HomeMy WebLinkAboutContract 50812-CO2 FORT WORTH City of Fort Worth CSC No.50812-CO2 1�. Change Order Request Project Name Randal Mill Road-Sanitary Sewer,Paving&Drainage Improvements(Part 2) City Sec# 50812 Client Project#(s) 100278 Project Randol Mill Road at Precint Line Street Improvements Desuiptioni I Contractor Texasbit-JLB Change Order# 2 Date 419I2020 City Project Mgr. Chad Allen City Inspector Jesse Guptin Contract Time Dept. TPW Totals (CD) Original Contract Amount $1,153,756.71 $1,153,756.71 300 Extras to Date $211,022.99 $211,022.99 30 Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,364,779.70 $1.364,779.70 330 Amount of Proposed Change Order $43,294.80 $43,294.80 Revised Contract Amount $1,408,074.50 $1,408,074.50 330 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) r $43,294.80 $43,294.80 CHANGE ORDERS to DA TE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 22.04% MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $1,442,195.89 FOR CHANGE ORDER During Construction it was discovered that the storm drain culvert was inclose proximity to the existing 42 inch sanitary sewer line.The City requested a concrete cap to protect the line.Additionally there is an existing power pole that is surrounded by trees called out to be removed.With the lines being hot OnCor has to remove the trees that are close to the power lines followed by TexasBit hiring a speciI4 tree removal subcontractor to remove the rest of the trees.Finally,additional Type B ashpalt was put in place to increase the slope from south to north across the roundabout in order to facilitate better surface drainage. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Contractor's.ftp Name Contractor Contract Date lfrsW,torIlnsp%*ni Supervisor Daw, row n erl tsrts M ianager Assistant Director PA Date ,OetltraO"Daparimerilt(D Dalei t�tytuey A1� f� 4-- M&C Number 0 M&C Date Approved pp�2�2�20 OFFiCA C\N OF FFC LRjr)n 11CITY SECRE'Ek'"'t Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Chad Allen / uaul, Name of Employee/Signature Senior Professional Engineer Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature �'QORr . ATTEST: ® 'A��; X :* f! Mary J.Kayser,City Secretary ' 7'�CP City of Fort Worth Change Order Additions Project Name I Randol Mill Road-Sanitary Sewer,Paving&Drainage Improvements Part 2 City Sec# 50812 Client Project# 100 778 Contractor Texasbit-JLB PMC Chad Allen Inspector[ Jess Guptin ] Change Order Submittal# E 2 Date [ 4/9/2020 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total CO2-1 Concrete Cap for Sewer Crossing .00000000 ,900.00 ,900.00 CO2-2 Tree Removal around Power Pole TPW 1.00000000 LS 2,750.00 2,750.00 CO2.3 Additional Type B Asphalt TPW 940.00000000 SY $37.973 ,6 .80 TPW $43,294.80 Sub Total Additions 43,294.80 Change Order Additions Page 2 of 4 FORT WMI"H City of Fort Worth 11r-- Change Order Deletions Project Name I Randol Mill Road-Sanitary Sewer,Paving&Drainage Improvements Part 2 City Sec# 5D812 Client Project# F 100 778 Contracto Texasbit-JLB PMC Chad AIIen Inspector[ Jess Guptin 1 Change Order Submittal# 2 D Date 4/9/2020 I J DELETIONS y nit nit ost ota TPW 0.00 Sub TotalDeletions D.DD Change Order Deletions Page 3 of 4 MISBE for this Change Order MISBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders CO# DATE AMOUNT Total $0.00 BIM 360 Document Management Page I of 2 B AUTODESK BIM 360' fortworthgov>100278-2-Randol Mill Road Roundabout(Precinct Line Rd.to Stoneview Circle)- 9 CA Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES Reviews > Review detail CLOSED #26 Change Order Approval Workflow Export Report , This review is closed. Name� Approval status PROGRESS DOC-CSN 50812-CO 2 Randol Mill Road Ph 2-20200409-RO2.pdf `✓'Approved Initiator Initial Review n 13 XL-CSN 50812-CO 2 Randol Mill Road Ph 2-20200409-RO2.xlsm L Approved CA Chad Allen Apr 9,10:32 AM <chad.allen @fortwort htexas.gov s Submitted to Reviewed Reviewer 1 Initial Review 1 n MW Martin Wigg Apr 9,10:57 AM <mwigg @j Ibcontracd ng.com, Submitted to Reviewer 2 Reviewer 2 Initlal Review 2 n LA Lissette Acevedo Apr 9,11:27 AM <lissette.acevedo@fortworthtexas.gov, Submitted to Reviewer 3 approved, Lissette Reviewer Initial Review3 n LP Lauren Prieur Apr 9,1:51 PM <la u ren.prleu r@fortworthtexas.gov, Submitted to Reviewer 4 No comments Reviewer 4 Initial Review 4 n WJ William Johnson Apr 17,9:42 AM <william.johnson@fortworthtexas.gov> Submitted to Reviewer 5 Appears to still be within allowable contract amount. OK Show more Reviewer 5 Initial Review 5 n DB Douglas Black Apr 17,2:11 PM <doug.black@fortworthtexas.gov, Submitted to Approver Approved. CMO Authority:24161-04-2020 Approver Final Review n DB Dana Burghdoff Apr 17,4:50 PM <dana.burghdoff@fortworthtexas.gov, Review ended Review close FNQA� EUa%k' ;- . CITY SECRETARY F`. WORTH,Tt u https://docs.b360.autodesk.com/projects/6Od9b l c l-49c8-4c26-985b-c3Oe739e2d32/review... 4/24/2(12(1