HomeMy WebLinkAbout2011/11/01-Minutes-HEDCCITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Present:
Committee Member Joel Burns, Chairman
Committee Kathleen Hicks, Vice Chair
Committee Member Betsy Price (Arrived at 1:35 p.m.)
Committee Member Salvador Espino (Arrived at 1:05 p.m.)
Committee Member W. B. "Zim" Zimmerman
Committee Member Danny Scarth
Committee Member Jungus Jordan
Committee Member Dennis Shingleton
Absent:
Committee Member Frank Moss
City Staff:
Fernando Costa, Assistant City Manager
Peter Vaky, Deputy City Attorney
Ron Gonzales, Assistant City Secretary
Jay Chapa, Director of Housing and Economic Development Department
Cynthia Garcia, Assistant Director, Housing and Economic Development Department
Robert Sturns, Manager, Housing and Economic Development Department
Sonia Singleton, Interim Assistant Director, Parks & Community Services Department
Other City Staff in Attendance:
Tom Higgins, City Manager
Vicki Ganski, Senior Assistant City Attorney, Law Department
LeAnn Guzman, Assistant City Attorney, Law Department
Richard Zavala, Director of Parks and Community Services Department
Mark Folden, Business Development Coordinator, Housing and Economic Development Dept.
Robin Bentley, Community Development Manager, Housing & Economic Development Dept.
Henry Day, Senior Management Analyst, Housing & Economic Development Department
Otis Thornton, Homeless Program Coordinator, Housing & Economic Development Department
Pat Scavina, Contractor,City Manager's Office
Guests:
Bishop Kevin Vann, Vice Chancellor for Administration, Catholic Diocese of Fort Worth
Peter Flynn, Finance Director, Catholic Diocese of Fort Worth
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 2 of 23
With a quorum of the committee members present, Chairman Joel Burns called the
meeting of the Housing and Economic Committee to order at 1:04 p.m., on Tuesday,
November 1, 2011, in the Pre - Council Chamber of the Fort Worth Municipal Building, 1000
Throckmorton Street, Fort Worth, Texas 76102, with Committee Members Betsy Price and
Salvador Espino temporarily absent and Committee Member Frank Moss absent.
Approval of Minutes from October 4, 2011,
Housing and Economic Development
Committee
(Agenda Item 2)
MOTION: Upon a motion made by Committee Member Jordan and seconded by Committee
Member Hicks, the Committee Members voted six (6) "ayes" and zero (0) "nays ",
with Committee Members Price, Espino and Moss absent, to approve the minutes
of the October 4, 2011, Housing and Economic Development Committee
Meeting. The motion carried unanimously.
Chairman Burns advised that Agenda Item 3 pertaining to the update from the Catholic
Diocese would need to be delayed until later on the agenda as Bishop Vann had not arrived at the
meeting. He stated that he would move Agenda Item 5 regarding the Economic Development
Agreement with Bell Helicopter up on the agenda to be considered at this time.
Presentation on Economic Development
Program Agreement with Bell Helicopter (Agenda Item 5)
(Committee Member Espino arrived at the meeting.)
Jay Chapa, Director, Housing and Economic Development Department, addressed the
Committee regarding the proposed agreement. He stated that the proposal was an effort to
consolidate and upgrade the facilities on State Highway 10. He recognized the following
individuals in the audience who had worked with the Housing and Economic Development
Department staff on the proposed agreement: Bob Hastings (Bell Helicopter), Todd Burnette
(JLL), Steve Lair, Mike Concupp and Brian Chase.
Using a PowerPoint presentation, Mr. Chapa began with providing information on the
background of the company as follows:
• Founded in 1935.
• Headquartered in Fort Worth, Texas.
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 3 of 23
Presentation on Economic Development
Program Agreement with Bell Helicopter
(cont'd) (Agenda Item 5)
• Additional plants in Amarillo, TX and Mirabel, Canada.
• Maintain key logistics supply and service centers in Europe, Canada and
Singapore as well as the USA.
Mr. Chapa's next slide reflected three pictures of commercial and military helicopters
that the company currently produced. He transitioned to the next slide which provided an
explanation of the proposed project as reflected below:
• Expansion/consolidation of current Fort Worth facilities at the main headquarters
operation located south of Highway 10 and north of Trinity Boulevard and at
CentrePort distribution facility.
• Project consists of a new headquarters facility, employee center and training
academy at the headquarters site.
• This project will be constructed in four (4) phases.
• Effort is to improve efficiencies that will allow Bell to stay competitive in the
long term.
