HomeMy WebLinkAboutOrdinance 6425 ORDINANCE NO. oU��
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF BLACKSTONE DRIVE
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
SRO Asphalt, Inc., Arlington, Texas FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF
FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with SRO Asphalt, Inc. , Arlington, Texas for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and
public places in -said City, to-wit:
UNIT 1, BLACKSTONE DRIVE From Churchill Drive to Isbell Road,
known and designated as Unit 1, Project
No. 104-24000-198.
UNIT 2, TIDWELL DRIVE From Banks Street to Springer Street,
known and designated as Unit 2, Project
No. 104-24000-198.
UNIT 3, QUAIL TRAIL From Shenna Boulevard to Ohio Garden
Road, known and designated as Unit 3,
Project No. 104-24000-198.
UNIT 4, ROBINSON STREET DELETED
UNIT 5, ROBINSON STREET DELETED
UNIT 6, McCANDLESS STREET From NW. Loraine Street to NW. 32nd Street,
known and designated as Unit 6, Project No.
104-24000-198.
UNIT 7, 29TH STREET From McCandless Street to Titus Avenue,
known and designated as Unit 7, Project No.
104-24000-198.
UNIT 8, NW. LORAINE STREET From Titus Avenue to Sherman Avenue, known
and designated as Unit 8, Project No. 104-
240001198.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
city of Fort Worth, Texas, including Ordinance No. 6259 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6259 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
cf the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying_ the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the. appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of s 19 � _
17
APPROVED AS TO FORM AND LEGALITY:
City Attorney
PROJECT NO. 104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD, to
be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide
concrete gutter, so that the finished roadway will be thirty feet wide and by constructing
six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF BLACKSTONE DRIVE AND CHURCHILL ROAD
NORTH SIDE OF STREET CHURCHILL GARDENS
Estate of 7 _ 175.8' Side Lot Adjusted to
W. F. Minze Res. 100' Pavement $2.96 $296.00
304 Churchill Road 100' Curb & Gutter 2.44 244.00
85 Sq. Ft. Drive .80 68.00
$608.00
H. B. Nettleton 8-R-1 197.7' Side Lot Adjusted to
301 Byron & 8-R-2 Res. 83' Pavement $2.96 $245.68
83' Curb & Gutter 2.44 202.52
85 Sq. Ft. Drive .80 68.00
$516.20
BYRON STREET INTERSECTS
C. W. Cole W. 95' 95' Adjusted to
1103 Yale of 21 Res. 90' Pavement $2.96 $266.40
90' Curb & Gutter 2.44 219.60
$486.00
B. R. Porter E. 55' 55' Pavement $2.96 $162.80
4608 Blackstone of 21 Res. 55' Curb & Gutter 2.44 134.20
85 Sq. Ft. Drive .80 68.00
$365.00
BROOKSIDE ACRES ADDITION
Gertrude R. Kuban 45 _ 72.8' Pavement $2.96 $215.49
3913 Golden Oaks Drive Res. 62.8' Curb & Gutter 2.44 153.23
85 Sq. Ft. Drive .80 68.00
$436.72
1
PROJECT NO. 104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD -
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
PALMETTO DRIVE INTERSECTS
NORTH SIDE OF STREET BROOKSIDE ACRES ADDITION
C. T. Cowley 44 80' Pavement $2.96 $236.80
7804 Rockdale Road Res. 70' Curb & Gutter 2.44 170.80
85 Sq. Ft. Drive .80 68.00
$475.60
Mrs. Jean Conkin & 43 _ 80' Pavement $2.96 $236.80
Mrs. Lois Milner Res. 80' Curb & Gutter 2.44 195.20
4532 Blackstone 85 Sq. Ft. Drive .80 68.00
$500.00
