Loading...
HomeMy WebLinkAboutContract 52748-A1 CSC No. '50L-74F -A 1 Lis�co���o2p20 AMENDMENT No.1 TO CITY SECRETARY CONTRACT R'HEREAS, the City of Fort Worth (CITY) and Raymond L. Goodson, Jr. , Inc. , (ENGINEER) made and entered into City Secretary Contract No . 52748, (the CONTRACT) which was authorized by M&C 19-0049 on the 21st day of August, 2019 in the amount of $248, 820 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacement Contract 2019, WSM-C; and W ',REAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated March 10, 2020, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $48, 600 .00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $297, 420 . 00 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EECOR®ETARY H,TX Page -1- EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Raymond L. Goodson, Jr. , Inc. Dana Burghdoff( r 17,20 Dana Burghdoff Brent E. Lewis, P.E. Assistant City Manager Senior Associate DATE: Apr 17, 2020 DATE: 4/9/2 0 APPROVAL RECOIMNDED: v Christopher H rder(Apr 13,2020) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Leon Wilson, Jr. , P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: M&C: 20-OL79 LQV.V-- Date: 04/07/2020 41t1•e1!7•biO DWlt (Apr 2020) Douglas W. Black , . Senior Assistant City Attorney ���RT•�P ATTEST: i Mary J. Kayser City Secretary Page -2- [RLQ March 10, 2020 Mr. Leon Wilson, Jr., P.E. Senior Professional Engineer City of Fort Worth—Water Department 311 W. 10t' St. Fort Worth, Texas 76102 Re: Water and Sanitary Sewer Replacement Contract 2019, WSM-C City Project No. 102170—Proposed Contract Amendment No. 1 Mr. Wilson, As discussed in a meeting on January 16, 2020, the City of Fort Worth has requested that RLG increase our scope to include the design replacement of the existing 10-inch water line in N.W. 271h St. from Macie Ave. to Robinson St. (approx. 700 ft.). Additionally, RLG is to include the design replacement of the existing 24-inch C.I. water line in N.W. 27th St. from Long Ave. to Robinson St. (approx. 2,850 ft.) and include a corrosion protection design for the bid alternate 24- inch water line materials of Ductile Iron (D.I.), Steel, and Concrete Pressure Pipe. RLG proposes to perform the professional services associated with this Amendment No. 1 for$48,600. Project Costs to date are as follows: Original Contract Amount $ 248,820.00 Amendment No. 1 Amount 1 48,600.00 Revised Contract Amount $ 297,420.00 If you have any questions, or want to discuss the additional scope in more detail, please feel free to give me a call at(817) 709-7737 or e-mail me at blewisArlginc.com. Thank you, Brent E. Lewis, P.E. Senior Project Manager Attachments CIVIL ENGINEERING DALLAS,TX STRUCTURAL ENGINEERING www.rlginc.com FORT WORTH,TX SURVEYING Teas PE Rey.pF493 TSPL5 Reg.VW30-00 IDFPR FORENSICS,REPAIR&STRENGTHENING Lk—No.184.007358 PEORIA,IL City of Fort Worth,Texas Mayor and Council Communication DATE: 04/07/20 M&C FILE NUMBER: M&C 20-0179 LOG NAME: 6019WSMCRLGFUNDING SUBJECT Adopt Appropriation Ordinance in the Amount of$48,600.00 for Increased Project Costs for the Water and Sanitary Sewer Replacement Contract 2019,WSM-C Project(COUNCIL DISTRICTS 2 and 7) RECOMMENDATION: It is recommended that the City Council adopt the attached Appropriation Ordinance increasing the estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of$48,600.00 transferred from available funds within the Water&Sewer Fund for the purpose of funding the Water and Sanitary Sewer Replacement Contract 2019,WSM-C project(City Project No. 102170). DISCUSSION: On August 21,2019(M&C 19-0049),the City Council authorized an Engineering Agreement in the amount of$248,820.00 with Raymond L. Goodson,Inc.(City Secretary Contract No.52748),for Water and Sanitary Sewer Replacement Contract 2019 WSM-C. The additional appropriations in this M&C will fund costs associated with proposed Amendment No. 1 to the contract for additional design to replace an existing 244nch water main on NW 27th Street from Long Avenue to Robinson Street. Appropriations for Water and Sanitary Sewer Replacement Contract 2019,WSM-C are as depicted below: Fund Existing Additional Project Appropriations Appropriations Total" W&S Capital Projects- $352,573.00 $48,600.00$401,173.00 Fund 56002 General Capital $62 328.00 $0.00 $62,328.00 Projects-Fund 30100 _ J Project Total $414,901.00 $48,600.00$463,501.00j' *Amounts rounded for presentation purposes. The project is located in COUNCIL DISTRICTS 2 and 7. A Form 1295 is not required because:This M&C does not request approval of a contract with a business entity. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies upon approval of the above recommendation and adoption of the attached appropriation ordinance,funds will be available in the Water and Sewer Capital Projects(W&S Capital Projects)Fund 2019 WSM-C project. Prior to an expenditure being incurred,the Water Department has the responsibility of verifying the availability of funds. Submitted for City LManager's Office by: Dana Burghdoff 8018 Originating Business Unit Head: Chris Harder 5020 Additional Information Contact: Leon Wilson 2387 a� _N O Q X X 0 0 0 Q a a d CL c c c o .. .. o '• o .. Q Q Q E co cu d co rn rn n`_ a�i a I Z � V [VJill uj C) L V N W LU m L m J cu } o >- 0 >- • cn Q) • • m +Y ; LL Z • U • • U • O Q • LL Q • • Q V • • UCL • N U • CL QL x (L • LLB c c c = 3 � U U LL U • • • �Q Q • . Q § 5 § \ 7 ~ ƒ \ V f f ) k \ } } )LL $ ) { § Ln � ) r / ) \ d $ f \ ] \ � � \ § \ ) } � \ ku } \ \ s � _ f § B § j 7a r n � k e k § - ] \ � [ ) ) . ' ° 41 } . G \ ƒ : \