HomeMy WebLinkAboutContract 37864AMENDMENT STATE OF TEXAS § CITY SECRETARY CONTRACT NO. 7 (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and DMJM Aviation, Inc (Engineer) made and entered into City Secretary Contract No. 36316 (the Contract) which was authorized by the City Council by M&C C- 22531 on the 27th day of November, 2007; and WHEREAS, the Contract involves engineering services for the following project: Engineering Service For: Phase 6 Under On -Call Engineering Services Contract for Design of Airfield Signs, Airport Beacon Relocation, Airfield Lighting Control and Monitoring System and Construction Phase Services for Projects at Fort Worth Alliance Airport, Contract No. 36316. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated August 25, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $ 23,860.50. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $147,368,55, 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED on this the day of Fort Worth, Tarrant County, Texas, APPROVAL RECOMMENDED: 'Otfee•� PM�o p�pw� l DMJM Aviation, Inc. ENGINEER By: Nan Chief Administrative Officer it V!c{ resi"A�j APPROVED AS TO FO Amy F�amse % / Assistant City Attorney LEGALITY: APPROVED: Assistant City Manager ATTEST: Marty 2000. in City Secretary August 255 2008 Mr. Gopal Sahu, P.E. Project Manager City of Fort Worth Engineering Department Consultant Services 1000 Throckmorton Street Fort Worth, Texas 76102 Re: General Engineering Consultant Services For Design of Electrical Improvements Dear Mr. Sahu: The attached man hour summary outlines our fee proposal for additional engineering services related to the Phase 6 On -Call Engineering Services Contract for Design of Electrical Improvements at Fort Worth Alliance Airport. We propose an increase in the Design Phase Services Fee $23,860.50. The increase in the Design Phase Services is for: A. Additional work associated with the relocation of Airport Beacon. Additional Design Phase Services Fee requested is $8,370.50. B. Additional work associated with the addition of a fiber optic cable between the existing electrical vault and the control tower. Additional Design Services Fee requested is $5,700.00. C. Additional work associated with the addition of 20 airfield guidance signs to the contract. The 20 airfield signs are to be upgraded. Additional Design Services Fee is $9,790.00. If you have any questions or comments, please do not hesitate to contact me. Sincerely, Tames G. Kirschbaum, P.E. JGK:IIg Cc: File 0 0 N m E E 3 Ln � C O O O O a wp C acuM — O O N J 3� CL Li Q Li 0 0 0 0 0 0 0 0 0 0 0 00 N O O O O O O O O O coN N O O N Cl EA --� I-- 69 ER 69 Efl 6 Vi U M E c�a a: c o ~ n m J H U fa O J V N N 06 _ 46 X N N f0 o E (0 E LO — E LO 3 O W (p N mo w X m 'O a) 0.c O 7 c c (D N � r Q N N @ > c co ` U O 0 C N O OU Y E J F' N 00 N 7 LL U' E J ` (d c 0 co ¢ N U Q N U c n N J LUrp .. (`7 O LL c mc 7 C O fn 7 U N J (0 — N N N (n U p C O j N cl J n > > x 0 U) W U) N M V L� lD N � O � C C O � •� � Ul �- a '� W m a W m 0 0 0 0 0 0 0 0 0 0 0 0 6111 N CD lual 0 N 10,311 co 69 Efl N A U 0 0 0 0 0 0 N (06 co N N � 60> Qcl� U)- a� v 0 0 0 0 0 0 O O O O O o O N 0 4 d' O N N N r- N L O c .0 O c ] U � `m o o> N E 0 0 0 0 0 0 0 0 0 0 0 0 O N U N H? D- �4 O U OOu)ooO m o(0000q,�t 4d vu66ou500C) in x w 91t � N O � �O :w C rtS �7y V eaQQaQ �wwwww U) if 0 a �od � c N 0 'L O O V 0 U � c U c p o(�� � 'C w 0) 0) a 0 0 c c c c wa�n`02 Fort Worth Alliance Airport