Loading...
HomeMy WebLinkAboutContract 37226 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. WHEREAS, Industrial Developments International (Texas), L.P., hereinafter called "Developer", desires to make certain improvements to Speedway Distribution Center Major Infrastructure, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. E. The Developer shall award all contracts for the construction of community facilities in accordant with section II, paragraph 7 of the Policy. ,J' ! ai5'vlJai VtATY 6NE"TH R11 a q F Project Name: Speedway Distribution Ctr 1 CFA Number: 2008-017 Date: April 21,2008 s F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alle'qed negligence of the City of Fort Worth, its officers, servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to Project Name: Speedway Distribution Ctr 2 CFA Number: 2008-017 Date:April 21,2008 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof. Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1)Attached; Street Lights and Signs (C) Attached.. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1 and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B 1 and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection estimated at $ 2,367,574.43 Project Name: Speedway Distribution Or 3 CFA Number: 2008-017 Date: April 21,2008 Project Name Speedway Distribution Center CFA 2008-017 DOE No. 5845 Item Developer City Cost Total Cost Cost A. Construction 1. Streets $ 1,015,245.42 $ 1,015,245.42 2. Storm Drainage $ 1,151,438.00 $ 1,151,438.00 3. Street Lights $ 70,400.00 $ 70,400.00 4. Street Name Signs $ 490.00 $ 490.00 B. Engineering Design $ - C. Construction Engineering and Management b DOE 4% $ 86,667.34 $ - $ 86,667.34 D. Materials Testing by DOE (2%) $ 43,333.67 $ - $ 43,333.67 TOTALS $ 2,367,574.43 $ - $ 2,367,574.43 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. Project Name: Speedway Distribution Ctr 4 CFA Number:2008-017 Date: April 21,2008 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth,Texas this the )9+hday of )2008. Approval Recommended: Transportation and Public Works Dertment NO M&C RIEEQUIRED Gr o ,P. E. Act' rector City of Fort Worth ATTEST: Fernando Costa Assistant City Manager Marty Hend City Secretary DEVELOPER Approved t Fo rm: INDUSTRIAL DEVELOPMENT INTERNATIONAL, (TEXAS), L.P., a Georgia limited partnership Assist t CityYony By: ID International (Texas), Inc. a Georgia Corporation, its sole general partner Name: DavidR. Birdwell Title: SecretarT oil 111 IR e: smgame Title: Project Name: Speedway Distribution Ctr $ CFA Number: 2008-017 Date:April 21,2008 8 N 5 F W hCather�0P i PROJECT �'q/�/y / 11 li�]OJE 11 LOCATION S H 11 � _ TEXAS MOTOR --=_ SPEED WA Y o C117,a" Cf, �Pk I35W N � m We f E FORT 0 S CITY LIMIT MCINITY MAID NTS SPEEDWAY DHSTRR o UTRON CENTER MAJOR RNF ° ° STRUCTU ° E LOCATED EN CJl Jl Y OF FORT WOR LL JS J19 TEXAS OVINED/DEVELO?ED BY: FRJEPAB.ED SY: ImAtlanta•Chicago•Cincinnati (G GODWUNTO Dallas•Ft.Lauderdale•Memphis SHALL a Los Angeles•Philadelphia I p /Y/ j`) Two Lincoln Cenlre, Suite 1275 1 J" —N V CMLENGINEERS—PLANNERS—SURVEYORS 5420 LRJ Freeway 