Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ordinance 6725
ORDINANCE NO o AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND PROVIDING FOR THE IMPROVEMENT OF A PORTION OF BRENTWOOD STAIR ROAD AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; LETTING CON- TRACT TO GLADE, INC. AND FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVEMENTS AND AUTHORIZING ITS EXECU- TION; MAKING APPROPRIATION$ FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVYING OF ASSESSMENTS AGAINST ABUTTING PROPERTIES AND THE OWNIMRS THEREOF FOR A PART OF THE COST OF SUCH IMPROVEMENTS AND THE ISSUANCE OF ASSIGNABLE CERTIFICATES IN EVIDENCE OF SUCH ASSESSMENTS; DIRECTING THE PUBLIC WORKS DIRECTOR OF THE CITY TO PRE- PARE ESTIMATES; DIRECTING THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLAR- ING THAT THIS ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMENT ARE AND SHALL BE PURSUANT TO THE ACT OF THE FIRST CALLED SESSION OF THE FORTIETH LEGISLATURE OF THE STATE OF TEXAS, CHAPTER 106; COMMONLY KNOWN AS ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES AS AMENDED BY ACTS 1967, 60TH LEGISLATURE, PAGE 365, CHAPTER 176, SECTION 1, EMERGENCY EFFECTIVE MAY 12, 1967; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND EN- ROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Public Works Director for the City of Fort Worth, Texas, has prepared Plans and Specifications for the improvements of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, and same having been examined by the City Council of the City of Fort Worth, Texas, and found to be in all matters and things proper, NOW THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: 1 . The hereinafter, described Plans and Specifications are hereby approved and adopted. II There exists a public necessity for the improvement of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, to-wit: UNIT 1: BRENTWOOD STAIR ROAD From Handley Drive to 1200' east, known and designated as Project No. 104-24000-230, Unit 1. UNIT 2: GARY LANE From 100' east of Shelman Trail to 120' west of Mims Street, known and designated as Project No. 104-24000- 230, Unit 2. UNIT 3: TERBET LANE From Ederville Road to 400' south of Isham Road, known and designated as Project No. 104-24000-230, Unit 3. UNIT 4: EDERVILLE ROAD From Terbet Lane to 144' east of Warren Lane, known and designated as Project No. 104-24000-230, Unit 4. IIIo Each of the above described portions of streets, avenues and public places in the City of Fort Worth, Texas, shall be improved by raising, grading, and filling same and by constructing thereon the following, to-wit- UNIT 1: BRENTWOOD STAIR ROAD From Handley Drive to 1200' east, known and designated as Project No, 104-24000-230, Unit 1: a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a sixty foot roadway. UNIT 2: GARY LANE From 100' east of Shelman Trail to 120' west of Mims Street, known and designated as Project No. 104-24000- 230, Unit 2: a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty foot roadway. UNIT 3: TERBET LANE From Ederville Road to 400' south of Isham Road, known and designated as Project No. 104-24000-230, Unit 3: a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. UNIT 4: EDERVILLE ROAD From Terbet Lane to 144' east of Warren Lane, known and designated as Project No. 104-24000-230, Unit 4:" a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized sub- grade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty-eight foot roadway. The above, together with concrete curbs, gutters, driveways and incidentals to such improvements, on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said improvements to be constructed as and where shown on the Plans and Specifications therefor. IV. The cost of said improvements as herein defined shall be paid for as follows, to-wit: A. The property abutting on that portion of the street, avenue or public place and the real and true owners thereof shall pay all of the cost of curbs and gutters in front of their property and not exceeding nine-tenths (9/10ths) of the estimated cost of