AMENDMENT NO. 2 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
SECOND ANIMAL CARE AND CONTROL FACILITY
I
I
STATE OF TEXAS
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Pierce Goodwin Alexander & Linville, Inc.,
(Consultant) made and entered into City Secretary Contract No. 50096 (The Contract)
which was authorized by the City Council by M&C C-28439, the 17th day of December,
2016, for a New Second Animal Care and Control Facility; and
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services agreement for additional design services for a new Oncor Easement.
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I -- Scope of Services, Paragraph (3) shall be added to read as follows:
(3) Provide additional design services for the design and detailing of a new Oncor
Easement. The cost of this additional service is $3,000.00 plus $0.00 in
reimbursable expenses. The scope of services is described more fully in Pierce
Goodwin Alexander & Linville, Inc. Letter dated April 15, 2020, subject: "Change
of Services Amendment no. 02 - ONCOR Electric Easement, CITY OF FORT
WORTH SECOND ANIMAL CARE & CONTROL FACILITY.
2.
Article II - Compensation, first paragraph, is amended as follows:
"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachment "A". Payment shall be considered full compensation for all labor,
materials, supplies, and equipment necessary to complete the services
described in Attachment "A". However the total fee paid by the City shall not
exceed a total of $1,149,935.00 unless the City and the Consultant mutually
�282p2 agree upon a fee amount for additional services and amend this Agreement
pQ o��o�j\0R,H accordingly."
�`� R�,CEIVED f
City of Fort Worth,Texas
Standard Agreement for Professional Services AMENDMENT I I
Revision Date:3/20/2020
Page 1 of 2 � trRl
Z�MEKRETXRV
l
F-F. WORTH,i���
Executed effective as of the date signed by the Assistant City Manager below.
FORT WORTH:
City of Fort Worth Contract Compliance Manager:
By signing I acknowledge that I am the person
o� responsible for the monitoring and
administration of this contract, including
By: ensuring all performance and reporting
Name: -4&y Gha- requirements.
Title:
Date: �1-2.3
By: 'Gw-6:62�
Approval Recommended: Name: Brian Glass
Title: Architectural Services Manager
Approved as to Form and Legality:
By: *ame�.: John
Name: Steve Cooke
Title: Director, Property Management Dept.
Attest: B. Strong
Title: Assistant City Attorney
/ OR ` '' Contract Authorization:
By: <M&C: n/a
Name: Ma `
Ka a '
�.=�:
Title: City Secretary � ",•' y., .` + ^
VENDOR:
Pierce Goodwin Alexander & Linville;Inc: -
By: � } 1,7
Name: Jeff D. Bulla, AIA
Title: Principal in Charge
Date: 4/15/20
City of Fort Worth,Texas
E'�� iin
Standard Agreement for Professional Services AMENDMENT 01
Revision Date:3/20/2020
Page 2 of 2 L it L W
II
i
Attachment"A"
April 15, 2020
Change in Services Amendment No. 02- ONCOR Electric Easement
CITY OF FORT WORTH SECOND ANIMAL CARE & CONTROL FACILITY
This Additional Services Agreement is made as of the date above between PGAL(the
"Architect")and the City of Fort Worth (the"City","Client"and"Owner")for the
Second Animal Care&Control Facility(the"Project").
This Additional Services Agreement incorporates the additional project scope and
services of the Architect described herein into the Agreement Between Client and
Architect dated December 28, 20 17,for this project(hereinafter referred to as the
"Original Agreement").
i.o ADDITIONAL PROJECT SCOPE
The Project included the following scope:
1.1 Provide the required documentation to create an ONCOR Electric Easement
on the property.
2.o ARCHITECTURAL & ENGINEERING SERVICES INCLUDED
The following services are included in this Additional Services Agreement and will
be provided by PGAL and our Civil Engineering consultant, RLG:
2.1 Coordinate with the Owner,Architect, Engineer and ONCOR to determine
the configuration and dimensions of the proposed ONCOR Easement.
2.2 Prepare field notes (an exhibit and metes&bounds description)for an
underground electrical line and transformer.
2.3 Place monuments in the field at each easement corner.
Note: Monuments will be placed one time only. Replacement of
monuments will be an additional service.
2.4 Submit three (3) signed and sealed exhibits with metes&bounds
descriptions to ONCOR to attach to their easement language.
2.5 Easement will be filed at the county by ONCOR.
3.o EXCLUDED SERVICES
The following services are not included in this Additional Services Agreement:
3.1 Not applicable
4.0 PROFESSIONAL FEES
For the services described herein,the Client shall compensate the Architect as
follows:
4.1 Fixed Fee (excluding Reimbursable Expenses): $3,000.00
5.o REIMBURSABLE EXPENSES
Reimbursable Expenses shall be:
5.1 as described in the Original Agreement
6.0 MISCELLANEOUS
6.1 Unless otherwise stated herein,the terms and conditions of the Original
Agreement shall prevail.
6.2 This Change in Service will be referenced and invoiced as"ONCOR Electric
Easement".
AUTHORIZATION:
If this Proposal is acceptable,please sign below and return one copy to PGAL.
PGAL City of Fort Worth
Signature: Signature
Jeff D. BUlla,AIA, LEED AP Brian R.Glass,AIA
Principal Architectural Services Manager
Date