Mr. Chapa transitioned to his next slide which was a map that depicted the locations of
Bell Helicopter facilities in Tarrant County. He explained that the facilities in the blue boxes
were two (2) facilities (Plant 8A and Plant J) located in Fort Worth and one (1) facility (Plant
8B) in Roanoke. He added that the proposal was to consolidate those locations into the two (2)
areas indicated by the red boxes that were located in Fort Worth with a small amount going to
Plant 5 in Grand Prairie. He pointed out that the majority of the consolidation would be at the
headquarters site.
He then provided the following information pertaining to the development commitments
of the proposed agreement:
• Investment
• Minimum investment of $235M by December 31, 2015.
• Fort Worth Construction — Minimum of 30 %.
• Fort Worth M /WBE Construction — Minimum of 25 %.
• Jobs
o Retain 4,500 FTE from December 31, 2014, through December 31, 2020.
0 4,100 FTE by December 31, 2022.
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 4 of 23
Presentation on Economic Development
Program Agreement with Bell Helicopter
(cont'd) (Agenda Item 5)
0 3,900 FTE by December 31, 2028.
o Maintain 20% of FTE with Fort Worth residents.
o Maintain 5% of FTE with Central City residents.
• Supply & Service
• Fort Worth contractors —minimum of $1,000,000.00.
• Fort Worth M /WBE contractors — minimum of $500,000.00.
Mr. Chapa provided an explanation of the $235M investment by advising the Committee
on the development commitments by phase as follows:
• Phase I -- $5M
o Construction of a new employee center by December 31, 2012.
• Phase II -- $5M
• Relocation, consolidation and renovation for the repair and overhaul
activities as well as relocation of inventory to the central distribution
center at CentrePort by December 31, 2013.
• If the additional new investment is not met, the program grants will be
reduced by 15% for the remainder of the agreement.
• Phase III -- $50M
• Construction of a new main headquarters and administration building and
associated infrastructure at Highway 10 and Bell Spur by December 31,
2014.
• If the additional new investment is not met, the program grants will be
reduced to a maximum of 50% for the remainder of the agreement.
• Phase IV -- $15M
• Construction of a new training academy at Norwood Drive and Trinity
Boulevard by December 31, 2015.
• If the additional new investment is not met, the program grants will be
reduced by 5% for the remainder of the agreement.
• $160 million in personal property to be invested by December 31, 2015.
Mr. Chapa then displayed a slide that reflected the existing configuration for Plants 1 and
2 at the headquarters site. He made reference to the location of the plants in relation to State
Highway 10, the Trinity Railway Express line and Trinity Boulevard on the south end. He noted
that Bell nomenclature for the specific buildings was indicated by numbers 1, 2, 3, etc.
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 5 of 23
Presentation on Economic Development
Program Agreement with Bell Helicopter
(cont'd) (Agenda Item 5)
His next slide depicted the proposed site plan for Plants 1 and 2 and he explained that the
blue area indicated new construction and the yellow area indicated where rehabilitation and
update of buildings would occur. He pointed out that the breakout of $70 million in new
construction fell in the blue and yellow areas, advised that certain buildings would be
demolished and explained where the training academy and the new landing strip were located.
As a point of reference he explained where Norwood and Bell Spur were located on the site plan.
Mr. Chapa's next slide reflected renderings of the consolidated campus administration
building followed by a slide with renderings of the training academy. He then showed an aerial
view of the location that reflected a red box indicating where the training academy would be
located. He explained that Norwood, indicated by a black box, was originally a County road in
Fort Worth and that staff was working with Bell Helicopter to try and improve the roadway as
there would be a significant amount of traffic created by all the employees being located at this
area.
Mr. Chapa then presented information relative to the staff's recommended economic
development incentive as follows:
• City enters into a one (1) year tax abatement (to allow the County to participate)
and 19 -year, Chapter 380 Economic Development Program Agreement to
abate /refund up to 80% on incremental ad valorem taxes created within Fort
Worth above current Bell taxes base.
• Waiver of development fees associated with the project.
• Enter into an Enhanced Community Facilities Agreement of up to $1.0 million for
the road improvements on South Norwood Street.
Mr. Chapa explained information on the next slide which depicted a table regarding the
proposed incentive terms for this project as indicated below:
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 6 of 23
Presentation on Economic Development
Program Agreement with Bell Helicopter
(cont'd)
(Agenda Item 5)
Company Commitment
Potential
Abatement
Real and Personal Property Investment
30%
Fort Worth Contractors
10%
Fort Worth M /WBE Contractors
5%
Overall Employment
5%
Employment of Fort Worth Residents
10%
Employment of Fort Worth Central City Residents
10%
Utilization of Fort Worth Companies for Services and Supplies
5%
Utilization of Fort Worth M /WBE Companies for Supplies and Services
5%
TOTAL
80%
• Failure to meet investment deadline for Phase I results in default and termination of
agreement and other phases have reduction of abatement /grant.
