Loading...
HomeMy WebLinkAboutContract 38003 (2)CITY SECRETARY CITY OF FORT WORTH, TEXAS CONTRACT NO STANDARD AGREEMENT FOR ENGINEERING SERVICES This AGREEMENT is between the City of Fort Worth (the "CITY and Neel -Schaffer Inc, (the "ENGINEER"), for a PROJECT generally described as: GREENWAY PARK ROAD AND PARKING IMPROVEMENTS Article I Scope of Services A. The Scope of Services is set forth in Attachment A. Article II Compensation A. The ENGINEER's compensation is set forth in Attachment B. Article III Terms of Payment Payments to the ENGINEER will be made as follows: A. Invoice and Payment (1) The Engineer shall provide the City sufficient documentation to reasonably substantiate the invoices. (2) The ENGINEER will issue monthly invoices for all work performed under this AGREEMENT. Invoices are due and payable within 30 days of receipt. (3) Upon completion of services enumerated in Article I, the final payment of any balance will be due within 30 days of receipt of the final invoice. (4) In the event of a disputed or contested billing, only that portion on contested will be withheld from payment, and the undisputed portion will be paid. The CITY will exercise reasonableness in contesting any bill or portion thereof. No interest will accrue on any contested portion of the billing until mutually resolved. (5) If the CITY fails to make payment in full to ENGINEER for billings contested in good faith within 60 days of the amount due, the ENGINEER may, after giving 7 days' written notice to CITY, suspend services under this AGREEMENT until paid in full, including interest. In the event of suspension of services, the ENGINEER shall have no liability to CITY for delays or damages caused the STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 1 of 14 CITY because of such suspension of services. Article IV Obligations of the Engineer Amendments to Article IV, if any, are included in Attachment C. A. General The ENGINEER will serve as the CITY's professional engineering representative under this Agreement, providing professional engineering consultation and advice and furnishing customary services incidental thereto. B. Standard of Care The standard of care applicable to the ENGINEER's services will be the degree of skill and diligence normally employed in the State of Texas by professional engineers or consultants performing the same or similar services at the time such services are performed. C. Subsurface Investigations (1) The ENGINEER shall advise the CITY with regard to the necessity for subcontract work such as special surveys, tests, test borings, or other subsurface investigations in connection with design and engineering work to be performed hereunder. The ENGINEER shall also advise the CITY concerning the results of same. Such surveys, tests, and investigations shall be furnished by the CITY, unless otherwise specified in Attachment A. (2) In soils, foundation, groundwater, and other subsurface investigations, the actual characteristics may vary significantly between successive test points and sample intervals and at locations other than where observations, exploration, and investigations have been made. Because of the inherent uncertainties in subsurface evaluations, changed or unanticipated underground conditions may occur that could affect the total PROJECT cost and/or execution. These conditions and cost/execution effects are not the responsibility of the ENGINEER. D. Preparation of Engineering Drawings The ENGINEER will provide to the CITY the original drawings of all plans in ink on reproducible plastic film sheets, or as otherwise approved by CITY, which shall become the property of the CITY. CITY may use such drawings in any manner it desires; provided, however, that the ENGINEER shall not be liable for the use of such drawings for any project other than the PROJECT described herein. STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 2 of 14 (1) The presence or duties of the ENGINEER'S personnel at a construction site, whether as on -site representatives or otherwise, do not make the ENGINEER or its personnel in any way responsible for those duties that belong to the CITY and/or the CITY's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The ENGINEER and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. (2) Except to the extent of specific site visits expressly detailed and set forth in Attachment A, the ENGINEER or its personnel shall have no obligation or responsibility to visit the construction site to become familiar with the progress or quality of the completed work on the PROJECT or to determine, in general, if the work on the PROJECT is being performed in a manner indicating that the PROJECT, when completed, will be in accordance with the Contract Documents, nor shall anything in the Contract Documents or the agreement between CITY and ENGINEER be construed as requiring ENGINEER to make exhaustive or continuous on -site inspections to discover latent defects in the