the remainder of such improvements. B. The City of Fort Worth shall pay all of the remainder of the cost of said improvements after deducting the amounts herein specified to be paid by the abutting properties and the real and true owners thereof as set out in subsection A. The amounts payable by the abutting properties and the real and true owners thereof shall be assessed against such properties and the real and true owners there- of and shall constitute a first and prior lien upon such properties and a personal liability of the real and true owners there of and shall be payable to-wit: When the improvements- are completed and accepted by the City on a particular unit, the sums assessed against property abutting upon such completed and accepted units shall be and become payable in five (5) equal installments, due respectively on or before thirty (30) days, and one (1) , two (2) , three (3), and four (4) years from the date of such completion and acceptance and the assessments against the pro- perty abutting upon the remaining units shall be and become due and payable in such installments after the date of completion and acceptance of such respective unit. The entire amount assessed against the particular parcels of property shall bear interest from the date of such completion and acceptance of the improvements on the unit upon which the particular property abuts at the rate of six (6%) percent per annum, payable annually except as to interest on the first installment, which shall be due and payable on the date said installment matures provided that any owner shall have the right to pay any and all of such installment at any time before maturity by paying principal with interest accrued to the date of payment and further provided if default be made in the payment of any installment promptly as the same matures, then at the option of the City of Fort .Worth or its assigns, the entire amount of the assessment upon which such default is made shall be and become immedi- ately due and payable; but it is specifically provided that no assessments shall in any case be made against any property or any owner thereof in excess of the special benefits to property in the enhanced value thereof by means of said improvements in the unit upon which the particular property abuts, as ascertained at the hearing pro- vided by the law in force in the City, nor shall any assessment be made in any case until after notice of hearing as provided by law. Said assessments against the respective lots and parcels of property and owners thereof shall be evidenced by certificates of a special assessment which shall be executed in the name of the City of Fort Worth, PROVIDED, however, that acting through its duly authorised Director of Public Works, the City of Fort Worth retaining the right to authorized payment of the sums assessed against abutting property upon such completed and accepted unit in not more than forty-eight equal regular monthly installments of not less than $9.00 each, the first of such installments to become due and payable not more than 30 days after the completion and acceptance by the City of the particular unit, PROVIDED FURTHER, that the City Attorney is hereby empowered to authorize payments of said sums in lesser installments and/or over a longer period of time in cases in which the Director of Public Works has previously determined that an extreme financial hardship upon the property owner will otherwise result and PROVIDED FURTHER, that such method of payment shall be authorized only in instances where the owner or owners of property abutting upon such completed and accepted unit shall have executed and delivered to the City of Fort Worth a lawful, valid and binding note and mechanic's and materialman's contract upon forms supplied by the City granting a mechanic's lien upon and conveying the said abutting property in trust to secure the payment by said owner or owners according to the terms thereof of the sums assessed against such property. V. The assessments against the respective lots and parcels of property