R. C. Dragoo 42 _ 80' Pavement $2.96 $236.80
1061 Rosedale Res. 80' Curb & Gutter 2.44 195.20
85 Sq. Ft. Drive .80 68.00
$500.00
V. W. Smith 41 80' Pavement $2.96 $236.80
4528 Blackstone Res. 80' Curb & Gutter 2.44 195.20
85 Sq. Ft. Drive .80 68.00
$500.00
Brookside Assembly 40 _ 80' Pavement $2.96 $236.80
of God Church Res. 80' Curb & Gutter 2.44 195.20
4526 Blackstone 280 Sq. Ft. Drive .80 224.00
$656.00
Elizabeth Wells 39 80' Pavement $2.96 $236.80
321 Churchill Road Res. 80' Curb & Gutter 2.44 195.20
85 Sq. Ft. Drive .80 68.00
$500.00
2
PROJECT NO. 104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD -
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET BROOKSIDE ACRES ADDITION
Pearl S. Powell 38 _ 80' Pavement $2.96 $236.80
4512 Blackstone Res. 80' Curb & Gutter 2.44 195.20
85 Sq. Ft. Driveway .80 68.00
$500.00
F. L. Wyatt 37 80' Pavement $2.96 $236.80
4510 Blackstone Res. 80' Curb & Gutter 2.44 195.20
85 Sq. Ft. Drive .80 68.00
$500.00
Clarence B. Green 36 97.4' Pavement $2.96 $288.30
301 Isbell Road Res. 97.4' Curb & Gtr. 2.44 237.66
140 Sq. Ft. Drive .80 112.00
$637.96
ISBELL ROAD INTERSECTS
SOUTH SIDE OF STREET J. WATSON SURVEY
Jay Watts Tract 2-C 504.2' Adjusted to
209 Isbell Road & Lots Res. 404.2' Pavement $2.96 $1,196.42
90 & 91 389.2' Curb & Gtr. 2.44 949.65
$2,146.07
BROOKSIDE ACRES ADDITION
A. F. Wiggins 89 90' Pavement $2.96 $266.40
4531 Blackstone Dr. Res. 90' Curb & Gtr. 2.44 219.60
171 Sq. Ft. Drive .80 136.80
$622.80
3
PROJECT NO. 104-24000-198, UNIT 1, BLACKSTONE DRIVE FROM CHURCHILL DRIVE TO ISBELL ROAD -
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET BROOKSIDE ACRES ADDITION
Harry T. Widener 88 170'Side Lot Adjusted to
274 Palmetto Drive Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
233 Sq. Ft. Drive .80 186.40
$726.40
PALMETTO DRIVE INTERSECTS
Boss H. Rush 68 160' Side Lot Adjusted to
275 Palmetto Drive Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
140 Sq. Ft. Drive .80 112.00
$652.00
C. W. & Mary Kerns E. 100' 100' Adjusted to
306 Byron of 67 Res. 58' Pavement $2.96 $171.68
58' Curb & Gtr. 2.44 141.52
85 Sq. Ft. Drive .80 68.00
$381.20
0. A. Roberts W. 60' of _ 60' Existing Facilities
5200 Blackstone 67 Res. No Assessment
BYRON STREET INTERSECTS
Curtis Murr 46 258' Side Lot Adjusted to
274 Churchill Res. 158' Pavement $2.96 $467.68
158' Curb & Gtr. 2.44 385.52
85 Sq. Ft. Drive .80 68.00
$921.20
TOTAL COST TO PROPERTY OWNERS . . . . . . $12,631.15
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . 13,856.72
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . $26,487.87
4
PROJECT NO. 104-24000-198, UNIT 2, TIDWELL DRIVE FROM BANKS STREET TO SPRINGER STREET, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide con-
crete gutter, so that the finished roadway will be thirty feet wide and by constructing six-
inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE INTERSECTION OF BANKS STREET AND TIDWELL DRIVE
NORTH SIDE OF STREET TIDWELL SUBDIVISION
Arthur L. Gresham 31 111' Side Lot Adjts ted to
1016 Banks Res. 100' Pavement $2.69 $269.00
93' Gutter Only 1.22 113.46
140' Sq. Ft. Drive .80 112.00
$ 494.46
Miss Gladys E. Kay 10 166.3' Side Lot Adjusted to
1017 Springer Res. 100' Pavement $2.96 $296.00
$ 296.00
SPRINGER STREET INTERSECTS TIDWELL SUBDIVISION
SOUTH SIDE OF STREET
M. L. Swaim 11 166.3' Side Lot Adjusted to