worK or otherwise check the quality or quantity of the worK on the PROJEC I . If, for any reason, the ENGINEER should make an on -site observation(s), on the basis of such on -site observations, if any, the ENGINEER shall endeavor to keep the CITY informed of any deviation from the Contract Documents coming to the actual notice of ENGINEER regarding the PROJECT. (3) When professional certification of performance or characteristics of materials, systems or equipment is reasonably required to perform the services set forth in the Scope of Services, the ENGINEER shall be entitled to rely upon such certification to establish materials, systems or equipment and performance criteria to be required in the Contract Documents. F. Opinions of Probable Cost, Financial Considerations, and Schedules (1) The ENGINEER shall provide opinions of probable costs based on the current available information at the time of preparation, in accordance with Attachment A. (2) In providing opinions of cost, financial analyses, economic feasibility projections, and schedules for the PROJECT, the ENGINEER has no control over cost or price of labor and materials; unknown or latent conditions of existing equipment or structures that may affect operation or maintenance costs; competitive bidding procedures and market STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 3 of 14 conditions; time or quality of performance by third parties; quality, type, management, or direction of operating personnel; and other economic and operational factors that may materially affect the ultimate PROJECT cost or schedule. Therefore, the ENGINEER makes no warranty that the CITY's actual PROJECT costs, financial aspects, economic feasibility, or schedules will not vary from the ENGINEER's opinions, analyses, projections, or estimates. G. Construction Progress Payments Recommendations by the ENGINEER to the CITY for periodic construction progress payments to the construction contractor will be based on the ENGINEER's knowledge, information, and belief from selective sampling and observation that the work has progressed to the point indicated. Such recommendations do not represent that continuous or detailed examinations have been made by the ENGINEER to ascertain that the construction contractor has completed the work in exact accordance with the Contract Documents; that the final work will be acceptable in all respects; that the ENGINEER has made an examination to ascertain how or for what purpose the construction contractor has used the moneys paid; that title to any of the work, materials, or equipment has passed to the CITY free and clear of liens, claims, security interests, or encumbrances; or that there are not other matters at issue between the CITY and the construction contractor that affect the amount that should be paid. i-i. Record urawings Record drawings, if required, will be prepared, in part, on the basis of information compiled and furnished by others, and may not always represent the exact location, type of various components, or exact manner in which the PROJECT was finally constructed. The ENGINEER is not responsible for any errors or omissions in the information from others that is incorporated into the record drawings. I. Minority and Woman Business Enterprise (M/VVBE) Participation In accord with City of Fort Worth Ordinance No. 15530, the City has goals for the participation of minority business enterprises and woman business enterprises in City contracts. Engineer acknowledges the M/WBE goal established for this contract and its commitment to meet that goal. Any misrepresentation of facts (other than a negligent misrepresentation) and/or the commission of fraud by the Engineer may result in the termination of this agreement and debarment from participating in City contracts for a period of time of not less than three (3) years. J. Right to Audit (1) ENGINEER agrees that the CITY shall, until the expiration of three (3) years STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 4 of 14 after final payment under this contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of the ENGINEER involving transactions relating to this contract. ENGINEER agrees that the CITY shall have access during normal working hours to all necessary ENGINEER facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. The CITY shall give ENGINEER reasonable advance notice of intended audits. (2) ENGINEER further agrees to include in all its subconsultant agreements hereunder a provision to the effect that the subconsultant agrees that the CITY shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers and records of such subconsultant, involving transactions to the subcontract, and further, that the CITY shall have access during normal working hours to all subconsultant facilities, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with subsection (3)hereof. CITY shall give subcon-sultant reasonable advance notice of intended audits. (3) ENGINEER