Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ordinance 6353
f ORDINANCE NO. 5 AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF CYPRESS STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT 1: CYPRESS STREET From Presidio Street to East Lancaster Avenue, known and designated as Unit 1, Project No. 104-24000-208, to be improved by constructing a six-inch thick concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high .concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty-six feet wide and by constructing six- inch thick concrete driveways and four-foot wide concrete sidewalk where specified. UNIT 2: PANOLA AVENUE From Forby Avenue to Perkins Avenue, known and designated as Unit 2, Project No. 104-24000-208, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick driveways where specified. UNIT 3: LYNNFIELD DRIVE From Hampshire Boulevard to Jamaica Lane, known and designated as Unit 3, Project No. 104-24000- 208, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven- inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with AUSTIN ROAD COMPANY ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT 1: CYPRESS STREET From Presidio Street to East Lancaster Avenue, known and designated as Unit 1, Project No. 104-24000-208. The estimated cost of improvements is $ 22,367.46 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.69 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 14.58 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ 2.76 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 20.03 , plus the cost incurred for concrete driveway construction where specified. III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 14th day of September , 19 70 at 9:30 A.M. , in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give or cause to be given notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be by advertisement inserted at least three (3) times in a newspaper published in the City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United States Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names of such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be improved is listed as "unknown" on the then current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is shown, no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of the properties to be assessed, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those per- sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con- clusive evidence of the facts therein recited. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this day of 19 APPROVED AS TO FORM AND LEGALITY: City Attorney UNIT 5: PROVINE STREET From south property line of Lot 9, Block 2; Akers Paxton Addition to southeast corner of Lot 5, Block 9, Painted Oaks Addition, known and designated as Unit 5, Project No. 104-24000-208. The estimated cost of improvements is $ 6,190.31 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.69 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.24 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.93 plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $� per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified. UNIT 2: PANOLA AVENUE From Forby Avenue to Perkins Avenue, known and designated as Unit 2, Project No. 104-24000-208. The estimated cost of improvements is $ 9,420.62 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.84 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.44 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 3: LYNNFIELD DRIVE From Hampshire Boulevard to Jamaica Lane, known and designated as Unit 3, Project No. 104-24000-208. The estimated cost of improvements is $ 20,614.11 