Project Name Timberland Boulevard Phase 3-Park Vista to US 377
Description
Contrac.torF McMahon.Contracting.L.P. City inspector Mark McFadin
Funding 34014 30104 39008 Contract Time
Allocation Account Totals CD
Odgliai Contract Amount $2,925,291.77 $619,973.00 $600,000.00 $4,045,264.77
Extras to Date $0.00 $0.00
Credits to Date $0.00 $0.00
Current Contract Amount $2,925,291.77 $519,973.00 $600,000.00 $4,045,264.77
Arrwunt of Proposed Allocation $74 447.10 $0.00 $0.00 $7 447.10
Original Allowance Available forFAllocako $300,000.00 $3 ,000.00
Allowance Funds Previously Allocated $88,529.44 $88,529.44
Remaining Funds Available for this Allocation $211.470.56 1 $211,470.56
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL;Furnish all labor and material as
per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request This construction
allowance request is to add new pay Items 47E,47F,47G,47H,193C and increase existing pay Item 60.Items 47E,47F and 47G are added
to provide a positive barrier between the travel lanes and a retaining wall drop-off-these items were not shown in the plans or included as pay
items.Pavement in TxDOT Right of Way was designed for 100 Concrete;however,upon excavation,the existing concrete pavement thickness
was found to be 12".TxDOT requested that the proposed concrete pavement thickness match the existing thickness;therefore,Item 47H is
being added to cover additional reinforcement steel,labor and concrete.Item 60 Is for additional concrete needed to construct a headwall that
was shown on the plans but the quantity was incorrect.Item 193C is needed for pavement striping that was shown on the plans but not
included as a pay item-Item 193C has been approved by and will be paid by the City of Keller.
BY: BY: j
CONTRACTOR CITY OF FORT WORTH j
MC/MAHON CONT NG, L.P.
James Proulx Mark McFadin
Project Manager Inspector
Date: /2 1.0119 Date:
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment In full for all costs arising out of,or incidental to,the above Construction Allowance Request Contract Time will be adjusted on the
basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary.
L
AL REC RL)SECRETAOR-TH'�a 1
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
JTAuldridge
Name of Employee/Signature
Sr. Project Manager
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
O r....
ATTEST:
Mary J.Kayser, City Secretary *'
FMCIAL RECORD
CITY SECRETARY
FT. WORTH,TX
FORT WORTH., City of Fort Worth
Construction Allowance Request Breakdown
Construction FOA# 0 Date 1 211 8/20 1 9 City Sec# 52367
Client Project#(s) CO2288
FAC#(s)1 34014-0 200431-574001 O-CO2288-201 5-14010199
Project Name Timberland Boulevard Phase 3-Park Vista to US 377
Description
Contractorl McMahon Contracting L.P. City Inspector Mark McFadin
ADDITIONS
DeptIFAC City UnitUnit Cost o a
Wood os
Downstream AnchorTerminal Sections
MSKT Steel Post
7Additional Concrete for Concrete Pavement JxDOT 3.
Special Storm Drain Headwall,Combination Box&Pipe u vert
mt Marking
34014 74,447.10
30104 0.00
39008 $0.00
Sub Totali ons 7 ,
Change Order Additions Page 2 of 4
FORT WORTH. City of Fort Worth
Construction Allowance Request Breakdown
Construction FOA# 3 Date 12/18/2019 City Sec# 52367
Client Project#(s) CO2288
FAC#(s) 34014-0200431-574001 O-CO2288-2015-140101 99
Project Name Timberland Boulevard Phase 3-Park Vista to US 377
Description
Contractorl McMahon Contracting L.P. City Inspector Mark McFadin
CONSTRUCTION ALLOWANCE ITEMS TO 8E REUUCEU
ITEM DESCRIPTION epUnit Unit Cost o
34014 0.00
30104
39008
Sub TotalDeletions
Change Order Deletions Page 3 of 4
MWWBE Breakdown for this Construction Allowance Request
MWBE Sub Type of Service Amount for this FOA
Total $0.00
Previous Construction Allowance Requests
CO# DATE AMOUNT
Total $0.00
4/20/2020 BIM 360 Document Management
PA AUTODESK' BIM 360- fortworthgov > CO2288-Timberland Blvd and Park Vista Blvd - A TT
Document
FOLDERS REVIEWS TRANSMITTALS ISSUES
Management --
Reviews > Review detail
CLOSED #34 Construction Allowance Request No.3
Export Report This review is closed.