and subconsultant agree to photocopy such documents as may be requested by the CITY. The CITY agrees to reimburse ENGINEER for the cost of copies at the rate published in the Texas Administrative Code in effect as of the time copying is performed. K. ENGINEER°s Insurance (1) Insurance coverage and limits: ENGINEER shall provide to the City certificates) of insurance documenting policies of the following coverage at minimum limits that are to be in effect prior to commencement of work on the PROJECT: Commercial General Liability $1,000,000 each occurrence $2,000,000 aggregate Automobile Liability $1,000,000 each accident on a combined single limit or $2501000 Property Damage $500,000 Bodily Injury per person per occurrence A commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned when said vehicle is used in the STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 5 of 14 course of the PROJECT. Worker's Compensation Coverage A: Statutory limits Coverage B: Employer's Liability $100,000 each accident $500,000 disease - policy limit $100,000 disease - each employee Professional Liability $170001000 each claim $2,000,000 aggregate Professional liability shall be written on a claims -made basis and shall contain a retroactive date prior to the date of the contract or the first date of services to be performed, whichever is earlier. Coverage shall be maintained for a period of 5 years following the completion of the contract. An annual certificate of insurance specifically referencing this project shall be submitted to the City for each year following completion of the contract. (2) Certificates of insurance evidencing that the ENGINEER has obtained all required insurance shall be delivered to the CITY prior to ENGINEER proceeding vvith the PROJECT. (a) Applicable policies shall be endorsed to name the CITY an Additional Insured thereon, as its interests may appear. The term CITY shall include its employees, officers, officials, agents, and volunteers as respects the contracted services. (b) Certificate(s) of insurance shall document that insurance coverage specified in this agreement are provided under applicable policies documented thereon. (c) Any failure on part of the CITY to request required insurance documentation shall not constitute a waiver of the insurance requirements. (d) A minimum of forty-five (45) days notice of cancellation or material change in coverage shall be provided to the CITY. A ten (10) days notice shall be acceptable in the event of non-payment of premium. Such terms shall be endorsed onto ENGINEER's insurance policies. Notice shall be sent to the respective Department Director (by name), City of Fort Worth, 1000 Throckmorton, Fort Worth, Texas 76102. (e) Insurers for all policies must be authorized to do business in the State of STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 6 of 14 Texas and have a minimum rating of A: VII in the current A.M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. (f) Deductible limits, or self insured retentions, affecting insurance required herein shall be acceptable to the CITY in its sole discretion; and, in lieu of traditional insurance, any alternative coverage maintained through insurance pools or risk retention groups must be also approved. Dedicated financial resources or letters of credit may also be acceptable to the City. (g) Applicable policies shall each be endorsed with a waiver of subrogation in favor of the CITY as respects the PROJECT. (h) The City shall be entitled, upon its request and without incurring expense, to review the ENGINEER's insurance policies including endorsements thereto and, at the CITY's discretion, the ENGINEER may be required to provide proof of insurance premium payments. (i) The Commercial General Liability insurance policy shall have no exclusions by endorsements unless the CITY approves such exclusions in writing. (j) For all lines of coverage underwritten on a claims -made basis, other than Professional Liability, the retroactive date shall be coincident with or prior A the date of the contractual agreement. T he certificate of insurance shall state both the retroactive date and that the coverage is claims. made. (k) The CITY shall not be responsible for the direct payment of any insurance premiums required by this agreement and all insurance required in this section, with the exception of Professional Liability, shall be written on an occurrence basis. (I) Sub consultants and subcontractors to/of the ENGINEER shall be required by the ENGINEER to maintain the same or reasonably equivalent insurance coverage as required for the ENGINEER. When sub consultants/subcontractors maintain insurance coverage, ENGINEER shall provide CITY with documentation thereof on a certificate of insurance. L. Independent Consultant The ENGINEER agrees to perform all services as an independent consultant and not as a subcontractor, agent, or employee of the CITY. M. Disclosure STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 