HomeMy WebLinkAboutOrdinance 6154 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF SOUTH HENDERSON STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
SRO ASPHALT, INC., ARLINGTON, TEXAS FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF
FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with SRO ASPHALT, INC., ARLINGTON, TEXAS for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to-wit:
1. SOUTH HENDERSON STREET From Broadus Street to Seminary Drive, known and
designated as Unit 1,, Project No. 104-24000-181.
2. WEST ALLEN STREET From Enderly Place to Eighth Avenue,, known and
designated as Unit 29 Project No. 104-24000-181.
3, BRYAN AVENUE From Magnolia Avenue to Morphy Street, known and
designated as Unit 3, Project No. 104-24000--181.
4. FIFTH AVENUE From Beddell Street to Gambrell Street,, known and
designated as Unit 4, Project No. 104-24000-181.
5. MORPHY STREET From South Main Street to Crawford Street, ]mown
and designated as Unit 5, Project No. 104-24000-181.
6. BALDWIN AVENUE From Broadus Street to Seminary Drive, known and
designated as Unit 6, Project No. 104-24000-181.
7. BALDWIN AVENUE From Seminary Drive to Flint Street, known and
designated as Unit 7, Project No. 104-24000 181.
8. FULLER STREET From James Avenue to Stanley Avenue, known and
designated as Unit 8, Project No. 104-24000-181.
The City Council deleted from the contract this
unit only at Benefit Hearing, November 11, 1968,
M & C G-1307, and all prior proceedings in
connection with same are hereby cancelled as
provided for in Sec. 10, Art. 1105b, of the
Revised Civil Statute of Texas as amended.
9. JOYCE DRIVE From the North line of Lot 12, Block 10, Highland
Homes Addition to U. S. Highway 80 West.
10. SANDAGE AVENUE From the North Line of Lot 5, Block 18, to the
North Line of Lot 4, Block 18, Prospect Heights
Addition (East side of street onl9.
WHEREAS, by sundry proceedings heretofore ej by the City Council of the
City of Fort Worth, Texas, including Ordinance Nog- � , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance Nos. 6019 & 6023 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOWg THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT-
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II,
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows-
III.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the .caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS G�� j(, day of 190.
APPROVED AS TO FORM AND LEGALITY:
i f
i
City Attorney
y
UNIT I. SOUTH HENDERSON FROM BROADUS STREET TO SEMINARY DRIVE, PROJECT NO. 104-24000-181,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a
lime stabilized subgrade with seven-inch high reinforced concrete curbs and two-foot wide
reinforced concrete gutters, and by reconstructing an existing driveway to proper align-
ment and grade, and by constructing five-inch thick concrete sidewalks where specified,
so that the finished street will consist of one thirty-foot wide roadway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE SOUTHWEST CORNER OF SOUTH HENDERSON AND BROADUS STREET
WEST SIDE OF STREET
WALKERS ADDITION
Allan, Alvin & Wm. 6 13 50' Pavement $5.53 $276.50
Zidell & Milton Sabel Apt. 50' Sidewalk 2.12 106.00
& Irvin Leva $ 382.50
1037 E. Tucker Street
Suite 101
Allan, Alvin & Wm. 5 13 50' Pavement $5.53 $276.50
Zidell & Milton Sabel Apt. 50' Sidewalk 2.12 106.00
& Irvin Leva $ 382.50
1037 E. Tucker Street
Suite 101
E. L. Pallmeyer 4 13 50' Pavement $5.53 $276.50
P,O. Box 6100 Apt. 50' Curb & Gutter 2.90 145.00
50' Sidewalk 2.12 106.00
$ 527.50
E. L. Pallmeyer 3 13 50' Pavement $5.53 $276.50
P,O, Box 6100 Comm. 50' Curb & Gutter 2.90 145.00
50' Sidewalk 2.12 106.00
$ 527.50
E. L. Pallmeyer 2 13 50' Pavement $5.53 $276.50
P,O. Box 6100 Comm. 50' Curb &Gutter 2.90 145.00
50' Sidewalk 2.12 106.00
$ 527.50
E. L. Pallmeyer 1 13 50' Pavement $5.53 $276.50
P,O. box 6100 Comm. 41' Curb & Gutter 2.90 118.90
50' Sidewalk 2.12 106.00
$ 501.40
1
L"NIT NO, 92 JOYCE DRIVE FROM THE NORTH LINE OF LOT 12, BLOCK 10 TO HIGHWAY NO. 80, PROJECT
NO, 104-24000-181, to be improved by constructing a six-inch thick hot-mix asphaltic concrete
pavement on a lime stabilized subgrade with seven-inch high reinforced concrete curbs and two-
foot wide reinforced concrete gutters, and by constructing six-inch thick concrete driveways