and the owners thereof shall be evidenced by certificates of special assessment, which shall be executed in the name of the City by the Mayor of said City and the City Secretary shall attest the same and impress the corporate seal of the City thereon, and which may have attached thereto coupons in evidence of the several installments, or in evidence of any of the installments in which the assessment is payable, which certificates shall be issued to the City of Fort Worth, shall recite the terms and time of payment, the amount of the assessment, the description of the property, and the name of the owners, as far as known, and shall contain such other recitals as may be pertinent thereto, and shall further recite substantially that all pro- ceedings with reference to the making of such improvements have been regularly had in compliance with law, and that all prerequisites to the fixing of the assessment lien against the property described in said certificates and the personal liability of the owners thereof, have been regularly had, done and performed, and such re- citals shall be prima facia evidence of the matters so recited, and no further proof shall be required in any court, and the said certificates shall provide substantially that if default be made in the payment of any installment promptly as the same matures, then, at the option of the City of Fort Worth, or its assigns, the entire amount of the assessment shall be and become immediately due and payable, together with reasonable attorney's fees and costs of collection, if incurred, all of which, as well as the principal and interest on the assessment, shall be a first and prior lien against the property, superior to all other dens and claims except State, County, School District, and City ad valorem taxes . No error or mistake in naming any owner or in describing any property or in any other matter or thing, shall invalidate any assessment or any certificate issued in evidence thereof, and the omission of improvements on any particular unit or in front of any property exempt by law from the lien of special assessment for street improvements shall not in- validate any assessment levied. The certificates referred to need not contain recitals in exactly the works above provided for, but the substance thereof shall suffice, and they may contain other and additional recitals pertinent thereto. VI. Bids having peen advertised for as required by Article 1105b of the re- vised Civil Statutes of Texas, as amended, and the bid of GLADE, INC. having been found to be the lowest and best bid for the making and construction of said improvements, the contract there- fore is hereby awarded to GLADE,_ INC. , at and for the prices stated in the Proposal of said company and as reported and recommended by the Public Works Department, which said report and recommendation is on file with the City, the City Manager, and the City Secretary are hereby directed to execute the said contract in the name of the City of Fort Worth, Texas, and to impress the corporate seal of the City thereon, the said contract embracing, among other things, the prices for the work. VII. To provide for the payment of the indebtedness incurred by the City of Fort Worth, Texas, by said contract, there is hereby appropriated out of available funds and current revenues of the City, an amount sufficient to pay said indebtedness so incurred. VIII. The improvements provided for herein shall be made and constructed, notice given, hearing held and assessment levied and all proceedings taken and had in accordance with and under the terms of the powers and provisions of Chapter 106 of the Acts of the First Called Session of the Fortieth Legislature of the State of Texas, now known as Article 1105b of Vernon's Texas Civil Statutes, as amended, which law has been adopted as an amendment to and made a part of the Charter of the City of Fort Worth, Texas, and under which law these proceedings are taken and had. IX. Each unit above described shall be and constitute a separate and independent unit of improvement