Beacon Relocation Fee Estimate and Man-hour Summary Date: August 8, 2008 DMJM AVIATION ID ACTIVITY NAME Project Principal Project Manager Senior Engineer Engineer Technician Clerical Total Hours per task 1.0 Project Man agement/MisceIlaneous 1.1 Design Coordination Meetings 4 4 1 9 1.2 QA Reviews 2 8 1 11 1.3 Civil Design Drawings 1.3,1 Beacon Location & Site Plan 2 1 4 24 1 32 1,3,2 Erosion Control Plan & Details 2 1 4 24 1 32 1.3,3 Demolition Plan 2 1 4 24 1 32 1.3,4 Paving & Grading Plan 2 1 4 24 1 32 1.3,5 Pavement & Foundation Details 2 1 12 24 1 40 1.3.6 Security Fence Layout 2 1 4 24 1 32 1.3.7 Security Fence Details 2 1 4 16 1 24 1,3.8 Notes 2 1 1 4 10 1 18 TOTAL HOURS 0 22 20 4 24 10 80 Ferguson Consuiting Consultants in Electrical and Telecommunications Engineering July 21, 2008 Larry Gaines, P.E. DMJM Aviation 1200 Summit Avenue, Suite #320 Ft Worth, TX 76102-4409 Re: Alliance Airport — ALRCS Additional Services Dear Mr. Gaines: This letter is for additional electrical engineering services for the Alliance Airport Signage project. These services include designing a fiber optic cable for the airfield lighting remote control system. This design assumes that there is existing pathway for routing of the new cable. The services will include preparing contract drawings and specifications for the new fiber optic cable and providing construction administration services. Ferguson Consulting, Inc will perform the above mentioned scope items for a lump sum fee not to exceed $59700.00 (Five thousand seven hundred dollars and no/100). A breakdown follows: Task Hours Cost Fiber Cable Route 40 $ 4,400.00 CA Services 10 $ 11100000 Expenses $ 200.00 Total 89 $ 51700.00 If you need any additional information or have further questions, please call me at (281) 252-9232. l�er�=us��n C'on��illin�>37602 `I'ournvnent Lane> 1�'[agnolia, Tt'%P1S �i3b5 (231) `�52-9;?32 ��h (251) 2G'?-535:i tax Yours truly, FERGUSON CONSULTING, INC. Lecette Ferguson, PE, RCDD President h'c�r;;uson Con�ulYiilg 3i(i0`?'1'ou�•namEnl, L,��nc� 1��[a�nolia, Texas iT355 Forg►uson Consulting Consultants in Electrical and Telecommunications Engineering July 21, 2008 Larry Gaines, P.E. DMJM Aviation 1200 Summit Avenue, Suite #320 Ft Worth, TX 761024409 Re: Alliance Airport -Signage Dear Mr. Gaines: This letter is for additional electrical engineering services for the Alliance Airport Signage project. These services include designing an additional twenty-three (23) signs and merging the two signage packages into a single package. The services will include preparing contract drawings and specifications for additional signs and providing construction administration services. There are no additional expenses or bidding services anticipated. Ferguson Consulting, Inc will perform the above mentioned scope items for a lump sum fee not to exceed $91790.00 (Nine thousand seven hundred ninety dollars and no/100). A breakdown follows: Task Hours Cost Additional Signs 55 $ 6,050.00 Additional CA Services 14 $ 1,540.00 Signage Package 20 $ 2,200.00 Total 89 $ 9,790.00 If you need any additional information or have further questions, please call me at (281) 252-9232. 1+erguson Consulting 37G02'1'ournament: Lane Magnolia, TExas ii355 (28l) `?52-9`?32 hh (2£�l) 25L-535ti fas Yours truly, FERGUSON CONSULTING, INC. Lecette Ferguson, PE, RCDD President f�'er�;uson Consulting 31G0L'Pournament I,ane� Magnolia, `Texas ii355 �281) 2t�2-923`L l�h (281) 252-5365 fax