• Failure to meet a commitment will result in a reduction of the corresponding component
of the grant for that year proportional to the amount the commitment was not met.
Mr. Chapa completed his presentation of the proposed project with the below
development summary:
• Private Investment
o Minimum of $235M in real and personal property.
• Employment
o 4,500 by December 31, 2020.
• Public Investment for abatement and 380 grant capped at 10:1 ratio private
investment to public investment.
• Estimated Benefit $13,500,000.00.
• Estimated Ratio 16:1.
• Norwood Infrastructure ECFA: $1,000,000.00.
• CFW Tax Revenue (20 year projection)
• Estmated New RP & BPP $ 3,375,000.00
• Existing RP & BPP $43,325,000.00
• Total Revenue $46,690,000.00
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 7 of 23
Presentation on Economic Development
Program Agreement with Bell Helicopter
(cont'd) (Agenda Item 5)
Chairman Burns opened the floor for questions and /or comments.
Chairman Burns referred to the previous slide pertaining to the recommended economic
development incentive for the Norwood commitment which indicated that the Committee was
limited to a $1 million investment for the master thoroughfare plan (MTP) which was a $4M
potential and asked who made the final determination on what would be built there. Mr. Chapa
clarified that the staff would be working with the Transportation and Public Works Department
and Bell's engineers. He added that Bell currently had a traffic study going on for the potential
impact on Norwood going forward and that the MTP called for it to be four (4) lane concrete
curb and gutter roadway that was estimated at $4M. He stated that an evaluation was underway
to determine if the work could be done in phases, for instance building just two (2) lanes with
curb and gutter to provide access and turn lanes for Bell employees and then later be built out
with the additional lanes in a later phase. He pointed out that the agreement was that the City
would provide up to $1M towards that cost for the project and if Bell determined at a later time
that they needed all four lanes, they would bring additional money to the table to fund the
additional lanes. He added that the County was also considering participating in some portion of
that cost. Mr. Chapa emphasized that the Enhanced Community Facilities Agreement would be
separate from this agreement.
Committee Member Shingleton stated that this was a great anchor for the City and
expressed appreciation for the efforts of Bell and City staff on this project.
There was no further presentation or discussion on this agenda item.
Chairman Burns advised that Bishop Vann had arrived at the meeting and Agenda Item 3
regarding the presentation on the update on development activities of the Catholic Diocese
would be heard at this time.
Update on Catholic Diocese of Fort Worth
Development Activities (Agenda Item 3)
Bishop Kevin Vann, Catholic Diocese of Fort Worth, stated that he was glad to be before
the Council again and provided opening remarks pertaining to the purpose of the presentation.
He provided background information on the diocese's involvement with development in the City
and in the surrounding counties.
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 8 of 23
Update on Catholic Diocese of Fort Worth
Development Activities (cont'd) (Agenda Item 3)
Mr. Peter Flynn, Vice Chancellor for Administration and Finance Director, Catholic
Diocese of Fort Worth, provided a PowerPoint presentation entitled "Building on 40 Years of
Tradition to Meet Tomorrow's Growth ". His first slide entitled "Established in 1969" contained
the following information:
• 28 Counties of North Texas.
o 24,000 square miles.
• 65 Parishes in 1969 — 67,000 Catholics.
0 89 Parishes in 201 1 —710,000 Catholics
0 20 Schools in 2011 — 6,000 Students
Mr. Flynn then showed a series of slides that reflected the expansion of the diocese over
the last 10 years at a total cost of $75.5 million. The expansion encompassed facility relocations,
new locations, new buildings, restoration or renovations of existing facilities and replacements,
as reflected below:
• Relocation and Expansion of Center City Parishes - $11.5 Million
• Our Lady of Guadalupe Parish - $3.5 Million
• Our Lady of Fatima Parish - $400,000.00
• Immaculate Heart of Mary Parish - $4.1 Million
• Holy Name Parish - $3.5 Million
• Investment in Center City Catholic Schools - $9.3 Million
• Our Mother of Mercy School - $2.6 Million
• All Saints School - $4.1 Million
• St. George School - $1.6 Million
• Cassata High School - $1 Million
• St. Patrick Cathedral - $13.5 Million
o Exterior Preservation
• Interior Renovation
• Rectory Restoration
• New Parish Hall Construction
• New Construction Projects - $26.65 Million
• Nolan Catholic High School - $10 Million
• Catholic Charities - $14 Million
• All Saints Parish Hall - $2.5 Million
• Holy Name Parish Rectory - $150,000.00
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 9 of 23
Update on Catholic Diocese of Fort Worth
Development Activities (cont'd)
• New Construction Projects - $12.15 Million
• St. Bartholomew Parish Center - $5 Million
• Christ the King Parish Hall - $2.5 Million
• Immaculate Heart of Mary Parish Center - $4.4 Million
• All Saints Parish, San Jose Center - $250,000.00
(Committee Member Jordan left his place at the table.)