and the assessments herein provided for shall be made for the improvements in each unit according to the cost of the improvements in that unit and according to the benefits arising from the improvements in that unit. X. In making assessments, if the name of the owner be unknown, it shall be sufficient to so state the fact, and if any property be owned by an estate or by any firm or corporation, it shall be sufficient to so state, and it shall not be necessary to give the correct name of the owner, but the real and true owners of the property mentioned shall be liable and the assessments against the property shall be valid. XI. The Director of Public Works of the City of Fort Worth, Texas, be and he is hereby ordered and directed to file with the City Council, estimates of the cost of such improvements in each unit, in accordance with the terms of the powers and provisions of the Charter of the City of Fort Worth, Texas. XII. The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice in accordance with the provisions of the Act passed at the Fifth Called Session of the Forty-first Legislature of the State of Texas, and shown as Chapter 21 of the Acts of said Session of the Legislature, said Act having been passed in the year 1930, and now known as Article 1220a of Vernon's Texas Civil Statutes. XIII. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. XIV. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS- DAY OF 19 i Z APPROVED AS TO FORM AND LEGALITY: .500 6�- ro& City Attorney LINE City of Fort Worth, Texas Doses Mayor and Council Communication DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE �L NUMBER Paving at 4 Locations in North Meadow- 2 9/25/72 C-2351 brook Estates, Sixth and Seventh Filing lof Council action is requested on Project No. 104-24000-230, as described below. Project Description Roadway Width R.O.W.Widt Unit Street Limits Feet Feet 1 Brentwood Stair Handley Drive to 1200' East 60 80 2 Gary Lane 100' East of Shelman 40 50 to 120' West of Mims 3 Terbet Lane Ederville Road to 30. 50 400' South of Isham 4 Ederville Road Terbet Lane to 144' East . 48 65 of Warren Lane This project will provide improved traffic facilities between Handley Drive and Sandy Lane. Improvements The improvements are City initiated in conjunction with Developers' Contract No. 7196. Units 1 and 4 will be improved by the constructi©n of-seven-inch thick hot-mi4 asphaltic concrete pavement, seven-inch high concrete curb and eighteen-inch wide concrete gutter, on a.six-inch lime s_tahilized subgrade, along with .the necessary .storm sewer appurtenances. Units. 2. an4 3 will be improved with six-inch thick hot-mix asphaltic concrete pavement, seven-inch high concrete .curb and eighteen-inch wide .concrete gutter, on a six-inch lime stabilized subgrade, along with the necessary storm sewer.appurtenances. Submission of Bids The. following bids have been received: Bidder Amount Glade, Inc. $146,454.78 S.R.O. Asphalt, Inc. 147,135.78 Southwestern Contracting Company 149,159.75 Texas Bitullthic Company 151,762.60 Austin Road Company 153,27MO L. Grimes and Company, Inc. 155,675.40 DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER Paving at 4 Locations in North Meadow- 2 2 9/25/72 C-2351 brook Estates, Sixth and Seventh Filing °i The following contractors took plans, but submitted no bids: Walt Williams Construction Company Ellis County Asphalt Company, Inc. R. W. Gibbins, Inc. Navarro Construction Company Bids Received: September 7, 1972 Working Days Allotted: 80 Project Cost and Financing Based on the. low bid, $43,655.58 will be assessed against abutting property owners, to be provided for by a bond fund transfer from Revolving Fund Unspeci- fied. Total construction, inspection engineering salaries, and miscellaneous costs to the City will be approximately $117,444.67. Sufficient funds, in the amount of $117,445.00, are available in Account No. 104-24000-230 to finance the City's cost of construction, inspection engineering and miscellaneous expenses. Recommendations It is .recommended that: 1) The following