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.84; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ 2.76 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 11.20 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: VIEW STREET From Tandy Avenue to Ayers Avenue, known and designated as Unit 4, Project No. 104-24000-208. The estimated cost of improvements is $ 38,168.85 _ the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.84 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .85 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.44 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: VIEW STREET From Tandy Avenue to Ayers Avenue, known and designated as Unit 4, Project No. 104-24000-208, to be improved by construct- ing a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 5: PROVINE STREET From South property line of Lot 9, Block 2, Akers Paxton Addition to southeast corner of Lot 5, Block 9, Painted Oaks Addition, known and designated as Unit 5, Project No. 104-24000-208, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. --3* ack1�Hn�t r 45�1 City of Fort Worth, Texas JNE ORPHIS Mayor and Council Communication 6& B. 3RAHAM DATE NUFMERRE*E SUBJECT: Award of Contract - Assessment PAGE Paving at 5 Locations on the East Side for _ 8/ 1 70 C-1814 City Council action is requested on the project described below. Project Descri tp ion Nature of Work: Assessment Paving at 5 Locations on the East Side Roadway Unit Street Limits Width (feet) R.O.W. (feet) 1 Cypress Street Presidio Street to 36 60 E. Lancaster Avenue 2 Panola Avenue Forby Avenue to 30 50 Perkins Avenue 3 Lynnf_ield Drive Hampshire Boulevard to 30 50 Jamaica Lane 4 View Street Tandy Avenue to 30 50 Ayers Avenue 5 Provine Street South Property line. of 30 50 Lot 9, Block 2, Akers Paxton Addition to Southeast corner of Lot 5, Block 9, Painted Oaks Addition Units. 1,3, and 5 were initiated by petition, Unit 2 is a paving skip, and Unit 4 was initiated by poll card survey, Submission of Bids The following bids have been received: Bidder Amount Austin Road Company $87,964.85 Ernest Loyd 90,529, 15 Texas Bitulithic Company 92,676.75 L Grimes & Co. , Inc. 94,908.25 Glade, Inc. 99,687.95 Bids Received: July 23, 1970 Working Days Allotted: 80 Sidewalks Sidewalks are proposed on Unit 1 to tie in with existing walks and on the i DATE REFERENCE SUBJECT: Award of contract - Assessment PAGE NUMBER Paving at 5 Locations on the East Side 2 2 8 17 70 C-1814 °f north side of Unit 3 to serve church property. .Project Cost and. Financing Based on the low bid $37,451.91 will be assessed against abutting property owners. The cost to the City-at-large will be approximately $59,000. Recommendations It is recommended that: 1) The following bond fund transfers be approved: Amount From To Reason $37,451.91 Revolving Fund 5 Locations on the Property Owners' por- 042--09724-901 East Side - 042- tion of Construction 10424-208 cost $59,000.00 Unspecified 5 Locations on the City's portion of con- 104-24000-901 East Side - 10.4- struction, engineering, 24000-208 and miscellaneous costs. 2) An ordinance be adopted: a) Declaring the necessity for and ordering the improvements; b) Making provisions for levying assessments; c) Directing the Public Works Director to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Austin Road Company in the amount of $87,964,85; and, e) Making appropriations to cover the indebtedness thereby incurred for improvements as described above. 