Loading...
HomeMy WebLinkAboutOrdinance 5835 ORDINANCE NO. � AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF WEST BLUFF STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth,Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: 1. WEST BLUFF STREET From the east line of Purcey Street to the west-line of Lexington Street, known and designated as Unit 1, Project No. 104-24000- 174, a 6 inch Hot-Mix Asphaltic Concrete Pavement on a 30 foot roadway. 2. PEACH STREET From the east line of Purcey Street to the west line of Henderson Street, known and designated as Unit 2, Project No. 104-24000- 174, a 6 inch Hot-4kix Asphaltic Concrete Pavement on a 30 foot roadway. 3. LEXINGTON STREET From the north line of West Bluff Street to the south line of Peach Street, known and designated as Unit 3, Project No. 104-24000- 174, a 6 inch Hot-Mix Asphaltic Concrete Pavement on a 30 foot roadway. 4. LEXINGTON STREET From the north line of Peach Street to the south line of Valley Street, known and designated as Unit 4, Project No. 104-24000- 174, a 6 inch Hot-Mix Asphaltic Concrete Pavement on a 30 foot roadway. 5. MILIS STREET From the north line of West Bluff Street to the south line of Peach Street, known and designated as Unit 5, Project No. 104-24000- 174, a 6 inch Hot-Mix Asphaltic Concrete Pavement on a 30 foot roadway. 6. miu-s STREET From the north line of Peach Street to the south line of Valley Street, known and designated as Unit 6, Project No. 104-24000- 174, a 6 inch Hot-Mix Asphaltic Concrete Pavement on a 30 foot roadway. 7. WOODWARD STREET From the north line of Franklin Street to the south line of Calvert Street, known and designated as Unit 7, Project No. 104-24000- 174, a 6 inch Hot-Mix Asphaltic Concrete Pavement on a 30 foot roadway. together with combined concrete curbs and gutters on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said improvements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; and contract therefor has been made and entered into with AUSTIN ROAD & WORTH CONSTRUCTION CO. ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amounts per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been ex- amined. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of street,avenue and public place hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting property and the owners thereof, are as follows, to-wit: WEST BLUFF STREET From the east line of Purcey Street to the west line of Lexington Street, known and designated as Unit 1, Project No. 104-24000-174. The estimated cost of improvements is $—5,5 9.50 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2•02 • the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $— 4.24 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.22 PEACH STREET From the east line of Purcey Street to the west line of Henderson Street, known and designated as Unit 2, Project No. 104-24000-174. The estimated cost of improvements is $_ 12s 940.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2. 2 • the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.20 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.22 LEXINGTON STREET From the north line of West Bluff Street to the south line of Peach Street, known and designated as Unit 3, Project No. 104-24000-174- The estimated cost of improvements is $ 3,486.15 ; the estimated amount per front foot to be assestV against abutting property and the owners thereof for combined concrete curb and gutter is $_2• ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4•20 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.22 LEXINGTON STREET From the north line of Peach Street to the south line of Valley Street, known and designated as Unit 4, Project No. 104-24000-174. The estimated cost of improvements is $ 3,9086.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.02; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.20 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.22 MILLS STREET From the north line of West Bluff Street to the south line of Peach Street, known and designated as Unit 5, Project No. 104-24000-174. The estimated cost of improvements is $ 3,110.70 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.02__—; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $4020 ; the total estimated amount per front foot to be assessed against abutting property and the pwners thereof is $ 6.22 MILLS STREET From the north line of Peach Street to the south line of Valley Street, known and designated as Unit 6, Project No. 104-24000-174. The estimated cost of improvements is $ 3,062:25 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2.02 —; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4,20 ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 6.22 WOODWARD STREET From the north line of Franklin Street to the south line of Calvert Street, known and designated as Unit 7, Project No. 104-24000-174. The estimated cost of improvements is $ 8,5558.65 the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ 2•©1 • the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ 4.20. ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ b.zl The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ The estimated cost of improvements is $ -- ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ ; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for combined concrete curb and gutter is$ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for improvements exclusive of curb and gutter is $ the total estimated amount per front foot to be assessed against abutting property and the owners thereof is III. A hearing be given and held by and before the City Council of the City of Fort Worth,Texas,to all own- ing or claiming any property abutting upon said portions of streets,avenues and public places,as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 18'44day of September , 19 67 , at. 9:30 A•K• , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Ses- sion, now benig shown as Article 1105b of Vernon's Texas Civil Statutes.Such notice shall be by advertisement at least three times in a newspaper published in the City of Fort Worth,Texas,the first publication to be made at least ten days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act. The City Secretary is further directed to"give personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of streets,avenues and public places,as well as to all owning or claiming any interest in any such property. Such personal notice shall be given by the City Secretary mailing said notice postage prepaid, to the respective owners of record of the properties to be assessed, and to any person owning or claiming any interest in said properties,to the last known address of said owner or persons. It shall not be necessary for the City Secretary to mail said notices to any owner or other person claiming an interest in the property to be assessed when the addess of-such owner or other person claiming an interest in the property to be assessed is unknown to the City Secretary and cannot be determined by the City Secretary after reasonable investigation. In this connection the City Secretary shall prepare and file with these proceedings a list of the properties to be assessed, the names of those persons own- ing or claiming any interest in said properties to whom the notice was mailed, together with the last known address of the respective owners and those persons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties named in said list whose address was known to him, was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of the notice shall be attached to such certificate, The certificate of the City Secretary will be conclusive evidence of the facts therein recited. Failure of the City Secretary to give notice of hearing by mail as herein provided for, or failure of the owners or other persons interested to receive said notice,shall in nowise invalidate said hearing or any assessments levied pursuant to said hearing, but notice of hearing shall be sufficient, valid and binding upon all owning or claiming such abutting property or any interest therein when same shall have been given by newspaper advertisement as first hereinabove provided. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this_--7 _day of__ APPROVED AS TO FORM AND LEGALITY: City Attorney A City of Fort Worth, Texas MCMAM" LINE Mayor and Council Communication MoRP"►= C1. DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER Paving at Seven Locations R I 2 8/21/67 C-1038 Downtown Council action on the project described below is requested. Proiect Description Nature of work: Assessment Paving of Seven Locations Downtown. Roadway Unit Street Limits Width R.O.W. 1 W. Bluff Street Purcey to Lexington 30 feet 50 feet 2 Peach Street Purcey to Henderson 30 feet 50 feet 3 Lexington Street W. Bluff to Peach 30 feet 40 feet 4 Lexington Street Peach to Valley Street 30 feet 40 feet 5 Mills Street W. Bluff to Peach Street 30 feet 50 feet 6 Mills Street Peach Street to Valley 30 feet 50 feet 7 Woodward Street Franklin to Calvert 30 feet 50 feet Petitions were received for the paving of Units 4 & 6. Units 1, 2, 3 and 5 were initiated by the City to provide for continuous paving within the area. Unit 7 was initiated in conjunction with the Fire and Police Training Center construction project to provide.a paved access to the Jacksboro Highway. Bidder Amount of Bid Working Days Austin Road & Worth Construction Co. $39,813.95 52 Texas Bitulithic Company 41,239.40 52 S.R.O. Asphalt, Inc., Arlington 42,987.25 52 General Construction Company 46,131.90 52 R. W. Gibbins & Gibbins Construction Co. 47,258.25 52 Proiect Cost and Financing Based on the low bid approximately $26,278.17 will be paid by abutting property owners. The cost to the city-at-large will be approximately $17,517.18 in- cluding engineering and miscellaneous expenses. Recommendations It is recommended: OFFICIAL RECORD 1) That the following bond fund transfer be made: CITY sEmIRRY 0. N ORTH, 19 a DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER Paving at Seven Locations 2 2 8/21/67 C-1038 Downtown of Amount From To Purpose $26,278.17 Revolving Fund 042-10424-174 Property owners ' portion of construction cost. $17,517.18 Unspecified 7 Locations Downtown City's portion of con- 104-24000-901 Proj. No. 104-24000-174 struction and engineering 2) That an ordinance be adopted: a) Declaring the necessity for and ordering improvements. b) Making provisions for levying of assessments. c) Ordering Public Works Department to prepare estimate of cost and amounts proposed to be assessed. d) Awarding the Contract to Austin Road & Worth Construction on its low bid of $39,813.95 and, e) Making appropriations to cover the indebtedness thereby incurred for improvements to the project named above. 3) That an ordinance be adopted: a) Approving the estimates of costs and amounts proposed to be assessed; and b) Setting September 18, 1967 as the date of the benefit hearing. :lp The following summaries are attached: "A" - Resume of paving project "B" - Distribution of costs and assessments and results of Poll Card Survey. OFFICIAL RECORD CITY USECRETARY ET. 14;►1st TEX, SUBMITTED BY: DISPOSI 10 COUNCIL: PROCESS D BY APPROVED OTHER (DESCRIBE) /"-- ffISECRETARY TE CITY MANAGER �+ � /