HomeMy WebLinkAboutContract 51905-A1 CSC No. 51905-A1 AMENDMENT No.1 TO CITY SECRETARY CONTRACT WHEBEAIS, the City of Fort Worth (CITY) and Dunaway Associates, LP, (ENGINEER) made and entered into City Secretary Contract No. 51905, (the CONTRACT) which was authorized by M&C C-28993 on the 15t' day of January, 2019 in the amount of $773,613.00; and R'EFAM.AS, the CONTRACT involves engineering services for the following project: Water, Sanitary Sewer and Paving Improvements for 2018 CIP Year 2, Contracts 17 and 18; and WEDEBMS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated February 12, 2020, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $26,387.00. (FID: 34018-0200431-5330500-101477- E02430-9999-18010199) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $800,000.00. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. CITY SECRETARY Page -1- FT. WORTH,TY EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Dunaway Associates, L.P. x_ " - �' 20fol Dana Burghdoff Kervin M. Campbell, P.E. Assistant City Manager Civil Engineering Executive DATE: Apr 17,2020 DATE: April 10,2020 APPROVAL RECOMMENDED: Christopher 1i rder(Apr 13,2020) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. fair DPr's 10�n5a0N Dena Johnson; P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: N/A Date: N/A DBlack(Apr 17,2020) Douglas W. Black Senior Assistant City Atto. . ATTES7ykj .), c Mary J. Kayser .' City Secretary t OFFICI .,> CITY SECRETARY Pa a -2- FT. WORTH,T g I DUNAWA y DA No. 0004465 February 12, 2020 Ms. Dena Johnson, P.E. Project Manager City of Fort Worth Water Department Fort Worth, Texas 76102 Reference: Amendment No. 1 —Willing Avenue Adjustments Combined Water, Sanitary Sewer and Paving Improvements for 2018 CIP Year 2, Contracts 17 and 18 Water Project No. 56002-0600430-101477-001780 Sewer Project No. 56002-0700430-101477-001780 City. Project No. 101477 Dear Ms. Johnson: Dunaway Associates, L.P. is pleased to present this Amendment No. 1 for the following additional requested services to complete this project with the revisions as have been requested. To fully detail the scope of services to complete this project, the following synopsis of past events is summarized here: 1. Adjustments to Livingston as this was designed as a full reconstruction project. Revised to limit the construction. 2. Adjustments to James Avenue as this was designed as a full reconstruction project. Revised to limit the construction. 3. Willing Avenue Curb Adjustments — Dunaway was requested to pull the curbs inward on this section of street in order to save trees. In turn, driveways had to be adjusted. 4. Additional minor adjustments that may be required to complete this project. It is understood that this contract contains a $30,000 contingency. • Amendment No. 1 February 12, 2020 Page 2 Contract Summary Contract Description Fee Livingston — Paving Design Revisions $12,120 James— Paving Design Revisions $14,255 Willing — Paving Design Revisions $16,950 Additional Minor Adjustments $13,062 SUBTOTAL $56,387.00 LESS CONTINGENCY $30,000.00 TOTAL PROJECT $26,387.00 A summary of the total project is as follows: Contract Description Fee Original Contract $ 773,613.00 Amendment No. 1 Revisions as described above $ 26,387.00 TOTAL PROJECT $ 800,000.00 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES, L.P. Bryan Sherrieb, P.E. Discipline Lead 4465 Amendment#1 Willing Adjustments-20-0323.docx