APR 2'- 2020 AMENDMENT No.2 CSC No.45859-A2
C111'0R FORT WORTH
CITY SECRETARY
TO CITY SECRETARY CONTRACT No.
45859
WHEREAS, the City of Fort Worth (CITY) and Multatech
Engineering, Inc. (ENGINEER) made and entered into City Secretary
Contract No. 45859, (the CONTRACT) which was authorized by M&C C-
26856 on the 15th day of July, 2014 in the amount of $ 1, 800, 000 .00;
and
WHEREAS, the CONTRACT was subsequently revised by: Amendment
Number 1 in the amount of $48, 500 . 00 which was administratively
authorized on May 24, 2019; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Timberland Phase 1-3; and
WHEREAS, it has become necessary to execute Amendment No. 2 to
the CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated December 17, 2019,
a copy of which is attached hereto and incorporated herein. The cost
to City for the additional design services to be performed by
Engineer totals $28,865. 00. (See Attached Funding Breakdown Sheet,
Page -3-)
2 .
Article II of the CONTRACT is amended to provide for an increase
in the fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the
City for all work and services shall be an amount of $1,877,365. 00.
3 .
City of Fort Worth OFFICIAL RECORD
Professional Services Agreement Amendment Template
CFW Official Release 9/19/2017 CITY SECRETARY
Page 1 of FT WORTH, TX
1
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED:
City of Fort Worth ENGINEER
Mult:atech Engineering;
Gana ar� Inc.
Dana Burghdoff pr27,20201 xp/��J&4
Dana Burghdoff Paul J. adilla
Assistant City Manager Vice President
DATE: Apr27, 2020 DATE: 1-16-2020
APPROVAL RECOMMENDED:
Wi[Uar0 Jo son(Apr 23,2020)
William Johnson
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring
all performance and reporting requirements .
Raul Lopez
Engineering Manager
APPROVED AS TO FORM AND LEGALITY: M&C. N/A
Date: N/A
DBLack(Apr27,2020)
Douglas W. Black
Assistant City Attorney
Q,
OR�
ATTEST: �
r i
Mary J. Kayser
City Secretary A
City of Fort Worth OFFICIAL RECORD
i
Professional Services Agreement Amendment Template CITY SECRETARY
CFW Official Release 9/19/2017 4
Page 2 of 3 FT. WORTH,TX
FUNDING
BREAKDOWN
SHEET
City Secretary No. 45859
Amendment No . 2
Department Fund-Account-Center Amount
TPW 34014-0200431-5330500-0O2288-0O2330-2015-14010199$28, 865. 00
$28, 865. 00
Total:
3AE
■ M U LTAT E C H
■ ARCMITECTS@ENGIIVEERS
2821 West 7th Street.Suite 4GO. Fort Worth.Texas 75107-22191
Phone 817-877-5571•Fax:817-877-4245• www.multatech.com
December 17, 2019
Mr. J.T. Auldridge
Transportation and Public Works Department
City of Fort Worth
200 Texas Street, Fort Worth, TX 76102
Re: Timberland Boulevard-Contract Amendment 2-Construction Services- Temporary
Traffic Signal Design, Preparation of Record Drawings
Mr. Aulldridge:
This letter is written to request additional services for the performance of Unanticipated
Construction Services-Temporary Signal Design.
The design of a temporary signal design was not included in our original scope and fee.
At the request of the City MULTATECH subcontracted with our Traffic Signal Consultant
(CK Group) to perform these services.
Scope of Services
1. Review Signal Phasing
2. Coordination with TxDOT for temporary signal at US-377
3. Issue Revised Drawings showing signal Phasing
4. Record Drawings from Contractors Redlines and Officially Issued Revisions.
Task Order Summary
Original Task Order Amount $1,800,000.00
Amendment 1 As-Built SUE $ 48,500.00
Amount of this request $ 28,865.00
Revised Contract Amount $1,877,365.00
If you have any questions or need any additional input as to the Scope of Work or the associated
fee, you may reach me at ppadilla(aD-multatech.com or 817-289-2060.
Sincerely,
qAi924t'
Paul J. Padilla, P.E.
Vice President
MULTATECH
ACCEPTANCE:
The City of Fort Worth hereby accepts the proposal outlined above and does hereby
engage Multatech to perform the Services described above on the terms and conditions
set forth in the Original Master Services Agreement.
City of Fort Worth
By:
q------
Printed Name: Raul E Lopez
Title: Program Manager-Arterials Capital Delivery
Date: Apr20,2020