1009 Springer Res. 100' Pavement $2.96 $296.00
100' Curb & Gutter 2.44 244.00
$ 540.00
WESTSIDE ACRES
D. B. McDonald 2 F 92.6' Pavement $2.69 $249.09
325 Eastwood Dr. Res. 92.6' Curb & Gutter 2.44 225.94
$ 475.03
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . . $1,805.49
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . . 4,773.74
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . JLL5L9.23
PROJECT NO. 104-24000-198, UNIT 3. QUAIL TRAIL FROM SHENNA BOULEVARD TO OHIO GARDEN ROAD, to
be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six-
inch thick cement subgrade, seven-inch high concrete curb and eighteen-inch wide concrete
gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch
thick driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE BATE AMOUNT ASSESSMENT
BEGINNING AT THE INTERSECTION OF QUAIL TRAIL AND SHENNA BOULEVARD
NORTH SIDE OF STREET ROCKWOOD TERRACE THIRD FILING
N. E. Dennington 9 15 145' Pavement $2.96 $429.20
1300 Quail Trail Res. 145' Curb & Gutter 2.44 353.80
140 Sq. Ft. Driveway .80 112.00
$ 895.00
J. E. Scarborough 10 15 110' Pavement $2.96 $325.60
c/o Southland Life Res. 110' Curb & Gutter 2.44 268.40
901 Summit 140 Sq. Ft. Driveway .80 112.00
$ 706.00
Floyd Eagan 11 15 121' Pavement $2.96 $358.16
4520 White Oak Lane Res. 121' Curb & Gutter 2.44 295.24
140 Sq. Ft. Driveway .80 112.00
$ 765.40
Charles D. McClaflin 12-A & 15 249' Pave men t $2.96 $737.00
3909 Ohio Garden Road 12-B Res. 249' Curb & Gutter 2.44 607.56
$1,344.56
Charles D. McClaflin 12-C 15 224.5' Pavement $2.96 $664.52
3909 Ohio Garden Road Res. 224.5' Curb & Gutter 2.44 547.78
$1,212.30
SOUTH SIDE OF STREET ROCKWOOD TERRACE
Elton I. Burks 1, 2, & 3 20 819.1' Adjusted to
1227 Ohio Garden Road Res. 758' Pavement $2.96 $2,243.68
758' Curb & Gutter 2.44 1,849.52
85 Sq. Ft. Driveway .80 68.00
$4,161.20
6
PROJECT NO. 104-24000-198, UNIT 3, QUAIL TRAIL FORM SHENNA BOULEVARD TO OHIO GARDEN ROAD -
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET ROCKWOOD TERRACE
Elton I. Burks 1, 2 20 86 Sq. Ft. Drive $ .80 $ 68.80
1227 Ohio Garden Road & 3 Res. $ 68.80
John B. Honts 4 20 80' Pavement $2.96 $236.80
1225 Ohio Garden Road Res. 80' Curb & Gutter 2.44 195.20
$ 432.00
TOTAL COST TO PROPERTY OWNERS . . . . . . . . $ 9,585.26
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . 6,407.72
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . $15,992.98
7
PROJECT NO. 104-24000-198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nd
STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement
on a six-inch thick lime stabilized subgrade, seven-inch high curb and eighteen-inch concrete
gutter so that the finished roadway will be thirty feet wide and by constructing six-inch
thick concrete driveways and four-foot wide concrete sidewalk where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF McCANDLESS STREET AND NW. LORAINE
NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING
W. A. Rutherford 24 214 140' Adjusted to
3300 W. Loraine Res. 100' Pavement $2.96 $296.00
100' Curb & Gutter 2.44 244.00
118 Sq. Ft. Drive, .80 94.40
$ 634.40
George Germain 1 214 140' Adjusted to
3301 NW. 29th Res. 100' Pavement $2.96 $296.00
100' Curb & Gutter 2.44 244.00
118 Sq. Ft. Drive .80 94.40
$ 634.40
NW. 29th STREET INTERSECTS
Tabernacle Baptist 24 215 140' Adjusted to
Church Res. 100' Pavement $2.96 $296.00
3300 NW. 29th St. 100' Curb & Gutter 2.44 244.00
