HomeMy WebLinkAboutContract 50812-CO2 FORT WORTH City of Fort Worth CSC No.50812-CO2
1�. Change Order Request
Project Name Randal Mill Road-Sanitary Sewer,Paving&Drainage Improvements(Part 2) City Sec# 50812
Client Project#(s) 100278
Project Randol Mill Road at Precint Line Street Improvements
Desuiptioni I
Contractor Texasbit-JLB Change Order# 2 Date 419I2020
City Project Mgr. Chad Allen City Inspector Jesse Guptin
Contract Time
Dept. TPW Totals (CD)
Original Contract Amount $1,153,756.71 $1,153,756.71 300
Extras to Date $211,022.99 $211,022.99 30
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $1,364,779.70 $1.364,779.70 330
Amount of Proposed Change Order $43,294.80 $43,294.80
Revised Contract Amount $1,408,074.50 $1,408,074.50 330
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary) r $43,294.80 $43,294.80
CHANGE ORDERS to DA TE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 22.04%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,442,195.89
FOR CHANGE ORDER
During Construction it was discovered that the storm drain culvert was inclose proximity to the existing 42 inch sanitary sewer line.The City requested a concrete cap to protect
the line.Additionally there is an existing power pole that is surrounded by trees called out to be removed.With the lines being hot OnCor has to remove the trees that are close
to the power lines followed by TexasBit hiring a speciI4 tree removal subcontractor to remove the rest of the trees.Finally,additional Type B ashpalt was put in place to
increase the slope from south to north across the roundabout in order to facilitate better surface drainage.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting
requirements.
Contractor's.ftp Name Contractor Contract Date
lfrsW,torIlnsp%*ni Supervisor Daw, row n erl tsrts M ianager
Assistant Director PA Date ,OetltraO"Daparimerilt(D Dalei
t�tytuey A1� f�
4-- M&C Number 0 M&C Date Approved
pp�2�2�20 OFFiCA
C\N OF FFC LRjr)n 11CITY SECRE'Ek'"'t
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Chad Allen / uaul,
Name of Employee/Signature
Senior Professional Engineer
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
�'QORr .
ATTEST: ® 'A��;
X :* f!
Mary J.Kayser,City Secretary '
7'�CP
City of Fort Worth
Change Order Additions
Project Name I Randol Mill Road-Sanitary Sewer,Paving&Drainage Improvements Part 2 City Sec# 50812
Client Project# 100 778
Contractor Texasbit-JLB PMC Chad Allen Inspector[ Jess Guptin ]
Change Order Submittal# E 2 Date [ 4/9/2020
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
CO2-1 Concrete Cap for Sewer Crossing .00000000 ,900.00 ,900.00
CO2-2 Tree Removal around Power Pole TPW 1.00000000 LS 2,750.00 2,750.00
CO2.3 Additional Type B Asphalt TPW 940.00000000 SY $37.973 ,6 .80
TPW $43,294.80
Sub Total Additions 43,294.80
Change Order Additions Page 2 of 4
FORT WMI"H City of Fort Worth
11r-- Change Order Deletions
Project Name I Randol Mill Road-Sanitary Sewer,Paving&Drainage Improvements Part 2 City Sec# 5D812
Client Project# F 100 778
Contracto Texasbit-JLB PMC Chad AIIen Inspector[ Jess Guptin 1
Change Order Submittal# 2 D Date 4/9/2020 I J
DELETIONS
y nit nit ost ota
TPW 0.00
Sub TotalDeletions D.DD
Change Order Deletions Page 3 of 4
MISBE for this Change Order
MISBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
BIM 360 Document Management Page I of 2
B AUTODESK BIM 360' fortworthgov>100278-2-Randol Mill Road Roundabout(Precinct Line Rd.to Stoneview Circle)- 9 CA
Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES
Reviews > Review detail
CLOSED #26 Change Order Approval Workflow
Export Report , This review is closed.
Name� Approval status PROGRESS
DOC-CSN 50812-CO 2 Randol Mill Road Ph 2-20200409-RO2.pdf `✓'Approved
Initiator Initial Review n
13 XL-CSN 50812-CO 2 Randol Mill Road Ph 2-20200409-RO2.xlsm L Approved CA Chad Allen Apr 9,10:32 AM
<chad.allen @fortwort htexas.gov s
Submitted to Reviewed
Reviewer 1 Initial Review 1 n
MW Martin Wigg Apr 9,10:57 AM
<mwigg @j Ibcontracd ng.com,
Submitted to Reviewer 2
Reviewer 2 Initlal Review 2 n
LA Lissette Acevedo Apr 9,11:27 AM
<lissette.acevedo@fortworthtexas.gov,
Submitted to Reviewer 3
approved,
Lissette
Reviewer Initial Review3 n
LP Lauren Prieur Apr 9,1:51 PM
<la u ren.prleu r@fortworthtexas.gov,
Submitted to Reviewer 4
No comments
Reviewer 4 Initial Review 4 n
WJ William Johnson Apr 17,9:42 AM
<william.johnson@fortworthtexas.gov>
Submitted to Reviewer 5
Appears to still be within allowable
contract amount.
OK Show more
Reviewer 5 Initial Review 5 n
DB Douglas Black Apr 17,2:11 PM
<doug.black@fortworthtexas.gov,
Submitted to Approver
Approved.
CMO Authority:24161-04-2020
Approver Final Review n
DB Dana Burghdoff Apr 17,4:50 PM
<dana.burghdoff@fortworthtexas.gov,