Change Order Request Breakdown
ProjectNamel Sic Points Urban Village Phase 2 Streetscape Improvements City Sec#
Client Project#(s)l 00705
Contractorl The Fain Group,Inc. PM I Chad Allen Inspectorl Stanley Sutterf'ield
Change Order Submittal# Date 3l20l2020
Contract Time
Dept. TPW Totals D
Original Contract Amount $2,208,428.25 $2,208,428.25 180
Extras to Date
Credits to Date
Pending Change Orders(in M&C Process)
Contract Cost to Date $2,208,428.25 $2,208,428.25 180
Amount of Proposed Change Order -$3,297.60 -$3,297.60 30
Revised Contract Amount 2,205,130.65 $2,205,130.65 210
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $2,760,535.31
�A71ION(11EA5014S) R CHCHANGE ORD E R
The proposed saff z sigr.F•at FU::e Steet and S-xIya;ia Avenue t,�f5 I r rev se:per prardcd by C:fy of For.Garth slaff t he orrg.:°a'taiFc signal desor.was no
longer desired by City staff;therefore,the design was revised per City staff direction. This resulted in a change to the quantities for the various traffic signal bid items.
Requested landscape planting revisions(primarily a reduction in the number of plants)by the City Parks and Recreation department are included in this change order.
One of the project goals is to relocate the overhead AT&T lines to underground.It was anticipated that AT&T would require underground conduit for their copper and fiber
optic cables.The City's contractor is to install the underground conduit and utility boxes needed to allow AT&T to install the underground cables without AT&T having to
remove pavement and install pavement repairs. AT&T completed their relocation design after the project bid. Once AT&T completed their design AT&T noted the City that
additional utility boxes(Brooks closer and handholes)were required for the relocation of ovehead lines to underground.AT&T provided the quantities in this change order to
the project team.
There is an adjancent developement,"The Presidio at Oakhurst Scenic Drive and Race Street"under construction at the northeast comer of the interesection of Race Street
and Oakhurst Scenic Drive. This developement is constructing a retaining wall along the north ROW line of Race Street;therefore,the retaining wall at the same location
proposed by this project is deleted from the contract with this change order. Additional revisions to the design were necessary to aaromodate the adjacent developement.
The addtional revisions included shifting and increasing the size of the developement's proposed driveway connection to Race Street as well as shiftiing the landscape
planting beds and light poles to maintain desirable spacing of these elements.
Two existing abandoned sign poles within the project area have been added to the removal work for this project.
Additioinal tree planting and irrigation along Race Street between Grace Street and Belknap is being added to the project at the request of City management.
F
APRC�jV�D
crry � 28 2020
C/7ySFCAEr Ro�rH
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Chad Allen / U&6uc2"
Name of Employee/Signature
Senior Professional Engineer
Title
❑ This form is N/A as No City Funds are associated with this Contract
1
Printed Name Signature
�.f°��` `
ATTEST:
Mary J.Kayser,City Secretary * '
O
FFICIAL RECORD�
CRETARY
TX �
City of Fort worth
Change Order Additions
Project Name Six Points Urban Village Phase 2 Streetscape Improvements City Sec# O