Bond Fund Transfer be approved: Amount From To Reason $43,655.58 Unspecified 4 Locations in North Meadow- To provide funds Revolving Fund brook Estates, 6th and 7th for property owners' 042-09724-901 Filing share in construc- Revolving Fund 042-10424-230 tion cost. 2) An ordinance be adopted: a) Declaring the necessity for and ordering the improvements; b) Making provisions for levying assessments; c) Directing the Public Works Department to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Glade, Inc. , in the amount of $146,454.78; e) Making appropriations to cover the indebtedness thereby incurred for improvements of the project named above. 3) An ordinance be adopted: a) Approving the estimates of costs and amounts proposed to be assessed; and, b) Setting October 23, 1972, as the date for the Benefit Hearing. RNL:ms Attachments SUBMITTED BY: DISPOSITIO COUNCIL: PROCESSED BY APPROVED ❑ OTHER (DESCRIBE) _ Changed date of benefit hearing_to w_43"7 C SECRETARY Adopted Ordinance No. DATE P Declaring IJeces CITY MANAGER �-.p hear�� PROJECT NO . 104 - 2 4000 - 230 y ` mlpo' ,7 6 I 638.5 17 � I 643.0 UNIT 3 N PH LA. 35.5 I 6.0 UNI 1Ul� 62'3- SR WTWO IR RO, a, , 816.0� Z FRANWOOD T RR. / I ' -- - �_ UNIT 2 — - — - A 642.5 I 4 LOCATIONS in MEADOWBROOK ESTATES CITY OF PORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION ASSESSMENT PAVING AT 4 LOCATIONS IN MEADOWRROOK ESTATES PROJECT NO, 104-24000-230 A Neighborhood Meeting was conducted by the Engineering Division of the Public Works Department at the Atwood McDonald Elementary School on September 18, 1972, for the Assessment Paving at 4 Locations in Meadowbrook Estates, Procedures concerning proposed improvements, owner participation in costs and methods of payment were explained by Mr, Odell Schmidt to the four people in attendance. The property► owners attending this meeting were Mr, C. C. Gumm, Mr, Milton Schorn, Mr, N. C. Rios and Mr, Tom Crocker, who represents Mr. Rios. After Mr. Schmidt°s explanation there was a short general discussion and the meeting adjourned, FORT WORTH, TEXAS SEPTEMBER 25, 19 d,' TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, Gentlemen and Mrs. Rimmer: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of BRENTWOOD STAIR ROAD and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place 'are as follows, to-wit: PROJECT N0, 104-24000-230, UNIT la BRENTWOOD STAIR ROAD FROM HANDLEY DRIVE TO 12001 EAST, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be sixty feet wide. The following assessment rates have been established: Seven-inch hot-mix asphaltic concrete pavement (Commercial Zoning) o o , $8e95/L,F. (Residential Zoning) o a 4,11/L.F. Seven-inch curb and eighteen-inch gutter , , , p o , 2,39/L,F, The assessments result in the following division of cost: Total Cost to Property Owners (Unit 1) , , , , , o $20,362.69 Total Cost to City of Fort Worth (Unit 1) , , , , 28,469.43 Total Estimated Construction Cost (Unit 1) , $48,832,12 PROJECT NO, 104-24000-230, UNIT 2: GARY LANE FROM 100' EAST OF SHELMAN TRAIL TO 120' WEST OF MIMS STREETP to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be forty feet wide. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) 0 0 0 0 0 0 0 0 , 0 0 0 0 0 $4,11/L jF Seven-inch curb and eighteen-inch gutter , 0 0 0 0 0 0 0 0 2o39/L Jo The assessments result in the following division of cost: Total Cost to Property Owners (,Unit 2) 0 0 0 0 0 $ 4,304.44 Total Cost to 0ity of Fort Worth (Unit 2) 0 0 0 0 45,705012 Total Estimated Construction Cost (unit 2) 0 0 $50,009.56 PROTECT N0, 104-24000-230, UNIT 3: TEREET LANE FROM EDERVILLE ROAD TO 400' SOUTH OF ISHAM ROAD, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement (Residential Zoning) 0 o 0 0 0 $4e11/L,FO Seven-inch curb and eighteen-inch gutter c c u c c c c c c 2,39/L0F0 The assessments result in the following division of cost: Total Cost to Property Owners (Unit 3) 0 0 0 0 0 $14,438.45 Total Cost to City of Fort Worth (Unit 3) 0 0 , 12,311.90 Total Estimated Construction Cost (Unit 3) 0 0 0 $26,750.35 PROJECT NO, 