HomeMy WebLinkAboutOrdinance 5233 FOFFICIAL RECORD
ORDINANCE NO. ! Z --- SSEEnCRETARY
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST ORNII, TEX-
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A
MBBRIC% STREW
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING
THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE
CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE
CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Fort.Worth,Texas,has heretofore ordered that each of the
hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im-
proved by raising, grading and filling same and by constructing thereon the following, to-wit:
1. MEREICg STPE>rlPI From Bast—west Freeway to Bryce Avenue, known
and designated as Unit No. 1, a 1* inch hot mix
Asphaltic concrete surface on a 7 inch cement
stabilised gravel base on a variable 38 foot to
60 foot roadway.
2. GUILFORD BRAD: from Malvey Avenue to Camp Bowie Blvd., known
and designated as Unit No. 2, a 1* inch hot mix
asphaltic concrete surface on a 7 inch cement
stabilized gravel base on a 30 foot roadway.
3. WESTCLIFF R= SOUTH: From Bellaire Drive west to West end of street,
known and designated as Unit No. 3, a 1* inch
hot mix asphaltic concrete surface on a 7 inch
cement stabilized gravel base on a 30 foot
roadway.
4. HILLTOP 130iD: From Bellaire Drive west to west end of street,
known and designated as Unit No. 4, a 1f inch
hot mix asphaltic concrete surface on a 7 inch
cement stabilized gravel base on a 30 foot
roadway.
5. MCCART STMET: From Seminary Drive to 300 feet South of Gambroll
Avenue, known and designated as Unit Mo. 5, a 1i
Inch hot mix asphaltic concrete surface on a
7 inch cement stabilized gravel base on a variable
36 foot to 40 foot roadway.
6. PA ILL DRint From Stadium Drive to Wabash Avenue, known and
designated as Unit No. 6, a 1* inch hot mix
asphaltic concrete surface on a 7 inch cement
stabilized gravel base on a 30 foot roadway.
7. MISSISSIPPI AvIRdiJB: From Rest Berry to the South 190 feet, known and
designated as Unit No. 79 a 1i inch hot mix
asphaltic concrete surface on a 7 inch cement
stabilized gravel base on a 40 foot roadway.
s
together with combined concrete curbs and gutters on proper grade and line where same are not already so
constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of
said improvements to be constructed as and where shown on the Plans and in strict accordance with the Plans
and Specifications therefor; and contract therefor has been made and entered into with V-$- Sri ttas._ Inn,
; and
WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director
to prepare and file estimates of the cost of such improvements and estimates of the amounts per front foot
proposed to be assessed against abutting property and the owners thereof, and such estimates have been ex-
amined. NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
Such estimates be, and they are hereby adopted and approved.
II.
It is hereby found and determined that the cost of improvements on each portion of street,avenue and
public place hereinafter described, with the amount or amounts per front foot proposed to be assessed for
such improvements against abutting property and the owners thereof, are as follows, to-wit:
1. 143BRICK STRUT% From West Preeray to Bryce Avenue, known and
daeig-nated as Unit No. 1.
The estimated cost of improvements is $35. �•45 the estimated amount per front
foot to be ass@ssgd ainst abutting property and the owners thereof for combined concrete curb and
gutter is $ • ; the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is $AA—; the total
estimated amount per front foot to be assessed against abutting property and the owners thereof is
$ 2,37
2. GUILFORD ROAD: From Malvey Avenue to Camp Bowie Blvd., known and
designated as Unit No. 2.
The estimated cost of improvements is $— 39624,60 the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete curb and
gutter is $ 1•90 the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is $ 0000 . the total
estimedd amount per front foot to be assessed against abutting property and the owners thereof is
$ �t• .
3. WESTCLIFF ROAD SOUTH: From Bellaire Drive West to West end of street.
known and designated as Unit No. 3.
The estimated cost of improvements is $a.267•o5 ; the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete
gutter is $ 1e17 ; the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is $ 0.00 ; the total
estimated amount per front foot to be assessed against abutting property and the owners thereof is
$ 1.17
4. HILLTOP ROAD: From Bellaire Drive West to West and of street,
known and designated as unit No. 4.