7 of 14 The ENGINEER acknowledges to the CITY that it has made full disclosure in writing of any existing conflicts of interest or potential conflicts of interest, including personal financial interest, direct or indirect, in property abutting the proposed PROJECT and business relationships with abutting property cities. The ENGINEER further acknowledges that it will make disclosure in writing of any conflicts of interest that develop subsequent to the signing of this contract and prior to final payment under the contract. N. Asbestos or Hazardous Substances (1) If asbestos or hazardous substances in any form are encountered or suspected, the ENGINEER will stop its own work in the affected portions of the PROJECT to permit testing and evaluation. (2) If asbestos or other hazardous substances are suspected, the ENGINEER will, if requested, assist the CITY in obtaining the services of a qualified subcontractor to manage the remediation activities of the PROJECT. O. Permitting Authorities -Design Changes If permitting authorities require design changes so as to comply with published design criteria and/or current engineering practice standards which the ENGINEER should have been aware of at the time this Agreement was executed, the ENGINEER shall revise plans and specifications, as required, at its own cost and expense. However, if design changes are required due to the changes in the permitting authorities' published design criteria and/or practice standards criteria which are published after the date of this Agreement which the ENGINEER could not have been reasonably aware of, the ENGINEER shall notify the CITY of such changes and an adjustment in compensation will be made through an amendment to this AGREEMENT. Article V Obligations of the City Amendments to Article V, if any, are included in Attachment C. A. City -Furnished Data ENGINEER may rely upon the accuracy, timeliness, and completeness of the information provided by the CITY. B. Access to Facilities and Property The CITY will make its facilities accessible to the ENGINEER as required for the ENGINEER's performance of its services and will provide labor and safety equipment as required by the ENGINEER for such access. The CITY will perform, at no cost to the ENGINEER, such tests of equipment, machinery, STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 8 of 14 pipelines, and other components of the CITY's facilities as may be required in connection with the ENGINEER's services. The CITY will be responsible for all acts of the CITY's personnel. C. Advertisements, Permits, and Access Unless otherwise agreed to in the Scope of Services, the CITY will obtain, arrange, and pay for all advertisements for bids; permits and licenses required by local, state, or federal authorities; and land, easements, rights -of -way, and access necessary for the ENGINEER's services or PROJECT construction. D. Timely Review The CITY will examine the ENGINEER's studies, reports, sketches, drawings, specifications, proposals, and other documents; obtain advice of an attorney, insurance counselor, accountant, auditor, bond and financial advisors, and other consultants as the CITY deems appropriate; and render in writing decisions required by the CITY in a timely manner in accordance with the project schedule in Attachment A. E. Prompt Notice The CITY will give prompt written notice to the ENGINEER whenever CITY observes or becomes aware of any development that affects the scope or timing of the ENGINEER's services or of any defect in the work of the ENGINEER or construction contractors. F. Asbestos or Hazardous Substances Release. (1) CITY acknowledges ENGINEER will perform part of the work at CITY's facilities that may contain hazardous materials, including asbestos containing materials, or conditions, and that ENGINEER had no prior role in the generation, treatment, storage, or disposition of such materials. In consideration of the associated risks that may give rise to claims by third parties or employees of City, City hereby releases ENGINEER from any damage or liability related to the presence of such materials. (2) The release required above shall not apply in the event the discharge, release or escape of hazardous substances, contaminants, or asbestos is a result of ENGINEER's negligence or if ENGINEER brings such hazardous substance, contaminant or asbestos onto the project. G. Contractor Indemnification and Claims The CITY agrees to include in all construction contracts the provisions of Article IV.E. regarding the ENGINEER's Personnel at Construction Site, and provisions providing contractor indemnification of the CITY and the ENGINEER for contractor's negligence. STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 9 of 14 H. Contractor Claims and Third -Party Beneficiaries (1) The CITY agrees to include the following clause in all contracts with construction contractors and equipment or materials suppliers: "Contractors, subcontractors