HomeMy WebLinkAboutContract 37219 CITY y DRET kR 22,a F t ..: t N4ed -3 Amendment No. 3 STATE OF TEXAS § CITY SECRETARY NO. (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and TCB, Inc., formerly known as Turner, Collie & Braden, Inc., (Engineer) made and entered into City Secretary Contract No. 31833 (the Contract) which was authorized by the City Council by M&C C-20660; and WHEREAS, the Contract involves engineering services for the following project: Pavement Reconstruction and Water and Sanitary Serer Replacement on Provine Street (Normandy Road to Ederville Road), Norma Street (north Hughes Avenue to north Edgewood Terrace), Morris Court (Rand Street to East Dead End), City Project No. 00170 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 23, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $5,200.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $138,912.40. . ORIGINAL Contract Amendment No. 3 Page 1 of 2 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Executed on this the � —' day of 2008, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: v� A. Douglas Rademaker, P.E. Fernando Costa Director, Department of Assistant City Manager Engineering TCB, Inc. ENGINEER ATTEST: Marty�Hend x, City Secretary Name: Ann E. Kovich, AICP Vice President 1200 Summit Avenue, Suite 600 Fort Worth, TX 76102-4409 NO M&C REQUIRED APPROVE S TO F, ND LEGALITY: i Amy ey Assis nt City Attorne R� Contract Amendment No. 3 Page 2 of 2 TCB I AECOM TCB 1200 Summit Avenue,Suite 600,Fort Worth,Texas 76102-4409 T 817.698.6700 F 817.698.6701 www.tcb.aecom.com (Memorandum Date 05-23-08 To Richard Argomaniz, PE From Matt Abbe, PE� � Subject Morris Court Additional Design Effort Supplemental Authorization 03 Distribution File On May 15,2008,TCB,the City of Fort Worth,and the contractor met at Morris Court with some residents of the court that will be affected by the street construction of the cul-de-sac. The radius of the court's cul-de-sac will be widened from about 70-feet to 80-feet. This widening will impact homeowners'yards around the court. One resident in particular has been vocal about the widening and would like for the impacts to be minimized as much as possible. The meeting was set to explore different options to reduce the impact of the construction. At the conclusion of the meeting, two options were suggested,one option is to construct a retaining wall around the court and the other is to raise the profile of the court. The retaining wall would be an expensive addition to the project,and thus,the City of Fort Worth asked TCB to explore the second option of raising the pavement of the cul-de-sac. The City of Fort Worth said that they would give TCB a supplemental agreement to the existing Provine-Norma- Morris contract to review this second option and to prepare revised sheets detailing the option. The purpose of this memorandum is to request additional compensation for the required work. The following tasks are necessary for the review and design modifications of the cul-de-sac of Morris Court. The fees associated with these tasks are provided in Attachment A. 1. Review Possibility of Raising the profile on the Court—This task includes the time for reviewing the feasibility of raising the profile of Morris Court,including reviewing driveways around the court. The fee required to perform this task is$1,040. 2. Redesign the profile of the Court—This task is necessary to modify the Morris Court Plan and Profile sheet showing the cul-de-sac, as well as modifications to cross-sections for the cul-de-sac. TCB will revise the plan and profile sheet showing the centerline profile,the top of curb profiles,and spot elevations. The fee required to perform this task is$3,160. 3. QA-QC—TCB will provide quality control and assurance during the preparation of the plans and details pertaining to this supplemental. TCB estimates that the fee required to perform this task is$1,000. P:\FTW\21421470001_Provine-Norma- Mords\Project\10Project Admin\12Contract\SA#3\Argomaniz Memorandum 05-23-08 SA 3.doc Page 2 The total fee to perform the work described above is$5,200. This fee is shown in Attachment A. TCB is grateful for the opportunity to work with the City of Fort Worth and looks forward to preparing design plans for this project. If you have any questions or comments,please contact Matt Abbe at 817-698-6722. TO I AECOM ATTRCHMENTA Task Foo Esllmate Provine Outfall Drainage Improvements•Supplomental Authorization No.3 '— Naftelsuorlof TCB Mon-Labor Subaonsuhama Non. F1TIEm. Prof Prof Prej Sd. Total Labor Tot w/ Qorfandona Taw! Labor Total Tark Ooacrl tion Dir r Sr T�df Tech Gar Hours Fea Ro o Tray Cour IXlr�r Mult Surve Must Tout Fae ScoPe amerlhl Authorization No.3 OeflUd t lteNcvr as of ra%l As MD Court 70 1010 $1.040 2 RMaprofift of tfn court 2 12 24 30 31 0 f 160 3 4 IODO0 ft SUP PL ENTAL AUTHORIZATION NO.3 TOTAL 2 1 1 2 34 ff 200 f f0 f0 15200