The estimated cost of improvements is $_--%6Dl-.9D-_ ; the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete curb and
gutter is $LOD ; the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is the total
estimated amount per front foot to be assessed against abutting property and the owners thereof is
$ 1190
5. MCCART STEM: From Seminary Drive to 300 feet South of Gambrell
Avenue, known and designated as Unit No. 5.
The estimated cost of improvements is $ 17.6a.55 the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete curb and
gutter is the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is $_ 0•� ; the total
estirnateed0 amount per front foot to be assessed against abutting property and the owners thereof is
$ 1.
6. PABJMLL DRIVE: From Stadium Drive to Wabash Avenue, known and
designated as unit No. 6.
The estimated cost of improvements is $ 6,335.62 ; the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete curb and
gutter is $ 1.90 ; the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is the total
estimated amount per front foot to be assessed against abutting property and the owners thereof is
$ 1.90 .
7. 14ISSISSIPPI AMU : From East Ferry to the South 180 feet, known
and designated as Unit No. 7
The estimated cost of improvements is $ 5.947.70 ; the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete curb and
gutter is $ 1.90 ; the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is $ 0.00 ; the total
estimated0 amount per front foot to be assessed against abutting property and the owners thereof is
The estimated cost of improvements is $ the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete curb and
gutter is $ ; the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is $ ; the total
estimated amount per front foot to be assessed against abutting property and the owners thereof is
The estimated cost of improvements is $ the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete curb and
gutter is $ ; the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is $_ ; the total
estimated amount per front foot to be assessed against abutting property and the owners thereof is
$
The estimated cost of improvements is the estimated amount per front
foot to be assessed against abutting property and the owners thereof for combined concrete curb and
gutter is $ 1 1 ; the estimated amount per front foot to be assessed against abutting property
and the owners thereof for improvements exclusive of curb and gutter is $— • ; the total
estimated amount per front foot to be assessed against abutting property and the owners thereof is
, u
III.
A hearing be given and held by and before the City Council of the City of Fort Worth,Texas,to all own-
ing or claiming any property abutting upon said portions of streets,avenues and public places,as well as to all
owning or claiming any interest in any such property.Such hearing shall be given and held on the 1$ day of
S@ptmbat , 19 , at9=� ••� , in the Council Chamber in the City Hall in the City of Fort
Worth, Texas, and the City Secretary is hereby directed to give notice of the time and place of such hearing
and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called
Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Ses-
sion, now benig shown as Article 1105b of Vernon's Texas Civil Statutes.Such notice shall be by advertisement
at least three times in a newspaper published in the City of Fort Worth,Texas,the first publication to be made
at least ten days before the date of said hearing.Said notice shall comply with and be in accordance with the
terms and provisions of said Act. The City Secretary is further directed to give personal notice of the time
and place of such hearing to all owning or claiming any property abutting on said portions of streets,avenues
and public places,as well as to all owning or claiming any interest in-any such property. Such personal notice
shall be given by,the City Secretary mailing said notice postage prepaid, to the respective owners of record of
the properties to be assessed, and to any person owning or claiming any interest in said properties,to the last
known address of said owner or persons. It shall not be necessary for the City Secretary to mail said notices to
any owner or other person claiming an interest in the property to be assessed when the addess of such owner
or other person claiming an interest in the property to be assessed is unknown to the City Secretary and cannot
be determined by the City Secretary after reasonable investigation. In this connection the City Secretary shall
prepare and file with these proceedings a list of the properties to be assessed,the names of those persons own-
ing or claiming any interest in said properties to whom the notice was mailed, together with the last known
address of the respective owners and those persons owning or claiming any interest in said property.