• Renovation Projects - $3.4 Million
• St. Andrew Parish Hall - $2 Million
• Our Mother of Mercy Church - $350,000.00
• Respect of Life Office - $150,000.00
• St. Rita Parish Church - $900,000.00
(Agenda Item 3)
Mr. Flynn advised that over the next 10 years, the diocese was planning on further
expansions at a total projected cost of $50 million. He added this would encompass new
parishes, larger churches and expansion of parish facilities. He continued with his presentation
by summarizing his next slide pertaining to future growth as follows:
• Recent diocesan study projects more than 1.2 million Catholics by 2030.
• Growth will occur in six (6) county urbanized areas around Tarrant and Denton
Counties.
• One of the fastest growing dioceses — similar to the Fort Worth metropolitan area
growth.
• Study calls for up to 14 additional parishes in next 18 years.
(Committee Member Price arrived at the meeting.)
He next briefed the Committee on the new Chancery office as reflected below:
• Present facility is inadequate for the growing reality of the diocese.
• Return to downtown has been a goal.
• Opportunity to bring together Central Administrative Office and Cathedral as
visible statement to City.
• Need new dedicated Archive Facility.
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 10 of 23
Update on Catholic Diocese of Fort Worth
Development Activities (cont'd) (Agenda Item 3)
Mr. Flynn continued with his presentation by showing a slide containing an aerial view of
the properties that were part of the Lancaster Mixed Use Project. He made reference to the
location of St. Patrick's Cathedral in relation to the project and the considerations proposed for
the diocese in exchange for the City's acquiring the parking lot owned by the diocese for a future
parking garage for the development. He explained elements of the project in relation to the
diocese as follows:
• Three stories for Central Administrative Office.
• Top Three Floors.
• 37,500 Square Feet.
• 1/3 bigger than the present Catholic Center.
• 100 parking spots for employees and visitors.
• 100 parking spots for St. Patrick's Cathedral.
• Using Cathedral land for parking garage.
His next two slides showed a rendering of the proposed building where the Central
Administrative Office would be located and a rendering of the proposed design for the parking
garage. He then outlined the projected costs of the new building as reflected below:
• Parking 200 Spots - $ 1,900.000.00
• Three Floors - $ 9,000,000.00
• Archive Facility - $ 750,000.00
• Total Estimated Cost - $11,650,000.00
Mr. Flynn then displayed an aerial view of property recently acquired for the needed
expansion of Nolan Catholic High School before transitioning to his next slide pertaining to the
projects underway for the next 12 months as follows:
• Christ the King Parish Church Expansion - $1 Million
• Holy Family Parish New Rectory - $350,000.00
• Immaculate Heart of Mary Parish New Rectory - $280,000.00
• San Mateo Mission Parish Center - $1 Million
• St. Peter the Apostle School Renovations - $ 1 Million
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 11 of 23
Update on Catholic Diocese of Fort Worth
Development Activities (cont'd) (Agenda Item 3)
Mr. Flynn concluded his presentation by briefing the Committee on the diocese's plan for
the future relative to pending projects as reflected below:
• Our Mother of Mercy School Playground on former property of Mrs. Peace.
• St. Mary of the Assumption Parish, New Parish Hall.
• St. Thomas the Apostle Parish, Relocation from Azle Avenue to larger site in
Marine Creek area.
• Ministry Formation Center.
• New Land Acquisition for New Parish Sites.
Chairman Burns opened the floor for questions and /or comments.
Committee Member Scarth stated that there was not one part of the City that had not been
touched by what the diocese was doing. He added that on the east side they were proud to have
Nolan Catholic High School which was one of the leading private schools in the county. He
pointed out that they had looked for a number of years for an appropriate use for the vacant
property and the surrounding community was thrilled that the property would be used for the
school. He stated that the growth at Christ the King had previously created issues regarding
parking but that a neighborhood meeting hosted by the church addressed those concerns.
Committee Member Espino stated that the expansion in the last 10 years was a significant
investment and that diocese was a great partner to the City. He added that the investment added
to several communities and enhanced the education in the parochial schools. He further stated
that there was growth in the center city and growth in the growth areas. He asked what the
projections were for the far north Fort Worth area such as St. Elizabeth Ann Seaton in Keller, St.
Thomas the Apostle in Azle and the potential for a new high school in the area.