3) An ordinance be adopted: a) Approving the cost and amounts to be assessed; and, b) Setting September 14, 1970, as the date for the Benefit Hearing. HDM/mh Attachments: "A" - Resume of Project "B" - Location Map "C" - Engineers' Preliminary Rolls SUBMITTED BY: DISPOSITIO COUNCIL: P ESSED Y Ca"APPROVED ER (DESCRIBE) Ak, 631 CITY SECRETARY DATE CITY MANAGER • M19 3 C-- s lav0 z iuwaON z Q {fie 0I2 a 011 o c� � 111 1a0 VOVS - NINOad NIAOad S1HJIlH o S1 OHH w' RNNU 1: -�� Va QQ 3 1w sm" � s olao C) �� = d Q Ail as jet Q z = 00 T W o5 3nv oldn n�0' n-lE G' VIAVG Q Ln PV llldV MV N! •yu` W k,11 z ./SYJ Z d �� z NOF W LL P� :- 1IN 1 irIIV I H ~ a. ^ill 1Na0W 0801(Va is-cra. Oldol sNI Saa f� o w _z O m NOSaIaNV o N 1 7IVv v ' \ W tiY Q v, X Ntl1 c be lad $00 Q LD r�E 3 N NO Ol C S OR VS Q e W— AN tlH z Q Oo Z is M44La � Q = `> 11V NHIM H O`d E3 o ON Ntl tihc� is xlss > Q o ,]AV AoNao m ti > is is] 11tl1 a1 Q V (U Y 1-AV Vl r W 0 OVYVDAS HO IM o Qr. LL a jtla0 l 13MW0a0 U a ti SI O Z 31 x1 3 Q 1NIlaaVfl p J h � . N 1XH1 �/'� �p 1S(v' 1S N M v/ L b ` a auj A tll IO I� J 10 1 p 1NId w 7S N 3 S 0 /f1 � Q CITY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION ASSESSMENT PAVING AT 5 LOCATIONS ON THE EAST SIDE PROJECT NO. 1.04-24000-208 A Neighborhood Hearing was conducted by the Engineering Division of the Public Works Department at the Tandy Elementary School on August 3, 1970, for the Assessment Paving at 5 Locations on the East Side. Procedures concerning owner participation in the cost, method and policies determining assessments, street construction, standards and methods of payment were explained by Mr. Odell H. Schmidt to the twenty-five persons attending. The meeting was then opened for a question and answer period. Unit 1 , Cypress Street: No questions Unit 2, Panola Avenue: Mr. William K. Fuller, 60t Perkins, owner of Lot: 1 , Block 2, Clairmont Place, said he had no objection to the curb and gutte, , but he did not understand why the pavement should be extended 65' beyond the intersection. Mr. Schmidt explained that this was to control. the drainage. Mrs. Lucille Shadrake, 3763 Panola, owner of Lot 17, Block 2, Beacon Hill Addition, asked why the City did not extend the paving on to Ayers Avenue. She was told that this would have to be petitioned by the property owners. Mr. L. D. Tucker, 2517 McGee, owner of Lot 16, Block 2, Beacon Hill Addition, asked why they could pave the section abutting their property and could not extend it to Ayers. Mr. Schmidt explained that the section to be paved was considered a paving skip and that the City had the authority to pave these wherever they saw need of it. Unit 3, Lynnfield Drive: Van M. Dickens, pastor of the Church of God of Prophecy, 3428 Hampshire, objected to the sidewalk. He said he felt it unnecessary at the rear of the church property and would not be of any value to the church. Mr. Joseph L. Smith, 3408 Lynnfield, owner of Lot F, Block 1, Normandy Place Addition, requested an additional driveway. Unit 4, View Street: Mr, Edward P. Patterson, 3608 View, owner of Lot 4, Block 16, Tandy Addition, asked about the width of the street and extent of the improvements. Mr. Arthur Manning, 3.528 View, owner of Lot 2, Block 15, Tandy Addition, had no objections, but said there was a paving skip on View Street just west of Tandy and he thought this should be paved at the same time. Mr. Schmidt said this would be checked and if possible would be included in the project. Unit 5, Provine Street: Mr. Joe Cockran, 1800 Carl, owner of Lot 1, Block 4, Akers Paxton Addition, objected to the improvements, because they exceed the request. He said he felt it was un- necessary to pave anywhere except in the section that had gravel surface. Mr. Thomas F. Hill, 1725 Edervi.11e Road, owner of Lot 4, Block 2, Painted Oaks Addition, requested an additional driveway to tie in with the second gate at the rear of his lot. After