104-24000-230. UNIT 4: EDERVILLE ROAD FROM TEREET LANE TO 144° EAST OF WARREN LANE, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six-much thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be forty-eight feet wide, The following assessment rates have been established: Seven-inch hot-mix asphaltic concrete pavement (Residential Zoning) , , , , , , $4,11/L,F, Seven-inch curb and eighteen-inch gutter , , , , , , , o 2,39/L,F, The assessments result in the following division of cost: Total Cost to Property Owners (Unit 4) , , , „ , $ 4,550.00 Total Cost to City of Fort Worth (Unit 4) , , , , 30,958.22 Total Estimated Construction Cost (Unit 4) , , , , $35,508.22 TOTAL COST TO PROPERTY OWNERS (ALL UNITS) , , , , $ 43,655.58 TOTAL COST TO CITY OF FORT WORTH (ALL UNITS) , , , 1179,444.67 TOTAL ESTIMATED CONSTRUCTION COST (ALL UNITS) , , , $161,100.25 );I btw� ?JAATYK dui, GRAHAM, P,E, ENGINEER PROJECT N0, 104-24000-230, UNIT 1. BRENTWOOD STAID ROAD FROM HANDLEY DRIVE TO 12000 EAST, to be improved by constructing seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subg;rade with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be sixty feet wide. BLOCK OWNER LOT ZONING° FRONTAGE. RATE AMOK ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF HANDLEY DRIVE AND BRENTWOOD STAIR ROAD NORTH SIDE OF STREET EDERVILLE ADDITION Co Co Gumm 2 61 120' Pavement $8.95 $1,074.00 P.O, Box 670 Comm, 1201 Curb & Gutter 2.39 286.80 76101 $1,360.80 C. Co Gumm 1 61 122' Pavement $8.95 $1,091e90 P,Oo Box 670 Comm, 1226 Curb & Gutter 2.39 291.58 76101 $1,383.48 Co Co Gumm 2 60 1301 Pavement $8,95 $1,163e50 P.O. Box 670 Comm, 130' Curb & Gutter 2,39 310.70 76101 $1,476 0?0 C. C. Gumm 1 60 138' Pavement $8.95 $1,235JO P.O, Box 670 Comme 138' Curb & Gutter L 39 329.82 76101 $1,564e92 Co Co Gumm 2 59 138' Pavement $8.95 $1,235,10 P.O, Box 670 Comoro 1389 Curb & Gutter 2.39 329.82 76101 $1,564e92 1 PROJECT NO. 104-24000-230. UNIT 1, BREMIVOOD STAIR ROAD FROM HANDLEY DRIVE TO 1200' EAST, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET EDERVILLE ADDITION C. C. Gumm 1 59 148' Pavement $8.95 $1,324.60 P.O. Box 670 Comm. 148' Curb & Gutter 2.39 353.72 76101 $1,678.32 C. C. Gumm 2 58 140' Pavement $8.95 $1,253.00 P.O. Box 670 Comm. 140' Curb & Gutter 2.39 334.60 76101 $1,587.60 C. C. Gumm 1 58 100' Pavement $8.95 $ 895.00 P.O. Box 670 Comm. 100' Curb & Gutter 2.39 239.00 76101 $1,134.00 C. C. Gumm 2 57 180' Adjusted to P.O. Box 670 R.es, 145' Pavement $4.11 $ 595.95 76101 145' Curb & Gutter 2.39 346.55 $ 942.50 SOUTH SIDE OF STREET NORTH MEADOWBROOK ESTATES 7TH FILING North American 40 & 245' Adjusted to Engineering 41 Res. 210' Pavement, $4.11 $ 863.10 731 109th Street 210' Curb & Gutter 2.39 501.90 Arlington, Texas $1 365.00 76011 e 2 PROJECT NO, 104-24000-230, UNIT 1, BRENTWOOD STAIR ROAD FROM HANDLEY DRIVE TO 12001 EAST, CONTIM07ED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET NORTH MEADONEROOR ESTATES 7TH FILING North American Engr. 39 70' Pavement $4.11 $ 287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 N. American Engineering 38 701 Pavement $4.11 $ 287.70 731 109th Street Res. 701 Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 37 70' Pavement $4,11 $ 287.70 731 109th Street Res, 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 36 700 Pavement $4.11 $ 287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr, 35 70' Pavement $4.11 $287.70 731 109th Street Res. 700 Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 34 70' Pavement $4.11 $ 287.70 731 109th Street Res. 700 Curb & Gutter 2.39 167,30 Arlington, Texas $ 455.00 76011 3 PROJECT NO. 104-24000-230, UNIT 1, BRENTWOOD STAIR ROAD FROM HANDLEY DRIVE TO 12001 EAST CONTINUED OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH. SIDE OF STREET NORTH MEADOWBROOK ESTATES 7TH FILING North American Engr. 33 701 Pavement $4.11 $ 287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 R. COLLINS SURVEY Elbert D. Helm Tract 2-D 152.3° Pavement $4.11 $ 625.95 409 Lanola Court Res. 152.3° Curb & Gtr. 2.39 364.00 76103 $ 989.95 ERNEST REEDER ADDITION