Client Project# 00705
Contracto The Fain Group,Inc. PM Chad Allen Inspector Stanley Sutter0eld
Change Order Submittal# Date 3120/2020
ADDITIONS
y Unit Unito
ecesse Inlet
one Sidewalk,Adjacento Curb
Furnish/Ins Furnish/Install HybridDetection Cable
Furnish/Ins Furnish/Install Modle 711 Preemption Detector
u i- on uc or Cable
u i- on uc or Cable
Aulti-Concluctor Cable
u i- on uc or Cable
Insulated Eec Condr
--c7—
Ground Box Type D,w pron
14 Ground Box Type B,w pron
Furnish/Ins Furnish/Install Type 41 Signale
1-umism/instaii I ype 42 Signale
17 Furnish/Ins tall Mast Arm
Signal oun a on 1.00000000
Furnish/Ins Furnish/Install Alum Sign Mast Arm Mount
20 Furnish/Ins Furnish/Install Clamp on Sign Support
21 Powder Coat Sig Pole an
are Llec Condr
Insulated Eec Condr
Handhole a or Only)(Material provided by
Brooks Closure x x a or n y (Material y
28 River Rock Aggregate
Water Meter Box one
317—Water Meter Box(Plastic)
on uc or
32— a er ine Lowering
Temporary Water Services 1.00000000
Remove Abandoned Poles
35 Trees and Irrigation Improvements various areas Trom Urace St.to Belknap
on
TPW 179,870.45
Sub Totali ions
Change Order Additions Page 2 of 4
FnK�R]H City of Fort Worth
Change Order Deletions
Project Name Six Points Urban Village Phase 2 Streetscape Improvements City Sec# 0
Client Project# 00705
Contractor The Fain Group,Inc. PM Chad Allen Inspector Stanley Sutterfield
Change Order Submittal# Date 312012020
OtLtIlON5
Unit UnitCost Total
Conc.Rat Wallwith i ewa ,Face
Conc.Rat Wallwith i ewa ,Sidewalk
Furnishlinstall ModelPreemption Detector
Furnishlinstall Preemption Cable
Multi-conductor a e
Insulated Eec on r
Bare Elec Candr
Furnishlinstall 1 ype 4b Signaloe
Powder Coat Sig Pole an
15 Tree a
Shrubsand OrnamentalGrasses
i e ac
enc
Bond
TPW 183,1 88.05
Sub Totale e ions
Change Order Deletions Page 3 of 4
MISBE Breakdown for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
Co# DATE AMOUNT
Total $0.00
BIM 360 Document Management Page 1 of 2
B AUTODESK'BIM 360 fortworthgov;C00705-2-Six Points Urban Village Streetscape Phase II- A CA
Document Management FOLDERS REVIEWS. TRANSMITTALS ISSUES
Reviews > Reviewdetail
CLOSED #28 Change Order Approval Workflow
Export Report - This review is closed.
Name Approval status PROGRESS
e DOC-000705-CO1 Six Points Phase 2-20200320-ROO.pdf Approved
Initiator Initial Review n
p XL-000705-CO1 Six Points Phase 2-20200320-ROO.xlsm Approved CA Chad Allen Mar 20,2:59 PM
<chad.allen@furtworthtexas.gov>
Submitted to Reviewer 1
Reviewerl Initial Revewl n
NS Noel Sanchez Mar27,9:27AM
<nsa nchez@fai ngp.com>
Submitted to Reviewer 2
Reviewerl Initial Revew2 n
LA Lissette Acevedo Mar 27,9:55 AM
-tissette.acevedo@fortworth texas.gov>
Submitted to Reviewer 3
approved
Reviewer 3 Initial Review 3 n
LP Lauren Prieur Mar 27,10:17 AM
i
<lau ren.pri eu r@fo rtwort htexas.g ov>
Submitted to Reviewer 4
No comments
Reviewer 4 Initial Review 4 n
LP Lauren Prieur Mar27,10:25 AM
<lau ren.prieu r@fortwo rthtexas.gov>
Submitted to Reviewer 5
no comments
Reviewers Initial RevewS n
DB Douglas Black Apr 16,5:42 PM
<doug.b la ck@fo rtwo rthtexas.g ov>
Submitted to Approver
approved.
Approver Final Review n
DB Dana Burghdoff Apr 17,10:04 AM
<da na.burghdoff@fortworthtexas.gov>
Review ended
OFFICIAL RECORD i
< CITY SECRETARY
FT. WORTH, X i
r
https://docs.b360.autodesk.com/projects/958011 al-2d6f-41 a3-afab-ecf2b8470486/reviews/... 4/24/2020