a short general discussion, the meeting was closed. FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below! Estimates of the total cost of improvements on a portion of CYPRESS STREET and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROJECT NO. 104-24000-208, UNIT 1: CYPRESS STREET FROM PRESIDIO STREET TO EAST LANCASTER AVENUE, to be improved by constructing a six-inch thick concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty-six feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. The following assessment rates have been established: Six-inch thick concrete pavement (Industrial Zoning) . . . . . . . . . . . . . . $14.58/L.F. (Industrial Zoning less Owner Occupied Credit) 8.64/L.F. Seven-inch curb and eighteen-inch gutter . . . . . . . . . 2.69/L.F. Eighteen-inch gutter only . . . . . . . . . . . . . . . . 1.35/L.F. Four-foot wide concrete sidewalk . . . . . . . . . . . . . 2.76/L.F. Six-inch thick concrete driveway . . . . . . . . . . . . . .85/S.F. PROJECT NO. 104-24000-208, UNIT 2: PANOLA AVENUE FROM FORBY AVENUE TO PERKINS AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen- inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Six-inch thick hot-mix asphaltic concrete (Residential zoning) . . . . . . . . . . . . . . $2.80/L.F. (Residential Zoning less .27 credit for existing penetration) . . . . . . . . . . . . 2.53/L.F. Seven-inch curb and eighteen-inch gutter . . . . . . . . 2.60/L.F. Six-inch thick concrete driveway . . . . . . . . . . . . .85/S.F. PROJECT NO. 104-24000-208, UNIT 3: LYNNFIELD DRIVE FROM HAMPSHIRE BOULEVARD TO JAMAICA LANE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. The following assessment rates have been established: Six-inch thick hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . . $2.80/L.F. Seven-inch curb and eighteen-inch gutter . . . . . . . . 2.60/L.F. Four-foot wide concrete sidewalk . . . . . . . . . . . . 2.76/L.F. Six-inch thick concrete driveway . . . . . . . . . . . . .85/S.F. Pavement, Curb and Gutter (Residential Zoning less back lot credit) . . . 2.70/L.F. PROJECT NO. 104-24000-208, UNIT 4: VIEW STREET FROM TANDY AVENUE TO AYERS AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Six-inch thick hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . $2.80/L.F. Seven-inch curb and eighteen-inch gutter . . . . . . . 2.60/L.F. Six-inch thick concrete driveway . . . . . . . . . . . .85/S.F. PROJECT NO. 104-24000-208, UNIT 5: PROVINE STREET FROM SOUTH PROPERTY LINE OF LOT 9, BLOCK 2, AKERS PAXTON ADDITION TO SOUTHEAST CORNER OF LOT 5, BLOCK 9, PAINTED OAKS ADDITION, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Six-inch thick hot-mix asphaltic concrete pavement (Residential Zoning) . . . . . . . . . . . . . $2.71/L.F. (Residential Zoning less .27 credit for existing penetration) . . . . . . . . . . . . 2.44/L.F. Seven-inch curb and ei.ghteen-inch gutter . . . . . . . . 2.69/L.F. Pavement, Curb and Gutter (Residential Zoning less back lot credit) 2.70/L.F. (Residential Zoning less back lot credit less .27 or for existing penetration) . . . . 2.57/L.F. Six-inch thick concrete driveway . . . . . . . . . . . . .85/S.F. The assessments result in the following division of costs: TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . $37,451. 91 TOTAL COST TO CITY OF FORT WORTH . . . . . . . . 