Bishop Vann responded by stating that the diocese engaged a firm several years ago and
the projection for the parishes reflected in the PowerPoint came from that firm. He added that
they had been working with Father Hart at St. Elizabeth Ann Seaton to develop a whole plan that
included a new high school for the area and another parish north of that location.
Mr. Flynn also advised that the diocese did own property on IH 170 and Alta Vista which
was a facility that had been identified as the next parish to open in future. He added that the
diocese also owned 60 acres in the Heritage area.
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 12 of 23
Update on Catholic Diocese of Fort Worth
Development Activities (cont'd) (Agenda Item 3)
(Committee Member Jordan returned to his place at the table.)
Chairman Burns commended the diocese for return to the Downtown area and added that
it would add to the vibrancy of the area. He expressed appreciation for the diocese's stewardship
of the restoration of the existing building downtown. He pointed out that he made a request to
the City to rename the street leading to the Catholic Charities building "Charities Way ". He
added that he would ensure the diocese was informed of any celebration regarding the issue.
Committee Member Price inquired about the number of people in the diocese. Bishop
Vann responded that there approximately 710,000 Catholics, which was in par with East Coast
and Midwest dioceses.
The presentation and discussion was concluded on this agenda item.
(Committee Member Espino left his place at the table.)
Update on Economic Development Program
with GE Transportation
(Agenda Item 4)
Mr. Robert Sturns, Economic Development Manager, Housing and Economic
Development Department, began his presentation by reminding the Committee that in May 2011
when this project was brought before the committee for approval there was a strong possibility
that GE would look at additional investment at this site as there was some vacant land under
consideration next to their site and they were looking at available options. He added the decision
to expand came sooner than expected which was the purpose of today's update. Using a
PowerPoint presentation, Mr. Sturns provided the following information about GE
Transportation:
• Global technology leader and supplier to the railroad, marine, drilling, wind and
mining industries.
• ISO -9001 certified company.
• +$3.5 billion in sales.
• Transportation division headquartered in Erie, PA.
• Employs — 8,000 worldwide.
(Committee Member Jordan left his place at the table.)
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 13 of 23
Update on Economic Development Program
with GE Transportation (cont'd) (Agenda Item 4)
• Products: Freight, passenger locomotives, railway signaling, communications
systems, information technology solutions, marine engines, motorized drive
systems for mining trucks and drills, high- quality replacement parts, value -added
services.
He then displayed an aerial view of the location that reflected a red box of the site at
12850 Three Wide Drive which included the vacant land. He then displayed a closer aerial view
of the location and explained that the existing IDI distribution center indicated by a blue box
would be converted into a 900,000 square foot manufacturing facility. He advised that the area
in the red box was the vacant land to the north which had already been purchased by the
company.
Mr. Sturns transitioned to the next slide regarding Phase I of the project and summarized
the project as follows:
• Expansion of existing 670,000 square foot distribution center — 900,000 square
foot manufacturing facility.
• At least $20M in real property improvements.
• At least $40M in non - inventory personal property improvements.
• Deadline: December 31, 2012
(Committee Member Espino returned to his place at the table.)
He then provided information pertaining to the Evolution® Series Locomotive as
reflected below:
• Most technologically advanced, diesel - electric, heavy -haul locomotive in the
world today.
• 12- cylinde engine produces the same horsepower as its 16- cylinder predecessor.
• Less fuel, emissions than previous models.
• Meets EPA Tier 2 emissions requirements.
• 4,100 operating in 10 countries.
Mr. Sturns transitioned to his next slide and presented a summary on Phase II of the
project as follows:
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 14 of 23
Update on Economic Development Program
with GE Transportation (cont'd) (Agenda Item 4)
• Construction of new 236,000 square foot mining equipment plant on vacant land
adjacent to existing distribution center.
• At least $20M in real property improvements.
• At least $30M in non - inventory personal property improvements.
• Deadline: December 31, 2012 (Same as Phase I)
He then presented a slide that provided information on the mining product line,
specifically, Off Highway Vehicle Trucks and Fort Worth Facility Workscope. He then advised
of the following company goals:
• Investment
• Minimum total investment of $110M ($40M RP & $70M BPP)
• Spend greater of $10M or 25% of construction costs with Fort Worth
companies.
• Spend greater of $ l0M or 25% of construction costs with Fort Worth
M /WBE companies.
• Jobs
• Minimum of 420 full -time employees (FTE) by December 31, 2012.
• Minimum of 500 full -time employees (FTE) by December 31, 2013.
• Up to 875 FTE by December 31, 2016.
• 30% of FTE with Fort Worth residents.
• 10% of FTE with Central City residents.