140' Sidewalk 2.67 373.80
$ 913.80
Robert Wooten 1 215 140' Pavement $5.64 $789.60
3218 NW. 30th Comm. 140' Curb & Gtr. 2.44 341.60
118 Sq. Ft. Drive .80 94.40
$1,225.60
NW. 30th STREET INTERSECTS
Mrs. John Dickey 24 216 140' Pavement $5.64 $789.60
3016 Conejos Drive Comm. 140' Curb & Gtr. 2.44 341.60
$1,131.20
11
PROJECT NO. 104-24000-198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nd
STREET, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING
Morris E. Thomason 1 216 140' Adjusted to
3301 NW. 31st Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
118 Sq. Ft. Drive .80 94.40
$ 634.40
NW. 31st STREET INTERSECTS
G. R. Gordon 24 217 140' Adjusted to
Rt. 8, Box 681-H Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
118 Sq. Ft. Drive .80 94.40
$ 634.40
Rosen & Rosen Tract C 200' Pavement $2.96 $592.00
P.O. Box 4454 Res. 200' Curb & Gtr. 2.44 488.00
$1,080.00
NW. 32nd STREET INTERSECTS
C. H. Howell 12 190 140' Adjusted to
3223 NW. 32nd Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
$ 540.00
W. D. Tallant 13 190 140' Adjusted to
3224 NW. 31st Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
$ 540.00
NW. 31st STREET INTERSECTS
H. L. Krantz 12 191 140' Adjusted to
4419 Wichita Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
118 Sq. Ft. Drive .80 94.40
$ 634.40
12
PROJECT NO. 104-24000-198, UNIT 6, McCANDLESS STREET FROM NORTHWEST LORAINE TO NORTHWEST 32nc
STREET, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING
Paul Howell 13 191 140' Pavement $5.64 $789.60
2122 Loving Comm. 140' Curb & Gtr. 2.44 341.60
$1,131.20
NW. 30th STREET INTERSECTS
E. C. Underwood 12 192 140' Pavement $4.30 $602.00
3223 NW. 30th Comm. 140' Curb & Gtr. 2.44 341.60
$ 943.60
W. M. Clark 13 192 140' Adjusted to
3222 NW. 29th Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
118 Sq. Ft. Drive .80 94.40
$ 634.40
NW. 29th STREET INTERSECTS
A. P. Ticknor 12 193 140' Adjusted to
2013 Rockridge Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
118 Sq. Ft. Drive .80 94.40
$ 634.40
Ed Rhody 13 193 140' Adjusted to
3222 NW. Loraine Res. 100' Pavement $2.96 $296.00
100' Curb & Gtr. 2.44 244.00
118 Sq. Ft. Drive .80 94.40
$ 634.40
TOTAL COST TO PROPERTY OWNERS . . . . . . $12,580.60
TOTAL COST TO CITY OF FORT WORTH . . . . . . . 16,428.45
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . $29,009.35
13
PROJECT NO. 104-24000-198, UNIT 7: 29TH STREET FROM McCANDLESS STREET TO TITUS AVENUE, to be
improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch
thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide con-
crete gutter, so that the finished roadway will be thirty feet wide and by constructing six-
inch thick concrete driveways and four-foot wide concrete sidewalk where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE SOUTHWEST CORNER OF NW. 29TH STREET AND McCANDLESS STREET
SOUTH SIDE OF STREET ROSEN HEIGHTS, 2ND FILING
George Germain 1 & 214 100' Pavement $2.96 $296.00
3301 NW. 29th 2 Res. 100' Curb & Gutter 2.44 244.00
$540.00
Laverne Boolen 3 214 50' Pavement $2.96 $148.00
3315 NW. 29th Res. 50' Curb & Gutter 2.44 122.00
$ 270.00
Bert M. Lambert 4 214 50' Pavement $2.96 $148.00
1609 Norman Res. 50' Curb & Gutter 2.44 122.00
$ 270.00
Etta May Johnson 5 214 50' Pavement $2.96 $148.00
3309 Nw. 29th Res. 50' Curb & Gutter 2.44 122.00
$ 270.00