59,309.44 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . $96,761.35 PROJECT NO. 104-24000-208, UNIT 1; CYPRESS STREET FROM PRESIDIO STREET TO EAST 1ANCASTSER AVENUE, to be improved by constructing a six-inch thick concrete pavement an a six-inch thick lime stabilized subgradee seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty-six feet wide and by constructing six- inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF EAST LANCASTER AND PRESIIIDIO STREET WEST SIDE OF STREET TEXAS & PACIFIC RW. CO°S. ADDITION T. W. Howyeth 91 92 162.5° 'Pavement $14.58 $2,369.25 2320 Cypress Ind. 162.5° Gutter only 1.35 219.38 38 Sq. Ft. Driveway o85 32.30 $2,6M 93 Wilfred R. McDonald 8 92 162,5° Pavement $14.58 $29369.25 c/o Reimers Taylo. Ind. $2,369o25 1410 E. Lancaster E. LANCASTER INTERSECTS EAST SIDE OF STREET Ted Penner 1 93 162.5" Pavement $14.58 $2,369.25 1502 E. Lancaster Ind, 122.5" Curb & Gutter 2.69 329.53 40" Gutter Only 1.35 54000 6 ' Sq. Ft. Drive .85 56 A5 $2,809.73 Willie Leathers N. 42" 93 47u ?AvPMPnt. 2311 Cypress of 16 Ind. ,64 $ 362,88 42 ' v 35 56.70 $ 419058 1 r PROJECT NO, 104-24000-208, UNIT lg CYPRESS STREET FROM RRESIDIO STREET TO EAST LANCASTER AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET TEXAS & PACIFIC RWY. CO°Sm ADDITION C. C. Gumm, .Jr. S. 120.5° 93 120,5' Pavement $14,58 $1,756.89 R.O. Box 670 of 16 Ind. 65' Curb & Gutter 2.69 174.85 55.5° Clatter ©:ply 1.35 74.93 40' Sidewalk 2.76 110.40 96 Sq, Ft, Driveway .85 81.60 $2,198.67 TOTAL COST TO PRJ ERTY O ERS ® o 0 0 0 0 0 0 . . . $10,418.16 TOTAL COST TO CITE OF FORT WORTH o o , 0 0 0 0 11,949.30 TOTAL ESTIMATED CONSTR,(,]'C'TION COST 'UNIT 1 0 0 , , o , $22,367.46 2 ' PROJECT NO. 1.04-24000-208, UNIT 2. PANOLA AVENUE FROM FOREY AVENUE TO PERKINS AVENUE, to be improved by constructing a six-inch thick hot-mire asphaltic concrete pavement on a sits-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING 57' WEST OF THE EAST PROPERTY LINE OF LOT 14a BLOCK 1, NORTH SIDE OF STREET BEACON HILL ADDITION Temple Baptist Church 14 1 22' Pavement $2.80 $ 61.60 421 South Ayers Res. $ 61.60 FORBY STREET INTERSECTS L. D. Tucker 16 2 100' Pavement $2.80 $280.00 2517 McGee Res. 90' Cii_zrb a. Gutter 2.60 234.00 $ .514.00 Lucille Shadrake 17 2 50° P;r t,rnr.nt $:2.80 $140.00 3763 Panola Avenue Res. 50' py; =men 2.53 126.50 100° C,ucr to r 2.60 260.00 $ 526.50 St. Germain Foundation 512 Haynes 14 3 200 Pa�,ement. $2.53 $ 50.60 Revs. $ 50.60 PERKINS AVENUE INTERSECTS CLAIRMONT PLACE SOUTH SIDE OF STREET Wm. K. Fuller 1 2 65' Pavement $2.53 $164.45 601 Perkins Avenue Res. 55° Curb & Gut'ter, 2.60 1.43.00 $ 307.45 PERKINS AVENUE INTERSECTS F'ISHBURN PLACE Katherine M. Kidd 26 1 213.5 Adjusted to 600 Perkins Avenue Res. 113.5° Pavement $2.80 $317.80 113.5° Curb & Gutter2.60 295.16 85 Sq. Ft. Dri.veway.85 72.25 $ 685.15 3 PROTECT NO. 104-24000-2M UNIT 20 PANOLA AVENUE FROM FORBY AVENUE TO PERKINS AVENUE BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET FISHBURN PLACE James Earl Parish 1 1 17' Pavement $2.80 $ 47.60 601 Ayers Res. 17° Curb & Gutter 2.60 44.20 $ 91.80 TOTAL COST TO PROPERTY OWNERS. o . o . . . . $21237.10 TOTAL COST TO CITY OF FORT WORTH , o . . . , . e . . . . 72183.52 TOTAL ESTIMATED CONSTRUCTION COST. . . . . . . 2 420.62 4 PROJECT NO. 104-24000-208, UNIT 3: LYNNFIELD DRIVE FROM HAMPSHIRE BOULEVARD TO JAMAICA LANE, to be improved by constructing a six-inch, thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subxrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the: finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foa t wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE, AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF LYNNFIELD DRIVE AND HAMPSHIRE BOULEVARD NORTH SIDE OF STREET NORMANDY PLACE ADDITION The Church? of God 3 380° Paveme;nit:a Curb and of Prophecy COT=4. Glu';tze r $2.710 $19026.00 c/o Van M. Dickens 330 S1ewa1k 2.761,,048.80 3428 Hampshire Blvd. $2,074.80 JAMAICA LANE INTERSECTS Henry C. Crow V 2 30° No Bpr_e fit 3501 Lynnfield Res. No Asse:ssmei6nt. SOUTH