and equipment and materials suppliers on the PROJECT, or their sureties, shall maintain no direct action against the ENGINEER, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the CITY will be the beneficiary of any undertaking by the ENGINEER." (2) This AGREEMENT gives no rights or benefits to anyone other than the CITY and the ENGINEER and there are no third -party beneficiaries. (3) The CITY will include in each agreement it enters into with any other entity or person regarding the PROJECT a provision that such entity or person shall have no third -party beneficiary rights under this Agreement. (4) Nothing contained in this section V.H. shall be construed as a waiver of any right the CITY has to bring a claim against ENGINEER. I. CITY's Insurance (1) The CITY may maintain property insurance on certain pre-existing structures associated with the PROJECT. (2) The CITY will ensure that Builders Risk/Installation insurance is maintained at the replacement cost value of the PROJECT. The CITY may provide ENGINEER a copy of the policy or documentation of such on a certificate of insurance. (3) The CITY will specify that the Builders Risk/Installation insurance shall be comprehensive in coverage appropriate to the PROJECT risks. J. Litigation Assistance The Scope of Services does not include costs of the ENGINEER for required or requested assistance to support, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. In the event CITY requests such services of the ENGINEER, this AGREEMENT shall be amended or a separate agreement will be negotiated between the parties. K. Changes The CITY may make or approve changes within the general Scope of Services STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 10 of 14 in this AGREEMENT. If such changes affect the ENGINEER'S cost of or time required for performance of the services, an equitable adjustment will be made through an amendment to this AGREEMENT with appropriate CITY approval. Article VI General Legal Provisions Amendments to Article VI, if any, are included in Attachment C. L� C. I� Authorization to Proceed ENGINEER shall be authorized to proceed with this AGREEMENT upon receipt of a written Notice to Proceed from the CITY. Reuse of Project Documents All designs, drawings, specifications, documents, and other work products of the ENGINEER, whether in hard copy or in electronic form, are instruments of service for this PROJECT, whether the PROJECT is completed or not. Reuse, change, or alteration by the CITY or by others acting through or on behalf of the CITY of any such instruments of service without the written permission of the ENGINEER will be at the CITY's sole risk. The CITY shall own the final designs, drawings, specifications and documents. Force Majeure The ENGINEER is not responsible for damages caused by acts of God, strikes, lockouts, accidents, control of the ENGINEER. Termination or delay in performance or other events beyond the (1) This AGREEMENT may be terminated only by the City for convenience on 30 days' written notice. This AGREEMENT may be terminated by either the CITY or the ENGINEER for cause if either party fails substantially to perform through no fault of the other and does not commence correction of such nonperformance with 5 days of written notice and diligently complete the correction thereafter. (2) If this AGREEMENT is terminated for the convenience of the City, the ENGINEER will be paid for termination expenses as follows: a.) Cost of reproduction of partial or complete studies, plans, specifications or other forms of ENGINEER'S work product; b.) Out-of-pocket expenses for purchasing storage containers, microfilm, electronic data files, and other data storage supplies or services; STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 11 of 14 c.) The time requirements for the ENGINEER'S personnel to document the work underway at the time the CITY'S termination for convenience so that the work effort is suitable for long time storage. (3) Prior to proceeding with termination services, the ENGINEER will submit to the CITY an itemized statement of all termination expenses. The CITY'S approval will be obtained in writing prior to proceeding with termination services. E. Suspension, Delay, or Interruption to Work The CITY may suspend, delay, or interrupt the services of the ENGINEER for the convenience of the CITY. In the event of such suspension, delay, or interruption, an equitable adjustment in the PROJECT's schedule, commitment and cost of the ENGINEER' personnel and subcontractors, and ENGINEER's compensation will be made. F. Indemnification (1) The ENGINEER agrees to indemnify and defend the CITY from any loss, cost, or expense claimed by third parties for property damage and bodily injury, including death, caused solely by the negligence or willful misconduct of the ENGINEER, its employees, officers, and subcontractors in connection with the PROJECT. (2) If the negligence or willful misconduct of both