H. R. York 6 & 214 100' Pavement $2.96 $296.00
316 Bailey 7 Res. 100' Curb & Gutter 2.44 244.00
Suite 112 $ 540.00
Ace Connell 8 214 50' Pavement $2.96 $148.00
3315 NW. 29th Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway .80 94.40
$ 364.40
14
PROJECT NO. 104-24000-198, UNIT 7: 29TH STREET FROM McCANDLESS STREET TO TITUS AVENUE,
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET ROSEN HEIGHTS, 2ND FILING
W. E. Hill 9 214 50' Pavement $2.96 $148.00
3317 NW 29th Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway .80 94.40
$ 364.40
James E. Collins 10 214 50' Pavement $2.96 $148.00
253 Spreading Oak Res. 50' Curb & Gutter 2.44 122.00
Houston, Texas 70022 118 Sq. Ft. Driveway .80 94.40
$ 364.40
Frank A. Blair 11 214 50' Pavement $2.96 $148.00
3321 NW 29th Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway .80 94.40
$ 364.40
Orville S. Looper 12 214 50' Pavement $2.96 $148.00
3323 NW. 29th Res. 50' Curb & Gutter 2.44 122.00
$ 270.00
TITUS STREET INTERSECTS
NORTH SIDE OF STREET
Odell Carver 13 215 50' Pavement $2.96 $148.00
3322 NW. 29th Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway .80 94.40
$ 364.40
Lee Shell 14 215 50' Pavement $2.96 $148.00
3320 NW. 29th Res. 50' Curb & Gutter 2.44 122.00
194 Sq. Ft. Driveway .80 155.20
$ 425.20
15
PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE,
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING
Alvie T. Stegall 15 215 50' Pavement $2.96 $148.00
3316 NW. 29th Res. 50' Curb & Gtr. 2.44 122.00
$270.00
Thelma Epp Stegall 16 215 50' Pavement $2.96 $148.00
3316 NW. 29th Res. 50' Curb & Gtr. 2.44 122.00
118 Sq. Ft. Drive .80 94.40
$364.40
W. D. Andrews 17 215 50' Pavement $2.96 $148.00
3310 NW. 29th Res. 50' Curb & Gutter 2.44 122.00
$270.00
W. D. Andrews 18, 19 215 150' Pavement $2.96 $444.00
3310 NW. 29th & 20 Res. 150' Curb & Gtr. 2.44 366.00
118 Sq. Ft. Drive .80 94.40
$904.40
Sidney B. Beaty 21 215 50' Pavement $2.96 $148.00
3306 NW. 29th Res. 50' Curb & Gtr. 2.44 122.00
194 Sq. Ft. Drive .80 155.20
$425.20
Arlington Savings 22 215 50' Pavement $2.96 $148.00
Association Res. 50' Curb & Gtr. 2.44 122.00
P.O. Box 869 118 Sq. Ft. Drive .80 94.40
Arlington, Texas $364.40
16
PROJECT NO. 104-24000-198, UNIT 7, 29th STREET FROM McCANDLESS STREET TO TITUS AVENUE,
CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET ROSEN HEIGHTS 2nd FILING
Tabernacle Baptist 23 & 215 100' Pavement $2.96 $296.00
Church 24 Res. 100' Curb & Gtr. 2.44 244.00
3300 NW. 29th 100' Sidewalk 2.67 267.00
$807.00
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . $ 7,812.60
TOTAL COST TO CITY OF FORT WORTH . . . . . . . 5,993.60
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . $13,806.27
17
PROJECT NO. 104-24000-198, UNIT 8. NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN
AVENUE, to be improved by constructing six-inch thick hot-mix asphaltic concrete pavement
on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-
inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by
constructing six-inch thick concrete driveways where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE SOUTHWEST CORNER OF TITUS AVENUE AND NW. LORAINE STREET
SOUTH SIDE OF STREET ROSEN HEIGHTS, 2ND FILING
Louise Watson 1 & 2 224 100' Pavement $2.96 $296.00
3305 NW. Loraine Res. 100' Curb & Gutter 2.44 244.00
$ 540.00
Jesse Smith 3 224 50' Pavement $2.96 $148.00