• Supply & Service
0 30% or $400,000.00 with Fort Worth contractors.
0 10% or $130,000.00 with Fort Worth M /WBE contractors.
Mr. Sturns then provided an explanation of the City's commitments as reflected in the
following table:
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 15 of 23
Update on Economic Development Program
with GE Transportation (cont'd)
(Agenda Item 4)
City Commitment
Potential
Abatement
Real and Personal Property Investment
35%
Fort Worth Contractors
5%
Fort Worth M /WBE Contractors
5%
Overall Employment
15%
Fort Worth Employees
10%
Central City Employees
5%
Utilization of Fort Worth Companies for Services and
Supplies
5%
Utilization of Fort Worth M /WBEs for Supplies and
Services
5%
TOTAL
85%
Mr. Sturns provided the following development summary:
Original Proposal
• Private Investment
- Minimum of $60.OM real and
personal property
• Employment
- Up to 775 by December 31, 2016
• Public Investment $3.3M
• Ratio (Private /Public) 18:1
- City Participation 5.5%
- Est. New Tax Rev. $580,000
New Proposal
• Private Investment
- Minimum of $110.OM real and
personal property
• Employment
- Up to 875 by December 31, 2016
• Public Investment $5.4M
• Ratio (Private /Public) 20:1
- City Participation 4.9%
- Est. New Tax Rev. $950,000
Mr. Sturns completed his presentation with the following staff recommendation:
• Enter into a 10 -year tax abatement agreement with GE Transportation that could
potentially abate up to 85% of the City's incremental taxes generated from real
property improvements and business personal property investment at the site of
new manufacturing and mining facilities.
• Waive fees associated with the project.
(Committee Member Jordan returned to his place at the table.)
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 16 of 23
Update on Economic Development Program
with GE Transportation (cont'd)
Chairman Burns opened the floor for questions and /or comments.
There was no further presentation or discussion on this agenda item.
Update on the Energy Assistance and
Weatherization Assistance Programs
(Agenda Item 4)
(Agenda Item 6)
Ms. Cynthia Garcia, Assistant Director, Housing and Economic Development
Department, began her briefing by advising the Committee that the energy assistance program
portion of the briefing would be provided by Sonia Singleton, Interim Assistant Director, Parks
& Community Services Department. She added there were some questions about the
Weatherization Assistance Program at the last meeting and this briefing would provide an update
of the program over the last two (2) years. She provided the following information pertaining to
the weatherization overview:
• City receives annual funding (Regular WAP) and stimulus funding for the
Weatherization Program (ARRA WAP).
• Purpose: To reduce energy costs for low- income families by improving the
energy efficiency of their homes.
o Replace:
• Leaking or non - compliance water heaters, gas stoves /ovens, gas
space heaters due to high carbon monoxide readings.
• Energy inefficient refrigerators and central air conditioning units/
wall units with an energy -star more efficient unit.
• Install:
• Compact fluorescent lights in all fixtures.
• Insulation for walls, floors and attics.
• Complete minor repairs to protect the weatherization improvements
installed (i.e., siding repairs).
Ms. Garcia then provided information relative to the current status of the programs as
indicated below:
• ARRA WAP
o Complete 344 units by the end of the ARRA contract in March 2012.
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 17 of 23
Update on the Energy Assistance and
Weatherization Assistance Programs
(cont'd)
(Agenda Item 6)
• Regular WAP
• Annual contracts — various end dates.
• Program transferred to Parks and Community Services Department on
October 1, 2011.
• Will complete 200 single family units by March 31, 2012.
Ms. Garcia's next slide pertained to the WAP income eligibility breakdown as follows:
Size of
Annual
Monthly
Weekly
Family
Income
Income
Income
1
$21,660.00
$1,805.00
$417.00
2
$29,140.00
$2,428.00
$560.00
3
$36,620.00
$3,052.00
$704.00
4
$44,100.00
$3,675.00
$848.00
5
$51,580.00
$4,298.00
$992.00
6
$59,060.00
$4,921.00
$1,136.00
7
$66,540.00
$5,545.00
$1,280.00
8
$74,020.00
$6,168.00
$1,423.00
For families with more than eight (8) persons, add $7,480.00 for each additional person.