the ENGINEER and the CITY (or a person identified above for whom each is liable) is a cause of such damage or injury, the loss, cost, or expense shall be shared between the ENGINEER and the CITY in proportion to their relative degrees of negligence or willful misconduct as determined pursuant to T.C.P. & R. Code, section 33.011(4) (Vernon Supplement 1996). G. Assignment Neither party shall assign all or any part of this AGREEMENT without the prior written consent of the other party. H. Interpretation Limitations on liability and indemnities in this AGREEMENT are business understandings between the parties and shall apply to all the different theories of recovery, including breach of contract or warranty, tort including negligence, strict or statutory liability, or any other cause of action, except for willful misconduct or gross negligence for limitations of liability and sole negligence for indemnification. Parties mean the CITY and the ENGINEER, and their officers, employees, agents, and subcontractors. I. Jurisdiction STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 12 of 14 The law of the State of Texas shall govern the validity of this AGREEMENT, its interpretation and performance, and any other claims related to it. The venue for any litigation related to this AGREEMENT shall be Tarrant County, Texas. J. Alternate Dispute Resolution (1) All claims, disputes, and other matters in question between the CITY and ENGINEER arising out of, or in connection with this Agreement or the PROJECT, or any breach of any obligation or duty of CITY or ENGINEER hereunder, will be submitted to mediation. If mediation is unsuccessful, the claim, dispute or other matter in question shall be submitted to arbitration if both parties acting reasonably agree that the amount of the dispute is likely to be less than $50,000, exclusive of attorney's fees, costs and expenses. Arbitration shall be in accordance with the Construction Industry Arbitration Rules of the American Arbitration Association or other applicable rules of the Association then in effect. Any award rendered by the arbitrators less than $50,000, exclusive of attorney's fees, costs and expenses, will be final, judgment may be entered thereon in any court having jurisdiction, and will not be subject to appeal or modification except to the extent permitted by Sections 10 and 11 of the Federal Arbitration Act (9 U.S.C. Sections 10 and 11). (2) Any award greater than $50,000, exclusive of attorneys fees, costs and expenses, may be litigated by either party on a de novo basis. The award shall become final ninety (90) days from the date same is issued. If litigation is filed by either party within said ninety (90) day period, the award shall become null and void and shall not be used by either party for any purpose in the litigation. K. Severability and Survival If any of the provisions contained in this AGREEMENT are held for any reason to be invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability will not affect any other provision, and this AGREEMENT shall be construed as if such invalid, illegal, or unenforceable provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.H., VI.I., and VI.J. shall survive termination of this AGREEMENT for any cause. L. Observe and Comply ENGINEER shall at all times observe and comply with all federal and State laws and regulations and with all City ordinances and regulations which in any way affect this AGREEMENT and the work hereunder, and shall observe and comply with all orders, laws ordinances and regulations which may exist or may be enacted later by governing bodies having jurisdiction or authority for such enactment. No plea of misunderstanding or ignorance thereof shall be considered. ENGINEER agrees to defend, indemnify and hold harmless CITY and all of its officers, agents and employees from and against all claims or liability arising out of the violation of any such order, law, ordinance, or STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 13 of 14 regulation, whether it be by itself or its employees. Article vi i Attachments, Schedules, and Signatures This AGREEMENT, including its attachments and schedules, constitutes the entire AGREEMENT, supersedes all prior written or oral understandings, and may only be changed by a written amendment executed by both parties. The following attachments and schedules are hereby made a part of this AGREEMENT: Attachment A -Scope of Services Attachment B — Compensation Executed this the► day of-� �V ; 2008. ATTEST: City Secretary LOntract Authorization }ate APPROV Assistant Ci ATTEST: TO FOBM STANDARD ENGINEERING AGREEMENT (REV 10/06/05) Page 14 of 14 GALITY CITY OF FORT WORTH C rfes W. Daniels — Assistant City Manager APPROVAL RECOMMENDED rd Zavala, Director and Community Services Department ENGINEER: Neel -Schaffer Inc, `:'y ATTACHMENT A SCOPE OF SERVICES Greenway Park Road and Parking Improvements The City of Fort Worth desires to make road and parking