3204 Prospect Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway.80 94.40
$ 364.40
C. B. McWhirter 4 224 50' Pavement $2.96 $148.00
3407 NW. Loraine Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway.80 94.40
$ 364.40
Johnson-Campbell 5 224 50' Pavement $2.96 $148.00
Lumber Co. Res. 50' Curb & Gutter 2.44 122.00
P.O. Box 10248 118 Sq. Ft. Driveway.80 94.40
$ 364.40
World Baptist 6 224 50' Pavement $2.96 $148.00
Fellowship Res. 50' Curb & Gutter 2.44 122.00
3001 W. Division 118 Sq. Ft. Driveway.80 94.40
Arlington, Texas $ 364.40
18
PROJECT NO. 104-24000-198, UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN
AVENUE, CONTINUED
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET ROSEN HEIGHTS, 2ND FILING
Eldon Beam 7 224 50' Pavement $2.96 $148.Ou
3413 NW. Loraine Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway.80 94.40
$ 364.40
Lillie Clark 8 224 50' Pavement $2.96 $148.00
3415 NW. Loraine Res. 50' Curb & Gutter 2.44 122.00
$ 270.00
W. L. Sisk 9 224 50' Pavement $2.96 $148.00
1403 Sloan Street Res. 50' Curb & Gutter 2.44 122.00
Weatherford, Texas 118 Sq. Ft. Driveway.8u 94.40
$ 364.40
M. W. Sturdivant 10, 11 224' 150' Pavement $2.96 $444.00
3423 NW. Loraine & 12 Res. 140' Curb & Gutter 2.44 341.60
$ 785.60
SHERMAN AVENUE INTERSECTS
NORTH SIDE OF STREET
Mrs. R. Long 13 & 14 223 100' Pavement $2.96 $296.00
3307 NW. Loraine Res. 100' Curb & Gutter 2.44 244.00
$ 540.00
I. C. Canup 15 & 16 223 100' Pavement $2.96 $296.00
3416 NW. Loraine Res. 90' Curb & Gutter 2.44 219.60
118 Sq. Ft. Driveway.80 94.40
$ 610.00
19
PROJECT NO, 104-24000-198, UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN
AVENUE, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET ROSEN HEIGHTS, 2ND FILING
J. W. Barnes 17 223 50' Pavement $2.96 $148.00
c/o H. R. York Res. 50' Curb & Gutter 2.44 122.00
Investment Co. 118 Sq. Ft. Driveway.80 94.40
316 Bailey $ 364.40
J. C. Uselton 18 223 50' Pavement $2.96 $148.00
c/o Midway Savings Res. 50' Curb & Gutter 2.44 122.00
Arlington, Texas 118 Sq. Ft. Driveway.80 94.40
$ 364.40
J. T. Patman 19 223 50' Pavement $2.96 $148.00
2808 NW. 30th Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway.80 94.40
$ 364.40
Ruth Whiteman 20 223 50' Pavement $2.96 $148.00
544 Brown Terrace Res. 50' Curb & Gutter 2.44 122.00
Hurst, Texas 118 Sq. Ft. Driveway.80 94.40
$ 364.40
Ray Fowler 21 223 50' Pavement $2.96 $148.00
3406 NW. Loraine Res. 50' Curb & Gutter 2.44 122.00
118 Sq. Ft. Driveway.80 94.40
$ 364.40
Warren Myers 22 & 223 110' Pavement $2.96 $296.00
3404 NW. Loraine 23 Res. 100' Curb & Gutter 2.44 244.00
118 Sq. Ft. Driveway.80 94.40
$ 634.40
20
PROJECT NO. 104-24000-198, UNIT 8, NORTHWEST LORAINE STREET FROM TITUS AVENUE TO SHERMAN
AVENUE, CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET ROSEN HEIGHTS, SECOND FILING
Cal R. Rice 24 223 50' Pavement $2.96 $148.00
3400 NW. Loraine Res. 50' Curb & Gtr. 2.44 122.00
118 Sq. Ft. Drive .80 94.40
$364.40
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . $ 7,752.80
TOTAL COST TO CITY OF FORT WORTH . . . . . . . 7,532.75
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . $15,285.55
21
City of Dort Worth, Texas
LINE
Mayor and Council Communication
DATE REFERENCE SUBJECT: Final Payment - Assessment PAGE
9 NUMBER Paving at Eight Locations on the 2
1/18/71 FP-772 Northwest Side 1of
Final Council action on the project described below is requested.