Her next slide showed a table relative to funding information for the program as follows:
Regular WAP
ARRA WAP
Department of Energy
$ 353,795.00
(Maximum per house $6,500.00)
DOE -Low Income Home Energy
$1,207,513.00
Assistance Program (LIHEAP)
(Maximum per house $4,000.00)
Oncor
$ 300,000.00
Texas Association of Community
$ 500,000.00
Action Agency (TACAA)
(Maximum per house $6,500.00)
ARRA Funding
$15,146,008.00
(Maximum per house $6,500.00)
TOTAL
$21361,308.00
$15,146,008.00
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 18 of 23
Update on the Energy Assistance and
Weatherization Assistance Programs
(cont'd)
(Agenda Item 6)
Ms. Garcia then presented a slide with a table that contained information regarding the
amount of units completed during 2010 -2011 as reflected below:
Unit Type
Regular WAP
ARRA WAP
Single Family
250
307
Multi - Family
0
1,759
TOTAL
250
2,066
It is anticipated that the City will complete 344 units by the end of the ARRA
contract in March (304 multi family units and 40 single family units).
She advised the Committee on the following information pertaining to the waiting list for
weatherization services:
• ARRA WAP
o City closed single family list last year — all approved applicants will be
completed by March 2012.
• Regular WAP
• City stopped approving applications in October 2010.
■ Currently approximately 110 on the waiting list.
• List of approximately 2,300 waiting to apply for program. Housing and
Economic Development Department will notify the 2,300 to contact
Community Action Call Center to schedule an appointment to determine if
they are eligible to apply for the program.
Ms. Garcia then displayed a colored map that reflected the locations of weatherization
services had occurred within Fort Worth city limits and within Tarrant County. She explained
that the colored boxes as follows:
- Gold Boxes: DOE -ARRA Single Family (Completed).
- Pink Boxes: DOE -AARA Multi- Family (Completed).
- Green Boxes: LIHEAP -TACAA Single - Family (Completed)
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 19 of 23
Update on the Energy Assistance and
Weatherization Assistance Programs
(cont'd) (Agenda Item 6)
Ms. Garcia concluded her presentation by recognizing Mr. Joe Cordova, Manager of the
program, and members of the weatherization staff and stated that they had done a wonderful job.
She added that they had completed an incredible amount of units in a short amount of time and
pointed out that the program was so successful that the State had asked City staff to take
additional funds on two occasions She further stated that she and Mr. Cordova had attended a
meeting in Austin last week and it was noted that Fort Worth had a model program.
Mr. Richard Zavala, Director, Parks and Community Services (PALS) Department, stated
that he wanted to take this opportunity to give the Committee the big picture on what they did in
the PACS department. He asked that the Committee keep in mind the due diligence process
PACS went through to qualify their clients as they did not have the type of resources to help as
many people as they would like to so the process was very detailed to ensure that the dollars they
received from the State helped as many people as possible. He pointed out that they did have
safety net dollars because of contributions that had been received and that this program view
would provide how the weatherization program fit into a PACS program to reveal that it was a
very good way of doing business as it was very strategic. He introduced Ms. Sonia Singleton,
Interim Assistant Director, Parks & Community Services Department
Ms. Singleton advised that she would be provided information regarding the Community
Action Partners (CAP) Program and the services they provided. Using a PowerPoint
presentation, she began by stating the City of Fort Worth was designated as a Community Action
Partner (CAP) in 1981 and provided the following additional information:
• Serves as the Community Action Agency for Tarrant County.
• Primary Funding Source
• Community Services Block Grant*
• Comprehensive Energy Assistance Program*
*Texas Department of Housing and Community Affairs
Her next slide pertained to PACS services as noted below:
• Primary Services
o Utility Payment Assistance (Texas Department of Housing and
Community Affairs (TDHCA) : Comprehensive Energy Assistance
Program (LEAP)
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 20 of 23
Update on the Energy Assistance and
Weatherization Assistance Programs
(cont'd) (Agenda Item 6)
• Heating/Cooling Repair, Replace, or Retrofit (TDHCA:CEAP)
• Water Bill Payment Assistance (CFW /Monarch Utilities)
• Case Management: Families in Transition (TDHCA:CEAP)
• Homeless Prevention (HUD:ESG)
• Holiday Gifting Programs (CSBG, Donations & GF [lease])
• Cowboy Santas Program
• Silver Stars
• Special Youth Nutrition Programs
• Summer Food (TDA)
• Afterschool Snack (TDA)
• Kids Cafe (Tarrant County Food Bank)
Ms. Singleton then provided an explanation of her next slide which reflected information
on the CAP service delivery structure for various areas in the City. She transitioned to the
following slide that pertained to the Comprehensive Energy Assistance Program and advised that
the program was comprised of four (4) components reflected below:
• Energy Crisis — Assist households in danger of losing access to energy during
cases of extreme weather. Energy Crisis assistance for one (1) household cannot
exceed their allocation of up to $1,600.00 in one (1) year.
• Elderly /Disabled — Eligible households may receive up to eight (8) payments
depending on their energy priority rating.