B. E. Freeman 3 1 831 Pavement $4.11 $ 341.13 Box 5838, Route 4 Res. 83' Curb & Gutter 2.39 198.37 76112 $ 539.50 Richard Hyde 2 1 701 Pavement $4.11 $ 287.70 P.O. Box 8035 Res. 70' Curb & Gutter 2.39 167.30 76112 $ 455.00 Richard Hyde 1 1 175' Pavement $4.11 $ 719.25 P.O. Box 8035 Res. 175' Curb & Gutter 2.39 418.25 76112 $1,137.50 4 PROJECT NO, 104-24000-230, DNIT I, BRENTWOOD STAIR ROAD FROM HANDLEY DRIVE TO 1200' EAST, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET ERNEST REEDER ADDITION TOTAL COST TO PROPERTY OWNERS, UNIT 1 . . . . . . $20,362.69 TOTAL COST TO CITY OF FORT WORTH, UNIT 1 . . . 25,469.43 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 1 . . . . $48,532.12 5 PROJECT NO. 104-24000-230, UNIT 2. GARY LANE FROM 100' EAST OF SHELMAN TRAIL TO 120' WEST OF M'206 STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on sixminch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be forty feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT A LINE 100' EAST OF SHELMAN TRAIL NORTH SIDE OF STREET NORTH MEADOWBROOK ESTATES 7TH FILING North American Engr. 49 6 69.05' Pavement $4.11 $283.80 731 109th Street Res. 69.05' Curb & Gtr. 2.39 165.03 Arlington, Texas $ 448.83 76011 North American Engr. 48 6 75' Pavement $4.11 $308.25 731 109th Street Res. 75' Curb & Gtr. 2.39 179.25 Arlington, Texas $ 487.50 76011 DOWNEY DRIVE INTERSECTS North American Engr. 10 9 52.8° Pavement $4.11 $217.01 731 109th Street Res. 52.81 Curb & Gtr. 2.39 126.19 76011 $ 343.2.0 Ncrt.h American Engr. 9 9 75' Pavement $4.11 $308.25 731 109th Street Res. 750 Curb & Gutter 2.39 179.25 Arlington, Texas $ 487.50 76011 North American Engr. 8 9 63.04' Pavement $4.11 $259.09 731 109th Street Res. 63.041 Curb & Gtr. 2.39 150.67 Arlington, Texas $ 409.76 76011 6 PROJECT NO, 104-24000-230, UNIT 2, GARY LANE FROM 100' EAST OF SHELMAN TRAIL TO 120' WEST OF MIMS STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET R. COLLINS SURVEY Fort Worth Ind. Tract 5 427,33' Side Lot Adjusted to School District Res. 327.33' Pavement $4011 $1,345033 3210 W. Lancaster 327,33' Curb $ Gtro 2,39 782�32 76107 $2,127.65 TOTAL COST TO PROPERTY OWNERS, UNIT 2 o $ 4,304,44 TOTAL COST TO CITY OF FORT WORTH, UNIT 2 a 45,705, 12 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 2 o o $50,009056 7 PROJECT NO. 104-24000-230, UNIT 3, TERBET LANE FROM EDERVILLE ROAD TO 4001 SOUTH OF ISHAM ROADD to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT° ASSESSMENT BEGINNING AT A LINE 4001 SOUTH OF ISHAM ROAD WEST SIDE OF STREET R. COLLINS SURVEY Robert Jack Armstrong Tract 4Hm1 140' Pavement $4.11 $575.40 2613 Sandy Lane Res. 1401 Curb & Gutter 2.39 334.60 76112 $ 910.00 Robert Jack Armstrong Tract 4H 143' Pavement $4.11 $587.73 2613 Sandy Lane Res. 143' Curb & Gutter 2.39 341.77 76112 $ 929.50 N. C. Rios Tract 4K 203' Pavement $4.11 $834.33 413 W. Vickery Res. 2039 Curb & Gutter 2.39 485.17 76104 $1,319.50 N. C. Rios Tract 41 178' Pavement $4.11 $731.58 413 W. Vickery Res. 178' Curb & Gutter 2.39 425.42 76104 $1,157.00 Milton Schorn S. 230' of 230' Pavement $4.11 $945,30 1708 Montclair Tract 4A 230' Curb & Gutter 2.39 549.70 76103 Res. $1,495.00 8 PROJECT NO. 104m24000-230, UNIT 3. TERBET LANE FROM EDERVILLE ROAD TO 4001 SOUTH OF ISHAM ROAD, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET R. COLLINS SURVEY Milton Schorr N. 250' of 250' Pavement $4.11 $1,027.50 1708 Montclair Tract 4A 250Q Curb & Gutter 2.39 597.50 76103 $1,625.00 EAST SIDE OF STREET NORTH MEADOWBROOK ESTATES SIXTH FILING North American Engr. 1 18 87.3° Pavement $4.11 $358.80 731 109th Street Res. 87.3' Curb & Gtr. 2.39 208.65 Arlington, Texas $ 567.45 76011 North American Engr. 2 18 701 Pavement $4.11 $287.70 731 109th Street Res. 700 Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 3 18 70' Pavement $4.11 $287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 4 18 70' Pavement $4.11 $287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 5 18 70' Pavement $4.11 $287.70 731 109th Street Res. 70' Curb & Gtr. 2.39 167.30 Arlington, Texas $ 455.00 76011 9 PROJECT