improvements at Greenway Park. These are illustrated on a Concept Alternative Site Plan Phase II. The construction budget is $416,000. Approximately 194 paved parking spaces are desired. They are located along both sides of Pharr Street and Greenway Park Drive. About 750' of road improvements will be required on Pharr Street and about 950' on Greenway Park Drive. All parking spaces are 90 degree. Both roads will be 24' wide and have curb and gutter. The construction documents shall include demolition of the existing asphalt road and accessible parking in accordance with Texas Department of Licensing and Regulation (TDLR) requirements. Site grading, drainage improvements and actual amount of designed parking spaces shall be contingent to available not to exceed construction budget of $416,000. Due to the limited construction budget only the Pharr Street portion of the work is included in this contract. The curb and gutter improvements will also require drainage improvements. Additionally some drainage improvements will be necessary for the swale behind the play area. Based on the available Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM), the road and parking improvements are not in the floodplain. Therefore, FEMA coordination and a City Floodplain permit are not anticipated. There are adjacent areas, indicated as sumps, on the maps. These are obvious on the ground. U.S. Army Corps of Engineers 404 permitting is also not anticipated since the work is generally rebuilding existing roads. Greenway Park Drive will be relocated slightly in a future project and have tight turns to discourage truck traffic. The parking area near the Pharr entrance will be removed as will the other existing pavement along both roads. Drainage along Pharr Street will be placed underground. An intersection turnout for the Tindall property will be provided near the Pharr Street entrance as per the entry design developed by Dunaway Associates in compliance to agreement between Parks and Community Services (PALS) and Tindall, the adjacent property owner. Submittals will be required to TDLR and TxDOT. Coordination will be required with both the Transportation and Public Works Department and the Water Department. A Storm Water Pollution Prevention Plan (SWPPP) Notice of Intent (NOI) shall also be prepared and submitted to PACS for execution. Survey data will be provided by the City. The drawings shall include topographic layout at 20 scale and be prepared on 22" x 34" sheets in accordance with City survey standards. Land acquisition is not anticipated. Geotechnical design services are not included. The City will provide two alternate paving sections. One will be concrete and the other asphalt. The roadbed 11/12/2008 P:\Marketing\Fort Worth\Greenway Park\Attachment A.doc Page 1 of 3 sub -base shall be designed in accordance with the City provided geotechnical report. The included tasks are specifically: 1. Attend one coordination meeting to discuss the project constraints 2. Site reconnaissance 3. Data collection from the City for existing information (research available records for existing utility, pavement and drainage information) 4. Periodic e-mail updates 5. Develop proposed alignment for Pharr Street 6. Prepare a preliminary design layout and develop estimated construction cost for (a) asphalt / curb and gutter roadbed and (b) concrete / curb and gutter roadbed, both based on the construction budget and to City roadway construction standards. 7. Provide layout design options for both (a) and (b) noted above so that the City can determine the work scope extent based on each option 8. Prepare the following construction documents based on the selected roadbed material: ➢ Cover sheet — showing the project name, location, and other typical information ➢ General notes sheet — with construction notes to the contractor ➢ SWPPP and erosion control plan ➢ Demolition Plan ➢ Drainage area map ➢ Drainage calculations sheet ➢ Plan and profile sheets at 20 and two scale (two sheets) ➢ Cross section sheets at 20 and two scale (spaced at 50' and requiring one sheet) ➢ Drainage plan and profile sheet for swale (no cross sections) ➢ Standard City detail sheets (paving and drainage) 9. Specifications and special provisions 10. Preliminary opinion of probable construction cost 11. Submit two copies of 50 percent preliminary plans and specifications with preliminary opinion of probable construction cost to City for review 12. Attend meeting with City to discuss comments 13. Revise plans and specifications as appropriate 14. Finalize construction documents and opinion of probable construction cost 15. Submit two copies of 90 percent final plans and specifications with opinion of probable construction cost to City for review 16. Attend meeting with City to discuss comments 17. Revise plans and specifications as appropriate 18. Submit two copies of the plans to TxDOT for coordination of the intersection 19. Provide one (1) original reproducible mylar set of drawings and original specifications to PACS for printing. 