• Co- Payment — Provides up to six (6) months utility assistance along with case
management services to achieve long -term energy self - sufficiency and financial
independence by offering support to locate or maintain employment while
enrolled in program.
• Heating/Cooling — This component reduces the household's energy burden by
reducing the energy demand from inefficient heating and cooling appliances
(stoves are not eligible for replacement). Households may receive up to
$6,000.00 in assistance.
She advised the Committee of the following information regarding weatherization:
• Customers experience "One Stop Shop"
• Increased access to services
• Improved program coordination
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 21 of 23
Update on the Energy Assistance and
Weatherization Assistance Programs
(cont'd) (Agenda Item 6)
Ms. Singleton then shared information regarding other related programs for this initiative
as follows:
• Atmos: Share the Warmth (Utility Payment Assistance)
• Atmos: Keep the Warmth (Energy Efficiency)
• TXU Energy Aid
• Water Donation Funds
o CFW and Monarch Utilities
Ms. Singleton concluded her presentation by explaining her last two slides. The slide on
Consumer Demand reflected a bar graph indicating assistance provided in 2010 and 2011. The
slide on CEAP Funding Trends reflected allocations from 2007 through 2011.
Chairman Burns opened the floor for questions and /or comments.
Committee Member Hicks expressed appreciation to staff for all they did and added that
there was so much need in the community especially with the difficult economy. She added that
she was pleased to see the funding increased and pointed out that the Council knew about the
difficulty with obtaining a quorum for some meetings. She offered the assistance of Council
Aides to attend the meetings when necessary to allow business at the meetings to take place.
Committee Member Shingleton stated that residents in the Como area greatly depended
on the assistance of the CAP program, particularly in after school services and expressed his
appreciation to Ms. Singleton for her leadership with the program.
Committee Member Price expressed appreciation to Ms. Singleton and pointed out that
the program recently received Nooks from Barnes and Noble which were accepted by Ms.
Singleton.
There was no further presentation or discussion on this agenda item.
Executive Session (Agenda Item 7)
Chairman Burns stated that he had been advised that an Executive Session was not
necessary on the following items:
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 22 of 23
Executive Session (cont'd) (Agenda Item 7)
A. Seek the advice of its attorneys concerning the following items that are exempt from
public disclosure under Article X, Section 9 of the Texas State Bar Rules, as
authorized by Section 551.071 of the Texas Government Code: (i) legal issues
related to any current agenda items;
B. Discuss the purchase, sale, lease or value of real property, as authorized by Section
551.072 of the Texas Government Code. Deliberation in an open meeting would
have a detrimental effect on the position of the City in negotiations with a third party;
and,
C. Discuss or deliberate negotiations relating to any economic development
negotiations, as authorized by Section 551.087 of the Texas Government Code.
This agenda item was passed over.
Request for Future Agenda Items (Agenda Item 8)
Chairman Burns opened the floor for requests for future agenda items. .
Committee Member Espino referred to the Joint Meeting between the Fort Worth City
Council and the Board of Directors of the Fort Worth Independent School District (FWISD). He
stated that it would be helpful for other ISDs in the area (Crowley, Keller, Northwest, White
Settlement) to send representatives to make a presentation at either a Housing and Economic
Development Committee meeting or perhaps at a Pre - Council Worksession and give an update
of what was happening in their districts. He asked that staff look at a schedule and perhaps have
those representatives provide updates at a future meeting.
Committee Member Hicks expressed appreciation to the staff for the ground breaking at
Terrell Heights which was attended by Mayor Price and Council Member Shingleton. She added
that the area had so many empty lots and the new houses would be a significant achievement for
the city. She expressed appreciation to Jay Chapa and Cynthia Garcia from the Housing and
Economic Development Department and added that she hoped to see in this type of development
in the Como area and on the Northside of the City. She also pointed out that the support from
the Council on this development was greatly appreciated.
CITY OF FORT WORTH
CITY COUNCIL
HOUSING AND ECONOMIC DEVELOPMENT COMMITTEE
NOVEMBER 1, 2011
Page 23 of 23
Date of Next Regular Meeting —
December 6, 2011 (Agenda Item 9)
Chairman Burns advised that the next regular meeting of the Housing and Economic
Development Committee was tentatively scheduled for Tuesday, December 6, 2011.
Adiourn
(Agenda Item 10)
With no further presentations or discussions, Chairman Burns adjourned the regular
meeting of the Housing and Economic Development Committee at 2:23 p.m., on Tuesday,
November 1, 2011.
These minutes approved by the Housing and Economic Development Committee on the
6`h day of December, 2011.
Minutes Prepared by and Attest:
I G�'
P. Gonzales,
City Secretary
APPROVED:
oMB rn�sCha�irm a