NO, 104-24000-230, UNIT 3, TERBET LAME FROM EDERVILLE ROAD TO 4000 SOUTH OF ISHAM ROAZ� CO%1TIED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT" ASSESSMENT EAST SIDE OF STREET NORTH MEADOWBROOK ESTATES SIXTH FILING North American Engr. 6 18 70' Pavement $4.11 $287.70 731 109th Street Res. 709 Curb & Gutter 2.39 167.30 Arlington, .Texas $ 455.00 76011 North American Engr. 7 18 70' Pavement $4.11 $287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 8 18 70' Pavement $4.11 $287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 9 18 74° Pavement $4.11 $287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 '76011 ISHAM ROAD INTERSECTS North American Engr. 28 12 80' Pavement $4.11 $328.80 731 109th Street Res. 80° Curb & Gutter 2.39 191.20 Arlington, Texas $ 520.00 76011 North American Engr, 27 12 70' Pavement $4.11 $287.70 731 109th Street Res. 701 Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 10 PROJECT NO,o 104-24000-230, UNIT 3. TEREET LANE FROM EDERVILLE ROAD TO 400' SOUTH OF ISHAM ROAD CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSNENT EAST SIDE OF STREET NORTH MEAD'OWBROOK ESTATES SIXTH FILING North American Engr. 26 12 70' Pavement $4.11 $287.70 731 109th Street Res, 700 Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 25 12 701 Pavement $4.11 $287.70 731 109th Street Res. 700 Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 North American Engr. 24 12 70' Pavement $4.11 $287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.50 Arlington, Texas $ 455.00 76011 North American Engr. 23 12 70' Pavement $4.11 $287.70 731 109th Street Res. 70' Curb & Gutter 2.39 167.30 Arlington, Texas $ 455.00 76011 TOTAL COST TO PROPERTY OWNERS, UNIT 3 . . . $14,438.45 TOTAL COST TO CITY OF FORT WORTH, UNIT 3 . . 12,311.90 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 3 . . ZL250.35 11 PROJECT NO. 104-24000-230, ,UNIT 4, EDERVILLE ROAD FROM TERBET LANE TO 144' EAST OF WARREN LANE, to be improved by constructing seven-inch thick hot-mix asphaltic concrete pavement on six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be forty-eight feet wide, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF EDERVILLE ROAD AND TERBET LANE NORTH SIDE OF STREET Texas Turnpike Authority No Benefit No Assessment SOUTH SIDE OF STREET NORTH MEADOWBROOK ESTATES SIXTH FILING North American Engr. 1 15 144' Side Lot Adjusted to 731 109 th Street Res, 100' Pavement $4. 11 $411 .00 Arlington, Texas 100' Curb $ Gutter 2,39 239,00 76011 $650.00 WARREN LANE INTERSECTS North American Engr. 18 16 114' Side Lot Adjusted to 731 109th Street Res, 100' Pavement $4. 11 $411 .00 Arlington, Texas 100' Curb & Gutter 2,39 23M 0 76011 $650.00 North American Engr. 1 16 119' Side Lot Adjusted to 731 109th Street Res. 100' Pavement $4. 11 $411.00 Arlington, Texas 100' Curb $ Gutter 2,39 239.00 76011 $650.00 BARRON LANE INTERSECTS North American Engr, 18 17 115' Side Lot Adjusted to 731 109th Street Res. 100' Pavement $4.11 $411.00 Arlington, Texas 100' Curb $ Gutter 2.39 239.00 76011 $650.00 12 PROJECT NO. 104-24000-230, UNIT 4, EDERVILLE ROAD FROM TERBET LANE TO 144' EAST OF WARREN LANE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET NORTH MEADOWBROOK ESTATES SIXTH FILING North American Engr, 1 17 120' Side Lot Adjusted to 731 109th Street Res. 100' Pavement $4o11 $411a00 Arlington, Texas 100' Curb $ Gutter 2.39 239.00 76011 $650000 MIMS STREET INTERSECTS North American Engr. 18 18 120' Side Lot Adjusted to 731 109th Street Res, 100' Pavement $4�11 $411.00 Arlington, Texas 100' Curb $ Gutter 2039 23 M0 76011 $650e00 North American Engr. 1 18 122.57' Side Lot Adjusted to 731 109th Street Res, 100' Pavement $4, 11 $411�00 Arlington, Texas 100' Curb $ Gutter 2.39 23M0 76011 $650.00 TOTAL COST TO PROPERTY OWNERS, UNIT 4 a o $ 4,550000 TOTAL COST TO CITY OF FORT WORTH, UNIT 4 0 30,958�22 TOTAL ESTIMATED CONSTRUCTION COST, UNIT 4 o e $35,5W 22 TOTAL COST TO PROPERTY OWNERS (ALL UNITS) $ 43,655.58 TOTAL COST TO CITY OF PORT WORTH (ALL UNITS) 117,444.67 TOTAL ESTIMATED CONSTRUCTION COST (ALL UNITS) $161,100.25 13