j Q R)RT WORTH City of Fort Worth
Change Order Request
Project Rimal FY 17 C09 Street Reps and Reconsiruction Gy Sec 8 r 52481
Cued PmIW 1(sj COM&Cfr1445
Pmtecf oaa oon FY17-CD 9 SUeei Repair and Recon Program.This is a combined street paring irproviemerib and water aid sanitary
sewer man replacernents poled in the Now SouBside Medical Oistrfel
ConlraclorLSlahie&tNigr,Inc. Change Order 8 l—_J Dale 4/13/7A20
CityProjeclAtcl Mary Hama O 4 f.s r e t City Inspector Louie PiLi
Dept. Water Unit 1 Sewer Unit 2 TIPW Unit 3 Totals Contract Time
Original CardractAmount $1,166,168.50 S446,236.00 $2,290,810.50 $3,903,205.00 365
Extras to Date 39
Credits to Dale
Pending Change Orders(in M&C Process)
Contract Cost to Dale $1,166,158.50 $446,236.00 $2,290810.50 $3,903,205,00 404
Amount of Proposed Change Order $42 009.00 $0,00 $0.00 $42,009.00 25
Revised Contract Amount $1,208,167.50 $446,236,00 $2,290,810.50 $3,945,214.00 429
Original Funds Available for Change Orders $58,308.50 $22,312.00 $114,541.00 $195,161.5D
Remaining Funds Available for this CO $58,308.50 $22,312.00 $114,541.00 $195,161.50
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $4,879.008.25
JUSTIFICATION(REASONS)FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST,THE CONTRACTOR SHALL.Furnish all labor and material as per attached
proposed Change Order Requost: Record Drawings showed an existing W WL to extend through the Intersection of College Ave and Broadway
which the Contraelor dWnl find.This Change Order will add bid items to connect the new 8'Water Line is Broadway to the existing 17 in
College Ave including replacing the concrete panels and traffic control to detour traffic while wodMg in the intersection.
Il Is understood and agreed that the acceptance of this Change Order by the contractor consUlules an accord and satisfaction and represents payment
in full(both lime and money)for all costs arising out of,or incidental to,the above Gunge Order. The PrgecVProgram Manager signing below
acknowledges that helshe Is the person responsible for the monitoring and administration of this contract,Including ensuring all performance and
reporting requirements.
Contractors Company Name Contractor Name tr l5 nature Date
Stabile&Winn,Inc. a @ ^{ 'Ataso / 2ozo
if(silectoutraeciion Su ervisor Dale Project Mana erlPro ram Manager Dale
Assislanl Director De t Dale Director, Department(Dept) Date
—fool s . o 14 tl n =a M . Apr20,202C
AssistanlCti Attorney Dale Assistant City Manager Date
49;��
o.uw ,pm Apr 20,2020 Apr 20,2020
Council Action if required)
M&C Number NIA M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORi'H,TX
i
ro ur r�)l"I'li City of Fort Worth
Change Order Additions
Project Name FY 17 CD9 Street Repair and Reconstruction Gily Sec# 52481
I
Client Project# CO2388&CO2445
Project Description FY17-CD 9 Street Repair and Recon Program.This is a combined street paving improvements and water and sanitary sewer main
replacements project in the Near Southside Medical District
Contractor Slabile&Winn,Inc. Change Order# Dale 411312020
City Project Mgr. I Mary Hanna City Inspector Lome Pills
ADDITIONS
—I1'EF1 DESCRIPTION =r--- ty Unil r3itCosl oa
18 8'DIP Water Line lowering Water Unit 1 1.00 EA $8,084.00 SB,UiL4 60
17 Concrele panel Remove and Replace Water nil 89.00 SY 295.00 $fir 255 lfU
18 8'Flex base Subgrade Icl.Excavation Water Unit 89. 0 SY 3 $ .0
I- Re-Staking Water Lune Alignment aler rot LS --mom.
50050U.-5 lic Control TCP&Closure Water Unit 1L 5 $4,50U UU
Water Unit 1 $42,009.00
Sewer Unit 2 $0.00
TIPW Unit 3 $0.00
Sub Total Additions 42,009.00
Change Order Additions Page 2 of 4
Forrr Wotsrti City of Fort Worth
�r Change Order Deletions
Project Name I FY 17 CD9 Sheet Repair and Reconstruction City Sec# 524II1
Client Project# I CO2388&CO2445
Project Description FY17-CD 9 Street Repair and Recon Program.This is a combined street paving improvements and water and sanitary sewer main
replacements project in the Near Soulhside Medical District
Contractor F Stabile&Winn,Inc. Change Order# Date 4/13I2020
City Project Mgr. I Mary Hanna City Inspector Lorde Pitts
DELETIONS
ITEM ESCRIPTION DEN Gly Unit Units o a
i
LIM
Water Unit 1 $0.00
Sewer Unit 2 $0.00
T/PW Unit 3 $0.00
t— ub Total Deletions 0.0
Change Order Deletions Page 3 of 4
t
i
MNVBE Breakdown for this Change Order
MWBE Sub Type of Service Amount fortfis CO
N/A - -
5
E
Total
Previous Change Orders
-co
None it
i
fi
5
€FF
F
Total = $0 OOs
1
i
i
I
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.