... -- V1 0 No comments yet. L Approve MA Mitch Aiton Oct 14,102 PM RFI 04-4Inch Superpave.pdf -- V3 0 No comments yet. Approve <mitch.ai ton @ fortworthtexas.g ov> Submitted to Reviewer 1 Construction Allowance Request#2- RFI OS-Gas Well Site Fence Replacem._ -- V1 0 No comments yet. L Approve RFI's are attached to explain and show the need for the pay items.Two RFI 06-Major Adjustment to Sanitary- -- V1 0 No comments yet. Approve Items are for City of Keller and their approval are attached in the RFIs. Keller has capacity in their ILA to d RFI 07-Minor Adjustment to Sanitary_ -- V3 0 No comments yet. `1 Approve absorb any additional pay items. m RFI 08-377 Temp Traffic Signal for Rai-. -- V1 0 No comments yet. Approve Reviewer 1 Initial Review 1 n e RFI 09-6Inch Blow Off Valve with Con_. -- V1 0 No comments yet. Approve Jennifer Roberts Oct 16,12:56 PM <jennifer.ro bens@ fortwor[htexas.g ov> Submitted to Reviewer 2 Program Mngr has reviewed and approved Allowance Request#2. Reviewer 2 Initial Review 2 LP Lauren Prieur Oct 16,5:07 PM <lau ren.prieu r@ fortworthtexas.g ov> Submitted to Reviewer No comments Reviewer3 Initial Review3 n WJ William Johnson Oct 22,12:49 PM <william.johnson @fortworthtexas.gov> Submitted to Reviewer Reviewer 4 Initial Review 4 n DB Douglas Black Oct 25,2:01 PM <d oug.black@ fortwort htexas.gov> Submitted to Approver Approved. Approver Final Review n DB Dana Burghdoff Oct 25,2:07 PM <da na.bu rg hd off @ fortworthtexas.gov> Review ended Review closed OFFICIAL RECORD CITY i SECRETARY FT. WORTH,TX C )