Name Desci PROGRESS
Construction Allowance Request No.3 CO228... --
" Initiator Initial Review n
c3 Construction Allowance Request No.3 CO228... -- JA IT Auldridge Dec 23,8:26 AM
<jt.auld ridge @fortworthtexas.gov>
Guard rail.pdf --
Submitted to Reviewer 1
Construction Allowance Request#3
Mt.Gilead pavement markings.pdf -- - Emails are attached to explain
and show the need for the
TxDOT Concrete Thickness.pdf additional work.Wet signatures
have been added along with one
additional pay item.
Reviewer 1 Initial Review 1
Jennifer Roberts Dec 23, 1:30 PM
<jennifer.roberts@fortworthtexas.gov=
Submitted to Reviewer 2
Construction Allowance#3 has
been reviewed and approved by
the Program Manager. CA#3 was
submitted previously; but was
lacking wet signatures for the
Contractor and Inspector.This new
workflow for CA#3 includes wet
signatures.
FFMAL RECORD
, rrlr,# 1,;FCR—ETARY
Reviewer 2 Initial Review 2 n
�o Tie
https://docs.b360.autodesk.com/projects/f8905164-5cee-48b1-a8c4-c92197lb47la/reviews/752d2e88-bd9c-490c-ab87-dOb5b26ef30d III ""�
4/20/2020 BIM 360 Document Management
B AUTODESK' BIM 360' fortworthgov > CO2288-Timberland Blvd and Park Vista Blvd - A TT
.,. Document
••' FOLDERS REVIEWS TRANSMITTALS ISSUES
Management
Reviews > Review detail
CLOSED #34 Construction Allowance Request No. 3
Export Report This review is closed.
Name Desci PROGRESS
Construction Allowance Request No.3 CO228... --
LP Lauren Prieur ]an 3,9:31 AM
13 Construction Allowance Request No.3 CO228... -- <tau ren.prieur@fortworthtexas.gov>
Submitted to Reviewer 3
Guard rail.pdf __ No comments,good
documentation provided.
Mt. Gilead pavement markings.pdf --
�"� Reviewer 3 Initial Review 3 n
TxDOT Concrete Thickness.pdf '- WJ William Johnson ]an 6, 1:18 PM
<william.johnson@fortworthtexas.gov:
Submitted to Reviewer
Reviewer4 Initial Review4
DB Douglas Black ]an 6,2:22 PM
<doug.black@fortworthtexas.gov>
Submitted to Approver
Approved.
Approver Final Review n
DB Dana Burghdoff ]an 6, 3:46 PM
j' i
<dana.burghdoff@fartwo—rthtexas._-v= R®
,'w
https://docs.b360.autodesk.com/projects/f8905164-5cee-48bl-a8c4-c921971 b471 a/reviews/752d2e88-bd9c-490c-ab87-dOb5b26ef30d III
4/20/2020 BIM 360 Document Management
AUTODESK° BIM 360` fort:^.orthgov > CO2288-Timberland Blvd and Park Vista Blvd - A TT
.,, Document
FOLDERS REVIEWS TRANSMITTALS ISSUES
Management
Reviews > Review detail
CLOSED #34 Construction Allowance Request No.3
Export Report This review is closed.
Name Desci PROGRESS
No comments, good
Construction Allowance Request No.3 CO228... -- documentation provided.
C! Construction Allowance Request No.3 CO228... -- Reviewer 3 Initial Review 3 n
Guard rait.pdf WJ William Johnson Jan 6, 1:18 PM
<william.johnson@fortworthtexas.gov:
Mt.Gilead pavement markings.pdf --
Submitted to Reviewer 4
TxDOT Concrete Thickness.pdf --
Reviewer 4 Initial Review 4
DB Douglas Black Jan 6,2:22 PM
<doug.black@fortworthtexas.gov>
Submitted to Approver
Approved.
Approver Final Review n
DB Dana Burghdoff Jan 6,3:46 PM