HomeMy WebLinkAboutOrdinance 5633 ORDINANCE NO. AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF CURZON AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets,avenues and public places in the City of Fort Worth, Texas, be im- proved by raising,grading and filling same and by constructing thereon the following,to-wit: 1. CURZON AVENUE: From the East line of Lackland Road to the West line of Sappington Place, known and designated as Unit 1, Project No. 104 -24000-151, ._a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 2. CURZON AVENUE: From the East line of Sappington Place to the West line of Olive place, known and designated as Unit 2, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 3. BOURINE STREET: From the North line of Libbey Avenue to the South line of Goodman Avenue, known and designated as Unit 3, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 4. PREVOST STREET: From the South line of Humbert Avenue to the South line of Blackmore Avenue, known and designated as Unit 4, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 5. PREVOST STREET: From the South line of Blackmore Avenue to the South line of Libbey Avenue, known and designated as Unit 5, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 6. PREVOST STREET: From the North line of Libbey Avenue to the South line of Goodman Avenue, known and designated as Unit 6, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 7. PREVOST STREET: From the North line of Goodman Avenue to the South line of Kilpatrick Avenue, known and designated as Unit 7, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement onra 30' roadway. 8 PREVOST STREET: From the North line of Kilpatrick Avenue to the South line of B©nnell Avenue, known and designated as Unit 8, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 9. HUMBERT AVENUE: From the East line of Merrick Street to the West line of Neville Street, known and designated as Unit 9, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 36' roadway. 10. HERVIE STREET: From the North line of Bonnell Avenue to the South line of Fletcher Avenue, known and designated as Unit 10, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 11. HERVIE STREET: From the North' line of Lovell Avenue to the South line of Locke Avenue, known and designated as Unit 11, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a ,30' roadway. 12. HERVIE STREET: From the North line of Locke Avenue to the South line of Service Road East-West Freeway, known and designated as Unit 12, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 13. NEVILLE STREET: From the North line of Collinwood Avenue to 125' North of Byers Avenue, known and designated as Unit 13, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. 14. BRYCE AVENUE: From the east line of Hulen Street to the West line of Western Avenue, known and designated as Unit 14, Project No. 104-24000-151, a 6-inch hot-mix asphaltic concrete pavement on a 30' roadway. together with combined concrete curbs and gutters on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said improvements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; and contract therefor has been made and entered into with SRO ASPHALT, INC. _; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amounts per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been ex- amined. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of street,avenue and public place hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting property and the owners thereof, are as follows, to-wit: CURZON AVENUE: From the East line of Lackland Road to the West line of Sappington Place, known and designated as Unit 1, Project No. 104-24000-151. The estimated cost of improvements is $ 5,343.80 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $-4-59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 _ _, CURZON AVENUE: From the East line of Sappington Place to the West line of Olive Place, known and designated as Unit 2, Project No. 104-24000-151. The estimated cost of improvements is $ 5212.79 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 BOURINE STREET: From the North line of Libbey Avenue to the South line of Goddman Avenue, known and designated as Unit 3, Project No. 104-24000-151. The estimated cost of improvements is $ 3R20.nq ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.0$ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 PREVOST STREET: From the South line of Humbert Avenue to the South line of Blackmore Avenue, known and designated as Unit 4, Project No. 104-24000-151. The estimated cost of improvements is $ 4,998.95 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 • the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 PREVOST STREET: From the South line of Blackmore Avenue to the South line of Libbey Avenue, known and designated as Unit 5, Project No, 104-24000-151. The