The.City Secretary shall certify that each of the parties named in said list whose address was known to
him, was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice
was mailed. A copy of the notice shall be attached to such certificate. The certificate of the City Secretary will
be conclusive evidence of the facts therein recited. Failure of the City Secretary to give notice of hearing by
mail as herein provided for, or failure of the owners or other persons interested to receive said notice,shall in
nowise invalidate said hearing or any assessments levied pursuant to said hearing, but notice of hearing shall
be sufficient, valid and binding upon all owning or claiming such abutting property or any interest therein when
same shall have been given by newspaper advertisement as first hereinabove provided.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of
same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance
Records of this City.
V.
This ordinance shall take effect and be in full force and effect from and after the date of its passage.
Passed and approved this_- __day of— ,,� - -- 19 b
APPROVED.AS TO FORM AND LEGALITY:
City Attorney
City of Dort Worth, Texas
Mayor and Council Communication
DATE REFERENCE SUBJECT: Reconstruction of Gravel Base PAGE
NUMBER Streets at Seven locations, Project
8/24/64 C-363 No . 094-27000-115 Contract A-4) i °r 2
Reconstruction of gravel base streets is provided for in the 1964 Capital Im-
provement Program (A-177), with modifications as approved by the City Council
on April 20, 1964 (M&C G-636). On June 2, 1964, the following bids were re-
ceived:
Bidder Amount Wbrking Days
W. E. Brittain, Inc. $88,301.70 120
Glade Construction Co. 93,099.63 120
Texas Bitulithic Company 96,144.55 100
General Construction Company 97,917.35 75
SRO Asphalt, Inc., Arlington 106,154.00 100
The project consists of the following:
ROADWAY
„ UNIT STREET LIMITS WIDTH R.O.W.
1 Merrick Street From West Freeway to Bryce Ave. 38'-60' 100,
2 Guilford Road From Ma.lvey Ave. to Camp Bowie
Boulevard 30' 60'
3 Westcliff Road So. From Bellaire Dr. W. to West end
of street 30' 70'
4 Hilltop Road From Bellaire Dr. W. to West end
of street 30' 70'
4 5 McCart Street From Seminary Dr. to 300' South
of Gambrell Avenue 36'-40' 60' +1
6 Park Hill Drive From Stadium Drive to Wabash Ave. 30' 60' E
7 Mississippi Ave. From E. Berry south 180' 40' 55'
Based on the low bid, approximately $12,990.20 will be assessed against abutt-
ing property owners. The cost to the city-at-large will be approximately
$84,141.67, including engineering and miscellaneous expenses.
The following recommendations are made:
1. That an ordinance be adopted:
a) Declaring the necessity for and ordering the improvements on
the streets as specified above;
b) Making provisions for the levying of assessments;
c) Directing the Public Works Department to prepare estimates
of cost and amounts proposed to be assessed;
d) Awarding the contract to W. E., Brittain, Inc., on its low
bid of $88,301.70, for improvements in the project named
above.
DATE REFERENCE SUBJECT: Reconstruction of Gravel Base PAGE
NUMBER Streets at Seven Locations, Project
8/24/64 C-363 No. 094-27000-115 (Contract Am4) 2 °f 2
2. That an ordinance be adopted:
a) Approving the estimates of cost and amcunts proposed
to be assessed;
b) Setting September 14, 1964, as the date of the Benefit
Hearing.
3. That the following Bond Fund Transfer; be approved:
AMC",NT FROM TO FOR
$12,990.20 Revolving Fund 042-09427-115 Recon- Property owners portion
struction at Seven of construction cost.
Locations in the City
of Fort Worth.
+ Funds are available in Project No. 094-27000-115, Reconstruction at Seven Lo-
cations for the City's portion of construction, engineering and miscellaneous
costs.
TL,B:GA
Th+ following summaries are attached:
Attachment "A" - Resume of the Project and summary of
the Neighborhood Hearing.
Attachment "B" - Distribution of cost and results of
post card survey.
Attachment "C" - Assessment rolls in alphabetical order.
OFFICIAL RzCORD
CITY SECRET.?RY
fT. ENORTN, TES.
SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY
❑ APPROVED ❑ OTHER (DESCRIBE)
CITY SECRETARY
DATE
i
CITY MANAGER