20. Attend and document pre -bid meeting 21. Prepare addenda for distribution by City 22. Attend and document pre -construction meeting 23. Review and approve shop drawings, observe construction procedures and results, and provide plan interpretation for resolving field construction discrepancies or field design deficiencies 11/12/2008 P:\Marketing\Fort Worth\Greenway Park\Attachment A.doc Page 2 of 3 24. Make and document a maximum of one periodic site visit; attend final inspection (City prepares punch list): total two site visits during construction The City will provide the following: • All Surveying • Electronic samples of Notice to Bidders, Instructions to Bidders, Proposal, Contract, General Provisions, Special Provisions, Wage Rates, Maintenance Bond, Performance Bond, Payment Bond, and other items typically used by City for bidding • Bid Advertisement and award of contract • Bidding and plan review printing and distribution (both DOE and plan rooms), except as included above The following items, if needed, are not part of the proposal services /fee and will be considered extra work: • Design/topographic surveying or property boundary surveying • Parcel acquisition services (survey, negotiation, appraisals, condemnation, etc.) • Geotechnical investigations • Additional meetings and/or site visits not identified above • Additional printing • TDLR submittal and fees • Preparing record drawings • Greenway Park Drive improvements The estimated time of construction is four months. 11/12/2008 P:\Marketing\Fort Worth\Greenway Park\Attachment A.doc Page 3 of 3 ATTACHMENT B COMPENSATION Greenway Park on and Parking Improvements I. Compensation The Engineer shall be compensated a total lump sum fee of $57,015.00. Payment of the total lump sum fee shall be considered full compensation for the services described in Attachment A for all labor materials, supplies and equipment necessary to complete the project. All permitting, application and similar project fees will be paid directly by the City. The Engineer shall be paid monthly subject to the following limits: • Preliminary submittal (tasks 1 to 11) — 75% of total fee ($42,761.25) • Final submittal (tasks 12 to 15) — 85% of total fee ($48,462.75) • Bidding (tasks 16 to 21) — 95% of total fee ($54,164.25) • Construction (tasks 22 to 24) — 100% of total fee ($57,015.00) II. Schedule (Calendar Days) "The schedule for the above services follows: • Kickoff meeting within one week of notice to proceed • Preliminary submittal within twelve weeks of notice to proceed and receipt of survey • Final submittal within six weeks of preliminary comments • Bidding documents within two weeks of final comments • Total: 20 weeks, exclusive of PACS review time 11/12/2008 P:\Marketing\Fort Worth\Greenway Park\Attachment B.doc Page 1 of 1 Page 1 of 2 City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 11/11/2008 DATE: Tuesday, November 11, 2008 LOG NAME: 80GREENWAY-NS REFERENCE NO.: **C-23167 SUBJECT: Authorize Professional Services Agreement with Neel -Schaffer, Inc., for $57,015.00 for Road Parking Improvements at Greenway Park RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a professional services agreement with Neel -Schaffer, Inc., in the amount of $57,015.00 for the preparation of construction documents for road and parking lot improvements at Greenway Park. DISCUSSION: The 2004 Capital Improvement Program (CIP) allocated $5,050,000.00 for road/parking lot replacement projects at various community parks with $306,000.00 allocated for road and parking improvements at Greenway Park. Additionally, $31,067.00 of gas pipeline easement fees and $202,577.00 of gas bonus fees have been earmarked for Greenway Park and will be used to supplement CIP funding, increasing the project budget to $539,644.00. The selected consultant, Neel -Schaffer, Inc., has proposed to perform the preparation of construction documents and design services for a lump sum fee of $57,015.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. Final construction documents for the access road and parking lot shall be completed and submitted for City staff review no later than March 2009. Construction is anticipated to begin in October 2009 and be completed by January 2010. M/WBE - Neel -Schaffer, Inc., is in compliance with the City's M/WBE Ordinance by committing to 11 percent M/WBE participation. The City's goal on this project is 10 percent. Greenway Park is located in COUNCIL DISTRICT 2, Mapsco 63T. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, http://apps.cfwnet.org/council�acket/Reports/mc�rint.asp 12/5/2008 Page 2 of 2 as appropriated, of the Street Improvements Fund. TO Fund/Account/Centers Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers C200 531200 802370029430 Charles Daniels (6183) Richard Zavala (5704) Carlos Gonzalez (5734) $57,015.00 http://apps.cfwnet.org/council�acket/Reports/mc�rint.asp 12/5/2008