estimated cost of improvements is $— 4,980.53 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 ; the estimated amount per front foot to be assessed alrainst abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.59 the total estiVgl amount per front foot to be assessed against abutting property and the owners thereof is $ PREVOST STREET: From the North line of Libbey Avenue to the South line of Goodman Avenue, known and designated as Unit 6, Project No. 104-24000-151. The estimated cost of improvements is $ 3,905.44 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 PREVOST STREET: From the North line of Goodman Avenue to the South line of Kilpatrick Avenue, known and designated as Unit 7, Project No. 104-24000-151. The estimated cost of improvements is $ 4,004.33 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $_ 2.08 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $-4.59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 PREVOST STREET: From the North line of Kilpatrick Avenue to the South line of Bonnell Avenue, known and designated as Unit 8, Project No. 104-24000-151. The estimated cost of improvements is $ 3.966.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ .6.67 HUMBERT AVENUE: From the East line of Merrick Street to the West line of Neville Street, known and designated as Unit 9, Project No. 104-24000-151. The estimated cost of improvements is $ 9,735.82 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.14 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $_5.50 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 7.64 HERVIE STREET: From the North line of Bonnell Avenue to the South line of Fletcher Avenue, known and designated as Unit 10, Project No. 104-24000-151. The estimated cost of improvements is $ 4,153 60 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $— 4.59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 HERVIE STREET: From the North line of Lovell Avenue to the South line of Locke Avenue, known and designated as Unit 11, Project No. 104-24000-151. The estimated cost of improvements is $ 4,191.00 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ A.59 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 RERVIE STREET: From the North line of Locke Avenue to the South line of Service Road East-West Freeway, known and designated as Unit 12, Project No. 104-24000-151. The estimated cost of improvements is $ 3,406.43 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.08 the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.67 NEVILLE STREET: From the North line of Collinwood Avenue to 125' North of Byers Avenue, known and designated as Unit 13, Project No. 104-24000-151. The estimated cost of improvements is $_ --5,628.97 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is$ 2.08 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ A-59 the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6,67 BRYCE AVENUE: From the East line of Hulen Street to the West line of Western Avenue, known and designated as Unit 14, Project No. 104-24000-151. The estimated cost of improvements is $___4,525.67 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $_ 2*14 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.49 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.63 III. A hearing be given and held by and before the City Council of the City of Fort Worth,Texas,to all own- ing or claiming any property abutting upon said portions of streets,avenues and public places,as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on theme—day of September 19 66, at 9:30 a.m. , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Ses- sion, now benig shown as Article 1105b of Vernon's Texas Civil Statutes.Such notice shall be by advertisement at least three times in a newspaper published in the City of Fort Worth,Texas,the first publication to be made at least ten days before the date of said hearing.Said notice shall comply with and be in accordance with the terms and provisions of said Act. The City Secretary is further directed to give personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of streets,avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be given by the City Secretary mailing said notice postage prepaid, to the respective owners of record of the properties to be assessed, and to any person owning or claiming any interest in said properties, to the last known address of said owner or persons. It shall not be necessary for the City Secretary to mail said notices to any owner or other person claiming an interest in the property to be assessed when the addess of such owner or other person claiming an interest in the property to be assessed is unknown to the City Secretary and cannot. be determined by the City Secretary after reasonable investigation. In this connection the City Secretary shall prepare and file with these