Loading...
HomeMy WebLinkAboutContract 51649-CO1 CSC No.51649-COI FORT WORTH City of Fort Worth Change Order Request Breakdown ProjectNamel Sic Points Urban Village Phase 2 Streetscape Improvements City Sec# Client Project#(s)l 00705 Contractorl The Fain Group,Inc. PM I Chad Allen Inspectorl Stanley Sutterf'ield Change Order Submittal# Date 3l20l2020 Contract Time Dept. TPW Totals D Original Contract Amount $2,208,428.25 $2,208,428.25 180 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $2,208,428.25 $2,208,428.25 180 Amount of Proposed Change Order -$3,297.60 -$3,297.60 30 Revised Contract Amount 2,205,130.65 $2,205,130.65 210 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding(if necessary) CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,760,535.31 �A71ION(11EA5014S) R CHCHANGE ORD E R The proposed saff z sigr.F•at FU::e Steet and S-xIya;ia Avenue t,�f5 I r rev se:per prardcd by C:fy of For.Garth slaff t he orrg.:°a'taiFc signal desor.was no longer desired by City staff;therefore,the design was revised per City staff direction. This resulted in a change to the quantities for the various traffic signal bid items. Requested landscape planting revisions(primarily a reduction in the number of plants)by the City Parks and Recreation department are included in this change order. One of the project goals is to relocate the overhead AT&T lines to underground.It was anticipated that AT&T would require underground conduit for their copper and fiber optic cables.The City's contractor is to install the underground conduit and utility boxes needed to allow AT&T to install the underground cables without AT&T having to remove pavement and install pavement repairs. AT&T completed their relocation design after the project bid. Once AT&T completed their design AT&T noted the City that additional utility boxes(Brooks closer and handholes)were required for the relocation of ovehead lines to underground.AT&T provided the quantities in this change order to the project team. There is an adjancent developement,"The Presidio at Oakhurst Scenic Drive and Race Street"under construction at the northeast comer of the interesection of Race Street and Oakhurst Scenic Drive. This developement is constructing a retaining wall along the north ROW line of Race Street;therefore,the retaining wall at the same location proposed by this project is deleted from the contract with this change order. Additional revisions to the design were necessary to aaromodate the adjacent developement. The addtional revisions included shifting and increasing the size of the developement's proposed driveway connection to Race Street as well as shiftiing the landscape planting beds and light poles to maintain desirable spacing of these elements. Two existing abandoned sign poles within the project area have been added to the removal work for this project. Additioinal tree planting and irrigation along Race Street between Grace Street and Belknap is being added to the project at the request of City management. F APRC�jV�D crry � 28 2020 C/7ySFCAEr Ro�rH Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Chad Allen / U&6uc2" Name of Employee/Signature Senior Professional Engineer Title ❑ This form is N/A as No City Funds are associated with this Contract 1 Printed Name Signature �.f°��` ` ATTEST: Mary J.Kayser,City Secretary * ' O FFICIAL RECORD� CRETARY TX � City of Fort worth Change Order Additions Project Name Six Points Urban Village Phase 2 Streetscape Improvements City Sec# O Client Project# 00705 Contracto The Fain Group,Inc. PM Chad Allen Inspector Stanley Sutter0eld Change Order Submittal# Date 3120/2020 ADDITIONS y Unit Unito ecesse Inlet one Sidewalk,Adjacento Curb Furnish/Ins Furnish/Install HybridDetection Cable Furnish/Ins Furnish/Install Modle 711 Preemption Detector u i- on uc or Cable u i- on uc or Cable Aulti-Concluctor Cable u i- on uc or Cable Insulated Eec Condr --c7— Ground Box Type D,w pron 14 Ground Box Type B,w pron Furnish/Ins Furnish/Install Type 41 Signale 1-umism/instaii I ype 42 Signale 17 Furnish/Ins tall Mast Arm Signal oun a on 1.00000000 Furnish/Ins Furnish/Install Alum Sign Mast Arm Mount 20 Furnish/Ins Furnish/Install Clamp on Sign Support 21 Powder Coat Sig Pole an are Llec Condr Insulated Eec Condr Handhole a or Only)(Material provided by Brooks Closure x x a or n y (Material y 28 River Rock Aggregate Water Meter Box one 317—Water Meter Box(Plastic) on uc or 32— a er ine Lowering Temporary Water Services 1.00000000 Remove Abandoned Poles 35 Trees and Irrigation Improvements various areas Trom Urace St.to Belknap on TPW 179,870.45 Sub Totali ions Change Order Additions Page 2 of 4 FnK�R]H City of Fort Worth Change Order Deletions Project Name Six Points Urban Village Phase 2 Streetscape Improvements City Sec# 0 Client Project# 00705 Contractor The Fain Group,Inc. PM Chad Allen Inspector Stanley Sutterfield Change Order Submittal# Date 312012020 OtLtIlON5 Unit UnitCost Total Conc.Rat Wallwith i ewa ,Face Conc.Rat Wallwith i ewa ,Sidewalk Furnishlinstall ModelPreemption Detector Furnishlinstall Preemption Cable Multi-conductor a e Insulated Eec on r Bare Elec Candr Furnishlinstall 1 ype 4b Signaloe Powder Coat Sig Pole an 15 Tree a Shrubsand OrnamentalGrasses i e ac enc Bond TPW 183,1 88.05 Sub Totale e ions Change Order Deletions Page 3 of 4 MISBE Breakdown for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 BIM 360 Document Management Page 1 of 2 B AUTODESK'BIM 360 fortworthgov;C00705-2-Six Points Urban Village Streetscape Phase II- A CA Document Management FOLDERS REVIEWS. TRANSMITTALS ISSUES Reviews > Reviewdetail CLOSED #28 Change Order Approval Workflow Export Report - This review is closed. Name Approval status PROGRESS e DOC-000705-CO1 Six Points Phase 2-20200320-ROO.pdf Approved Initiator Initial Review n p XL-000705-CO1 Six Points Phase 2-20200320-ROO.xlsm Approved CA Chad Allen Mar 20,2:59 PM <chad.allen@furtworthtexas.gov> Submitted to Reviewer 1 Reviewerl Initial Revewl n NS Noel Sanchez Mar27,9:27AM <nsa nchez@fai ngp.com> Submitted to Reviewer 2 Reviewerl Initial Revew2 n LA Lissette Acevedo Mar 27,9:55 AM -tissette.acevedo@fortworth texas.gov> Submitted to Reviewer 3 approved Reviewer 3 Initial Review 3 n LP Lauren Prieur Mar 27,10:17 AM i <lau ren.pri eu r@fo rtwort htexas.g ov> Submitted to Reviewer 4 No comments Reviewer 4 Initial Review 4 n LP Lauren Prieur Mar27,10:25 AM <lau ren.prieu r@fortwo rthtexas.gov> Submitted to Reviewer 5 no comments Reviewers Initial RevewS n DB Douglas Black Apr 16,5:42 PM <doug.b la ck@fo rtwo rthtexas.g ov> Submitted to Approver approved. Approver Final Review n DB Dana Burghdoff Apr 17,10:04 AM <da na.burghdoff@fortworthtexas.gov> Review ended OFFICIAL RECORD i < CITY SECRETARY FT. WORTH, X i r https://docs.b360.autodesk.com/projects/958011 al-2d6f-41 a3-afab-ecf2b8470486/reviews/... 4/24/2020