SIDE OF STREET V eva Grey 19 1 30' , ;„ B,-,ri :ft t 3500 Lynnfield Dr. Revs. No Assessment L. C. Dumas 20 1 _ tO° F avement $2.8.0 $116F�.00 3440 Lynnfield Dr. Res. 6�)° cutt, b- Cutter 2.to 15-..00 Sze. Pt. Driveway .85 13.60 $ 337.50 Eugene E. Tong 21 1 0° Pavement $2.80 $168.00 3436 Lynnfield Drive Res. 60° Curb & Gutter 2060 156.00 78 Sq. Pt. Driveway .85 66.30 $ 390.30 Roma Dee Taylor 22 1 60° Pavement $2.80 $168.00 3432 Lynnfield Drive Res. 60° Curb & Cutter 2060 156.00 16 Sq. Pt. Driveway .85 13.60 $ 337060 5 PROJECT NO. 104-24000-208, UNIT 3- LYNNFIELD DRIVE FROM HAMPSHIRE BOULEVARD TO JAMAICA LANE BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET NORMANDY PLACE ADDITION John W. White A 1 50' Pavement $2.80 $140.00 3428 Lynnfield Dr. Res. 50' Curb & Gutter 2.60 130.00 16 Sq. Ft. Driveway .85 13.60 $ 283.60 D. H. Brown B 1 50' Pavement $2.80 $140.00 2826 E. Rosedale Res. 50' Curb & Gutter 2.6c 130.00 Sig. Ft. Driveway .85 13.60 $ 283.60 Danny Joe Lee C 1 50' Pave:men t $2.80 $140.00 3420 Lynnfield Res. 50' Curt & Gutter 2.6�O 130.00 16 Sq. Ft . Driveway .85 13.60 $ 283.60 Eva Lee Trott D 1 56,° Pavemen L $2.80 $140.00 3542 Avenue I Re:s. 5,0° C;rc & G�tt:er 7..60 130.00 16, Sqo Ft. Dr lv,f�way .85 13.60 $ 283.60 Milton H. Mathews E 1 56 B $2.80 $140.00 313 Clairmont Res. 50' Cucrb & Gutter 2.6C 130.00 16, 3q. Ft. Driveway .85 13.60 $ 283.60 Joseph L. Smith F 1 50° Pavemen" $2.80 $140.00 3408 Lynnfield Drive Revs. `-,0' Cu b & Gutter 2.60 130.00 161 Sig. Ft. Driveway .85 85.8.5 $ 355.85 Charles W. Torti G 1 .50' Pavement; $2.80 $140.00 3404 Lynnfield Drive Res. 50' Curb & Gutter 2.60 130.00 16 Sq. Ft. Driveway .85 13.60 $ 283.60 S. W. Witt H 1 50' Pavement, $2.80 $140.00 3400 Lynnfield Drive Res. 16 Sep. Ft. Driveway .85 13.60 $ 153.60 6 PROJECT NO. 104-24000-208, UNIT 3: LYNNFIELD DRIVE FROM HAMPSHIRE BOULEVARD TO JAMAICA LANE CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT_ SOUTH SIDE OF STREET NORMANDY PLACE ADDITION Flavia Black J 1 50' Pavement $2.80 $14C.00 3328 Lynnfield Drive Res. 50' Curb & Gutter 2.60 130.00 16 Sq. Ft. Driveway .85 13.60 $ 283.60 Iva Lee Terrell K 501 Fa—e:r,,-� 2.so c140.00 2301 Lillian Res. 50' curb & Gutter 2.60, 130.00 16 Sq. Ft. Driveway .85 13.60 $ 283.t,,o Robert M. Cagle L 1 50' Fave-rant �2.80 $140,O'�"" 3320 Hampshire Blvd. Res. .50 Clutter Only 1.30 6,f.0 0 16 Sq. Ft. Driveway 81 51 13.60 218.60 Burl L. Majors M 1 5,0 to 3316 Hampshire Blvd. Ay $1.30 63.00 15 Sq. I-. D-�-iveway .85 13.60 $ 78.60 TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . . . . $ 6,215.75 TOTAL COST TO CITY OF FORT WORTH. . . . . . . . . . . 14.398.36 TOTAL. ESTIMATED CONSTRUCTION COST . . . . . . . . .$20,614.11 7 PROJECT NO, 104-24000-208, UNIT 49 VIEW STREET FROM TANDY AVENUE TO AVERS AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement of a six- inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by con- structing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONINO FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE INTERSECTION OF TAN]DY AVEN,08 AND VIEW STREET NORTH SIDE OF STREET E. JU 2„SON Park Department Tract 1 1470° Pavement $2.80 $4,116.00 3220 Botanic Carden 1470' Curb & gutter 2.60 3,822°00 Drive $7,938.00 ASTERS STREET INTERSECTS SOUTH SIDE OF STREET 1 �'s A. Jantz, Jr. 1 16 103' Pavement $2,80 $ 294,00 2400 N. Ayers Res. 105' Curb & Gutter 2,60 273000 76105 $ 567,00 A. Jantz, Jr. 2 16 80' Pavement $2.80 $ 224000 2400 N. Ayers Res, 80' Curb & Gutter 2.60 208.00 76105 $ 432.00 R. H. W. Drechael, Sr, 3 16 105' Pavement $2�80 $ 294.00 1414 Texas Street Res. 105' Curb & ';gutter 2,60 273�00 76102 $ 567.00 Edward P. Patterson 4 16 105' Pavement $,2,80 $ 294.00 