proceedings a list of the properties to be assessed, the names of.those persons own- ing or claiming any interest in said properties to whom the notice was mailed, together with the last known address of the respective owners and those persons owning or.claiming any interest in said property. The-City Secretary shall certify that each of the parties named in said list whose address was known to him, was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of the notice shall be attached to such certificate. The certificate of the City Secretary will be conclusive evidence of the facts therein recited. Failure of the City Secretary to give notice of hearing by mail as herein provided for, or failure of the owners or other persons interested to receive said notice,shall in nowise invalidate said hearing or any assessments levied pursuant to said hearing, but notice of hearing shall be sufficient, valid and binding upon all owning or claiming such abutting property or.any interest therein when same shall have been given by newspaper advertisement as first hereinabove provided. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and a in full force and effect fro and after the date of its passage. Passed and approved this_��... .___ ay of—_ APPROVED AS TO FORM AND LEGALITY: T _ City Attorney_-- w '- gRO�NNIF.B City of Fort Worth, Texas M�Mp,1.1AN Mayor and Council Communication moo" DATE REFERENCE SUBJECT: Assessment Paving in Arlington PAGE NUMBER Heights, Project No. 4-151 R 8 22 66 C-777 1 or 2 Council action on the project described below is requested: Projects Description Nature of work: Assessment Paving at 14 Locations in the Arlington Heights Area, as follows: Roadway Unit Street Limits Width R.O.W. 1 Curzon Avenue Lackland Road to Sappington Place 30 feet 50 feet 2 Curzon Avenue Sappington Place to Olive Place 30 feet 50 feet 3 Bourine Street Libbey Avenue to Goodman Avenue 30 feet 60 feet 4 Prevost Street Humbert Avenue to Blackmore Avenue 30 feet 60 feet 5 Prevost Street Blackmore Avenue to Libbey Avenue 30 feet 60 feet 6 Prevost Street Libbey Avenue to Goodman Avenue 30 feet 60 feet 7 Prevost Street Goodman Avenue to Kilpatrick Avenue 30 feet 60 feet 8 Prevost Street Kilpatrick Avenue to Bonnell Avenue 30 feet 60 feet 9 Humbert Avenue Merrick Street to Neville Street 36 feet 80 feet 10 Hervie Street Bonnell Avenue to Fletcher Avenue 30 feet 60 feet 11 Hervie Street Lovell Avenue to Locke Avenue 30 feet 60 feet 12 Hervie Street Locke Avenue to Service Road East- West Freeway 30 feet 60 feet 13 Neville Street Collinwood Avenue to 125' N. of Byers 30 feet 60 feet 14 Bryce Avenue Hulen Street to Western Street 30 feet 80 feet Petitions have been received to pave the above streets except for Unit 1, Curzon Avenue, which was initiated by the City to provide continuous pav- ing and improve traffic circulation in the area. Submission of Bids Bidder Amount Bid Working Days S.R.O. Asphalt, Inc. $61,703.60 75 General Construction Company 62,584.25 75 Texas Bitulithic Company 64,865.75 75 Glade Construction Company 65,667.12 75 Worth Construction Company 66,911.15 75 R. W. Gibbins, Inc. 67,920.25 75 ;Project Cost and Financing The overall project cost, including engineering and miscellaneous expenses, will be $67,837.96. Based on the low bid, approxima 11 be assessed against abutting property owners. The c %FI0I&eRFRRRiIa - large will be approximately $28,140.09. CITY SECRETARY L. FT. WORTH, TEX. DATE REFERENCE SUBJECT: Assessment Paving in Arlington PAGE NUMBER Heights, Project No. 4-151 2 8/22/66 C-777 I of e ommendations 1) That the following bond fund transfers be approved: Amount From To Purpose $39,733.87 Revolving Fund 14 Locations - Arlington Property owners ' por- Heights 104-24000-151 tion of construction cost $28,140.09 Unspecified 14 Locations - Arlington. City's portion of con - 104-24000-901 Heights 104-24000-151 struction and engineer ing cost. 2) That an ordinance be adopted: a. Declaring the necessity for and ordering the improvements; b. Making provisions for levying of assessments; c. Ordering the Public Works Department to prepare estimates of costs and amounts proposed to be assessed; d. Awarding the contract to SRO Asphalt, Inc. , on its low bid of i $61,703.60; and e. Making appropriations to cover the indebtedness thereby incurred for improvements to the project named above. 3) That an ordinance be adopted: a. Approving the estimates of cost and amounts proposed to be assessed; and b. Setting September 6, 1966, as the date of the Benefit Hearing. OFFICIAL RECOOp JLB:lp The following summaries are attached: CM SECRETARY "A" - Resume of the project IT. WORT# TEX "B" - Distribution of cost and assessments, and results of Post Card Survey "C" - Assessment Rolls in alphabetical order SUBMITTED BY: DISPO T N BY COUNCIL: PROCESSED RV APPROVED ❑ OTHER (DESCRIBE) CITY SECRETARY DATE /ITYANAGER