Loading...
HomeMy WebLinkAboutContract 37801COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No, 31 WHEREAS, Sovereign Bank hereinafter called "Developer", desires to make certain improvements to Sovereign Bank situated in KM Van Zandts 2°a Addition, Lot i 8R, Blk 10, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. Project Name —Sovereign Bank @ W 7th CFA Number-2008034; DOE 6037 cIrY sECR�TA�r FT. WORT", TX 12008 F G I J K. L The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to Project Name — Sovereign Bank @ W 7th 2 Date — Oct 1, 2008 'FA Number — 2008034; DOE 6037 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) None; Street Lights and Signs (C) None.. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developers) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B. shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $ 26,639.92 Project Name — Sovereign Bank @ W 7th j CFA Number-2008034; DOE6037 Date —Oct 1, 2008 Project Name Sovereign Bank CFA 2008-034 DOE 6037 Item Developer Cost City Cost Total Cost A. Construction 1. Streets $ 25,132,00 $ 25,132.00 2, Storm Drainage 3. Street Lights 4. Street Name Signs B. Engineering Design C. Construction Engineering and Management by DOE 4% $ 11005,28 $ 11005,28 D. Materials Testing by DOE (2%) $ 502.64 $ 502.64 TOTALS $ 26,639,92 $ 26,639,92 $ 31,415.00 125% Cash or Letter of Credit Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. Project Name —Sovereign Bank @ W 7th 4 CFA Number — 2008034; DOE 6037 Date —Oct 1, 2008 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the q day of ti 2008. Approval Recommended: ATTEST: A MaVy Hendrix City Secretary Approve�a� to Form: As`sistant�ty,�ttorney ATTEST: Corporate Secretary Project Name —Sovereign Bank @ W 7th CFA Number-2008034; DOE 6037 5 Transportation and Public Worlcs Cit of Fort Worth // Fernando Costa Assistant City Manager DEVELOPER: Sovereign Bank 17950 Preston Rd, Suite 500 Dallas, TX 75252 By: Roy JFiS�lley, CE JV EREIGN, 15AN K Corporate Certification To Whom It May Concern: As Corporate Secretary for Sovereign :Ban.%,. I, R. Michael Russell, hereby certify that toy,J. Salley is Chairman of the Board of the Bank. Per the Bank's bylaws: 8.2 Fxecuivn of Instyirments: All agreements, indentures; mortgages, deeds, conveyances, transfers, certificates, declarations, receipts, discharges, releases, satisfactions, settlements, petitionsi schedules, accounts, affidavits, bonds, undertakings, proxies and other instruments or documents may be signed, executed, acknowledged, verified, delivered or accepted on behalf of the Bank by the chairperson of the Board, or the president, or any vice president, or the secretary, or the cashier, or, if in connection with exercise of fiduciary powers of the company, by any of those officers or by any trust officer. Any such instruments may also be executed, acknowledged, verified, delivered, or accepted on behalf of the Bank in such other manner and by such other officers as the Board may from time to time direct. The provisions of this Section 8.2 are supplementary to any other provision of these Bylaws. Sincerely, Aj,y./ R. Michael. Russell Secretary and CFO Go�orate Sea] 17g50 Preston Road Suite 500 Da(las. Texas 7525.2 ph. 214:2A2:1900 www.hank:��vereir�n.c.nm G7 z W D z z, (�l CD Q O0 CD u_. (D � -(,o c) = N O O 0 O C- N IT1 O n O O z 0 0 o mm n �< C �mm D )� Z XON �z WEST 6th STREET c� EX 31' B-B PVMT < n m0 Dz C) m EX 16' PVMT � K C) 5�> o<< C �amm CO D m xz o� WEST 7th STREET o cn o m EX 76' B-B PVMT ? 0 m 0 m Opinion of Probale Cost DATE: 9/2/2008 JOB NO.: 2008.112*000 OWNER: SOVEREIGN BANK PROJECT: SOVEREIGN BANK: EXHIBIT B - STREETS PREPARED: TS CHECKED BY: SHEET NO.: 2 6300 Ridglea Place, Ste 700 Fort Worth, Texas 76116 Tel: 817-338-1277 Fax: 817-338-9245 E-Mail: mail@bhbinc.com U;Finton of Pro a le Cost DATE: 7/28/2008 BHB JOB NO.: 2008.1 12.000 owNER: SOVEREIGN BANK PROJECT: SOVEREIGN BANK Project Components Consultant's Engineers Opinion of Probable City Participation Anticipated? Water $0.00 N Sewer $0.00 N Paving & Drainage $25,132.00 N Total $25,132.00