where specified, so that the finished street will consist of one forty-foot wide roadway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
bEGINNING AT THE NORTHEAST CORNER OF LOT 12, BLOCK 10 AND JOYCE DRIVE
WEST SIDE. OF STREET HIGHLAND HOMES ADDITION
Gateway NaCl Bank 13A & 10 121' Pavement $7.65 $925.65
3532 Joyce Dr. 13B Comm. 121' Curb & Gutter 2.90 350. 90
193 S.F. Driveway .74 142.82
$1,419.37
Buddies Super Market, 14 10 121' Pavement $7.65 $925.65
Inc . Comm. 121' Curb & Gutter 2.90 350.90
c/o Marvin F. Poer $1,276.55
1407 Main, Suite 1411
Dallas , Texas
CHAPEL DRIVE INTERSECTS
S . K. Kuykendall E.75' of 193. 5' Pavement $7.65 $1,480.28
7301 Bankhead Hwy. 5. 193.5' 193.5' Curb & Gutter 2.90 561..15
of Blk.3 175 S.F. Driveway .74 129.50
Ind. $2,170.93
EAST SIDE OF STREET
Arnatt Durbandt W.� less 193. 5' Pavement $7 .65 $1,480.28
P.O. Box 1216 N. 56. .5' 193.5' Curb & Gutter 2. 90 561.15
Sweetwater, Texas of. Blk. 2 700 S.F. Driveway .74 518.00
Comm. $2,559,43
Cl-UjPEL DRIVE INTERSECTS
Fred Scharf N.234. 9' 235' Pavement $7.65 $1,797.75
3510 Alta Mere W.of Hwy 235' Curb & Gutter 2. 90 681.50
of Blk. 11 525 S.F. Driveway .74 388.50
Ind. $2,867.75
COST TO PROPERTY OWNERS - ASSESSMENT $10,294.03
COST TO 'CITY OF FORT WORTH 5,847.65
TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 9 $16,141.68
�4J
UNIT 10, SANDAGE STREET FROM THE NORTH LINE OF LOT 5, BLOCK 18, TO THE NORTH LINE OF LOT 4,
BLOCK 18 IN PROSPECT HEIGHTS, EAST SIDE OF STREET ONLY, PROJECT NO. 104-24000-181, to be im-
proved by constructing a seven-inch high reinforced concrete curb and a two-foot wide rein-
forced concrete gutter, and by constructing a six-inch thick concrete driveway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT SOUTHEAST CORNER OF LOT 4, BLOCK 18 ON SANDAGE
EAST SIDE OF STREET PROSPECT HEIGHTS
Walter Cook 4 18 50' Curb & Gutter $2.90 $145.00
z913 Sandage Res. 151 S.F. Driveway .74 111.74
cjo Welborn Mortgage $256.74
Co.
COST TO PROPERTY OWNER - ASSESSMENT $256.74
COST TO CITY OF FORT WORTH 23.54
TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 10 $280.28
l 1
"' ""HM I City of Fort Worth, 'rexas
LINK
MORPHIS Mayor and Council Communication
R,&B.
DATE REFERENCE SUBJECT: Final Payment - Assessment PAGE
GRAHAM NUMBER Paving at 10 Locations on
/25/69 FP-651 the South Side 1of
Final Council action on the project described below is requested.
Project Description
Name: Assessment Paving at 10 Locations on the
South Side, Project No. 104-24000481
Contractor: S.R.O. Asphalt, Inc.
Contract-Awarded: October 7, 1968 (M&C C-1330)
Work Order Issued: January 22, 1969
Work Order Effective: February 3, 1969
Date of Final Inspection and
Approval: June 30, 1969
Working Time Bid: 68 Working Days
Working Time Used: 67 Working Days
Project -Cost and Financing
Original Bid Price: $89,121.00
Change Order No. 1: -$10,345.00 (M&C G-1307, 11/4/68, Deleted
Unit 8)
Revised Contract Price: $78,776.00
Final Contract Cost: $65,511.43
Partial Payments Previously
Made: 5 Amount: $58,723.44
Final Payment Due: $ 6,787.99
Final Payment to be made from
Project Account No. : 104-24000-181
Deviation from Bid Price: An underrun of $13,264.57 resulted because
estimated quantities of curb and gutter,
pavement and subdrain were in excess of
quantities used and because of minor
variations between quantities estimated in
the contract documents and quantities
actually measured.
Compliance-with-Specifications
During testing on this project, 17 corings were made with. the following results:
Exceeds Even With Under Specs But Below
Specs . Specs Within Tolerance Tolerance
Paving 10 6 1 0
Subgrade 0 17 0 0
DATE REFERENCE SUBJECT: Final Payment - Assessment PAGE
NUMBER Paving- at 10 Locations on
8/25/69 ? or 2
FP-651
the South Side
On the entire project, the-average thickness .of: the:.hot� mix asphaltic concrete
paving is6.ii inches-as .compared-,t .-the-_6 00, tnehes-specified, and the average
thickness` of- the-lime stabilized-subgrade--is-6-.00, inches as- specified. Tests
made during construction of subgrade•and-pavemen.t show•that•-agaterials used were
in compliance with specifications.
Recommendation
It-is- recommended that- the-above�-project be -accepted-by the- adoption of an
ordinance and that- final payment-.of- $6•,787.99- be authorized to S.R.O. Asphalt,
Inc.
HDM:jp
r ,
SUBMITTED BY: DISPOSITION BY COUNCIL: PROCWItu BY
RPV /' O OTHER (DESCR "
,</ Clewa
ITY SECR RY
(/ DATE
CITY MANAGER �� ,-.- �,