Project Description
Name: Assessment Paving at Eight Locations on the
Northwest Side, Project Number 104-24000-198
Contractor: S.R.O. Asphalt, Inc.
Contract Awarded: February 9, 1970
Work Order Issued: June 23, 1970
Work Order Effective: July 3, 1970
Date of Final Inspection
and Approval: November 10, 1970
Working Time Bid: 145 Working Days
Working Time Used: 86 Working Days
Project Cost and Financing
Original Bid Price: $146,310.75
Change Order No. 1: -$ 34,.188.50 (M&C G-1516, 3/9/70, Delete sidewalks
on Unit 1 and all of Units 4 and 5)
Change Order No. 2: -$ 1,868.63 (A.R. 1-15, 2.2 12/19/70, temporary
deletion of HMAC surface on Unit 3,
Quail Trail)
Revised Bid Price: $110,2,53.62
Final Contract Cost: $ 97,419.31
Partial Payments Previously Made: 5 Amount: $87,677.38
Final Payment Due: $ 9,741.93
Sufficient funds are available for the final payment to be made from Project
Account Number 104-24000-198.
Deviation from Bid Price: The final cost of this project is $12,834.31 under
the revised bid price. This under-run was caused primarily by the following:
1) The necessity for fewer utility adjustments than anticipated,
which resulted in a savings of $2,363.02, and
2) The elimination of a 6 inch metal pipe subdrain, which resulted in a
savings of $8,250.
The remainder of this cost difference, $2,221.29 is attributed to minor
variations between quantities estimated in the contract 'documents and
quantities actually measured and used at the job site.
DATE REFERENCE SUBJECT: Final Payment - Assessment PAGE
NUMBER Paving at Eight Locations on th 2 Of 2
1/18/71 FP-772 Northwest Side
Compliance with Specifications
During testing on this project 34 corings were made with the following results:
Units 1,2,6,7 & 8 (6" HMAC, 6" Stabilized sub-grade) 30 corings
Exceeds Even with Below Specs but Below
Specs Specs Within Tolerance Tolerance
Paving 22 4 4 0
Sub-grade 14 16 0 0
On these units the average thickness of the hot-mix asphaltic concrete paving
is 6.26 inches as compared to the 6.00 inches specified, and the average thick-
ness of the stabilized sub-grade is 6.10 inches as compared to the 6.00 inches
specified.
Unit 3, Quail Trail, cannot be completed until after the Water Department has
completed installation of a planned sanitary sewer. Therefore, only the binder
has been laid. The surface will not be laid until after completion of the
sanitary sewer installation.
The binder and stabilized sub-grade on Unit 3 were cored and the results were
as follows:
Unit 3 (43V" HMAC Binder, 6" stabilized sub-grade) 4 corings.
Exceeds Even with Below Specs but Below
Specs Specs Within Tolerance Tolerance
Binder 4 0 0 0
Sub-grade 4 0 0 0
On Unit 3 the average thickness of the hot-mix asphaltic binder is 4.75 inches
as compared to the 4.50 inches specified, and the average thickness of the
stabilized sub-grade is 6.16 inches as compared to the 6.00 inches specified.
Tests made during construction show that materials used were in compliance with
specifications.
Recommendation
It is recommended that the adjacent property owners on Unit 3 not be required
to pay their assessment cost until Quail Trail is completed and that the pro-
ject described above be accepted by the adoption of an ordinance and that
final payment of $9,741.93 be authorized to SRO Asphalt, Inc.
HDM:ms