3608 View Street Res. 105' Curb & Gutter 2�60 273000 76103 85 Sq� Ft, Drive .85 72025 $ E. S, Estill 5-A 16 105' Pavement $2080 $ 294�00 3600 View Street Res. 105' Curb & Gunter 2.60� 273000 76103 $ 567a00 8 PROJECT NO. 104-24000-208, UNIT 4,, VIEW STREET FROM TANDY AVENU7, TO AVERS AVENUE CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT LEWIS AVENT-E INTERSECTS SOUTH SIDE OF STREET TANDY ADDITION E. H. Clark 1-A 15 105' Pavement $2.80 $294+ 00 3536 Viers Street Res. 105' Curb & Cutter 2.60 27MO 76103 $567.00 Arthur L. Manning 2 15 105' Pavement '2�80 $294,00 3528 View Street Res. 105' Curb & Gutter 2.60 273.00 76103 1 $5n7.0nj Elizabeth ,Johnson 3 15 105 '—ement 2.80 $294.00 3522 View Street Res. 105` —,j S, ,,�uutter L.60 273,00 7610 M Sq. kt. Drive .85 145.35 $712.35 W. D. Horne 4 15 i05° Pavement $2<80 $294.00 c/o R. E. Horne Res, 103' Curb & Gutter 2.60 273.00 P.O. Drawer 459 85 Sq. ;fit. Drive .85 72.25 Plainview, Texas $63+9.25 Gerald V. Thompson 5 15 105' Pavement $294.00 3500 View Street Res. 105' Curb & Gutter 2.60 273.00 76103 $567.00 SANDERSON AVENLYE INTERSECTS Clarence Epperly 1 7 105' Pavement $2.80 $294.00 2400 Sanderson Ave. Res, 105" Curb & Gutter 2.60 273.00 76103 $567.00 9 PROJECT NO. 104-24000-208, UNIT 4; VIEW STREET FROM TANDY AVENUE TO AyERS AVENUE CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET TANDY ADDITION Barton Davis 2 7 105' Pavement 92080 $294.00 3424 View Street Res. 105' Curb & Gutter 2.60 273,00 76103 85 Sqc Ft. Drive e85 M 25 $639a25 Clarence E. Tyree 3 7 105' Pavement $2a80 $294�00 3416 View Street Res. 105' Curb & Gutter 2a60 273,00 76103 $567000 Albert J. Hart 4 7 105' Pavement $2.80 $294,00 3408 View Street Res, 105' Curb & Gutter, 2.60 273,00 76103 1 1E S . rK m. D'=r s'--eway . _ 145.3" �7b2.3� Giles Tandy 5-A 7 105' Pavement $2,80 $294,00 2401 Tandy Avenue Res. 105' Curb & Gutter 2�60 273.00 85 Sq, Ft, Drive o85 72,25 $639�25 TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . TOTAL COST TO CITY OF FORT WORTH . . . . . . . . TOTAL ESTIMATED CONSTRUCTION COST - UNIT 4 0 . . . $38,168.85 10 PROJECT NO, 104-24000-208, UNIT 5; PROVINE STREET PRCY SOU.�TH PROPERTY LINE OF LOT 9, BLOCK 2, AKERS PAXTON ADDITION TO SOUTHEAST CORNER OF LCT 5, ]BLOCK 9. PAINTED OAKS ADD"ITION, to be improved by constructing a six-inch thick h®t-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified, ]BLOCK OWNER LOT ZONING FRONTAGIE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTH PROP7ERTY LINY- OF LOT 9, BLOCK 41) AnRS PAXTON ADDITION WEST SIDE OF STREET AaRS ?ADu``IC)N kDDIIIT',2N J. B. Kynard 9 4 97° Pavement, Curb 1801 Ederville Rd. Res a & Gutter F,_57I 4249.29, 52 Sq� Ft. Drive ,85 44a20 U93.49 PAIN':: D OA..KS ADDIT71ON Thomas Po Hill 4 _ 3o Pavement, Curb 1725 Ederville Rd. Re & Cutter $2.,70 83.73 UT, S,q� a t, Drive o85 35 W'M5 Lois M. Gunn 3 2 Yo Ber,,efit No Assessment 1721 Ederville Rd. Roman H. Aday 5 2 115.5° Adjusted to 1728 Provine Res. 85' Pavement $2.71 $230.35 30' Curb & Gutter 2.69 80.70 $311.05 PROVINE STREET INTERSECTS EAST SIDE OF STREET James T. McAlister 9 1 No Benefit No Assessment 1733 Provine AKERS P'AXTON ADDITION Joe Cochran 1 4 85' Pavement $2.71 $230�35 1800 Carl Res. 97' Pavement 2 A4 139068 182' Curb & Gutter 2.69 489.58 $859.61 11 4 PROJECT NO, 104-24000-208, UNIT 5: PROVINE STREET FROM SOUTH PROPERTY LINE OF LOT 9, BLOCK 2, AKERS PAXTON ADDITION TO SOUTHEAST CORNER OF LOT 50 BLOCK 9, PAINTED OAKS ADDITION, CONTINUED — — BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT TOTAL COST TO PROPERTY !OWNERS $1,693,20 "TOTAL COST TG 'CITE OF FORT WORu"1HI o 0 0 0 0 0 0 o s e o 4,497011 TOTAL ESTIMATED CONSTRUCTION COST — UNIT 5 0 o o e o $6,190o31 12