2405 Mustang Drive,Grapevine,Texas 76051 Dallas, TX 75240 Metro(817)329-4373 Phone: 19721 560-7000 APPJLg 2008 Fox, 1972 1 560-7007 E-\10276\F1ans\iJIAJ0R INFRASTRUCTURE - CFA.pro Mon Apr 14 10:29 13 2008 i i 1 t 1 ' f I s E / ! j m C, x f ti � ti 0= 1 C f rr- } r E / p 1 m r E 0 m / \ \ 4 SI FWA rr 1 1 \\ \ ♦ ��`. � \\ . -rrrr 1 µ) / 4'SIDEWALK i THOMAS 0.M[KENZIE TRUST f v VOL.5079. PG.2800 1 i 1 I nm THREE WIDE DRIVE f u D D.R.D.C.T, U L t >.a INS INO DESCRIPTION 1 ? bFvlttu O/ my •.v.Z AMT PROPERTY DISTRIBUTION 7 m m cim 1 DEVELOPMENT, LLC. CENTER U) zn c m VOL.5137. PG. 1358 i m n D.R.D.C.T, i 3 �n Inic i D Ox CD 1 � o rrrrr i �y rrrr 1 Z (rrrr i T7 rrrr, rrrr rrrr ff ff �LJ rrrrr / rrrrr i 7J rrrrr C rrrrr % C FrIrl () .> rrrrr / \ mrrrr �/ 1 ® () r ' 1 A r, DDT mom:0 D� r 1 c7 3 z W b pm� �x� moo Gmj D c G) ! KJ ao-0 onm mcon m i ON, ona zo Z .o g� z-10 1 , O O a b U) rolvc -ivm' zm' ( ® 1z �Om m 3D� worn m w D my z rnOo .A-N r 0 i orw w 1v �n G �y ��Q oo mm 3 -s m o • ,�-« '�'� a rn e v O Z m -1-1 r.rn m A J 1 �' o 00 � C---fNGG "m�oOo�rrn rnm1 7�0 (7 ro g� pNONOS r (A> pN o vr> (A Z N �- _ Q 0 DO O mmO Pn 0 m a: ID i } (U 01 0N'N pj m 0I'1DD 'FA, D Dm m i O 4 �O�m n m= am--i mm I fi OD Jo J:� = n-i WD< 1! OmZ G) rn i i iI I i x 1 I Cb m 1 6 La f '� n �2 3 •" ro � j S ' Yl i o zm i ci 1:: opm 3 f i THREE WIDE DRIVE i oN m z a - m"T n K'. i DOUBLE GLE O /� - a i - Nm � BOULEVfIRD I m Z L C) \ �Yoo H , ern ! z E Y I T IE TM N E f MID (1. n t f I C i 37 +j m p 0 F7r S C3 � rd 0 D u�i N o m atj t n xo r D rIN �a Yz 15:�. r a n�o N �j m' r74ir xrro y O O O N n vao C m � �O m t�ii'0 �� • � m � nl � O 'S m i -4 n a R.) n r n o 1 Lo 000 (D n m Z { ru ono F0m � r ~ r 2 S n> y S o 0 t m i i . t / /, of � 1 ! o , N Ny O !O Ny r 1 o 2 = a L c�i Ooj r 1 t . 1 rrl a �` _ S IOOw NPS o O IOOw HP `t _ =en0yc• S r O IOOw HPS IOOw tips (OOw F#'S TH L �1 __ _ _ / In00i U) SdH OMAS 0.McKENZ1E TRUST I w HPS IOOw HPS IOOw HP5 IOOw HPS U U VOL.5079, PG.2800 THREE WIDE DRIVE U L oP D O ESCR ESCRIPTITI IA (NO DON I Gi AMT PROPERTY DEVELOPMENT, LLC_ DISTRIBUTION j VOL.5137, PG. 1358 CENTER 3 D.R.OX.T. D c- O t W H 3 z U) c c ® �-I fn n zm > C O qa '"_J I Ir .0 3 m ® b -ZIT qv o o m f Cn x c Z � w e a �7 3 o o /,r/� f ornw �° �[�?; � ulo � ® T � o o m I D _0 o 8 • 9 .`� �i m W RI t� C C n ca �-Lj n aX r7 g.10o =: `- O C7ao Glc. A` e ry R�l oN imN ()� CI• (D ' E 0 u t1 O 03 Z -q o LD t 00 C7. r rq i u 40 N 13 m j i O o � ! o m , m ' i i ENGINEER'S OPINION OF PROBABLE COST i Date: 5/5/2008 Project: Speedway Distribution Center Client: IDI Major Infrastructure Plans Job No: 10276 Location: Denton County,Texas Page: 1 of 6 ITEM UNIT TOTAL No. DESCRIPTION UNIT QUANTITY PRICE COST Paving Facilities 1. 8"Reinforced Concrete Pvmt S.Y. 21,491 $31.85 $684,488.35 2. 10" Type "B"HMAC Base Pavement S.Y. 1,620 $35.47 $57,461.40 3. 4" Type"B" HMAC Base Pavement S.Y. 685 $13.33 $9,131.05 4. 2"Type "D" HMAC Surface Pavement . S.Y. 2,305 $6.66 $15,351.30 5. 8" Subgrade Preparation S.Y. 24,775 $2.16 $53,514.00 6. Hydrated Lime 41#/SY Ton 507.9 $124.12 $63,039.00 7. Connect to Exist. Asphalt Pvmt L.F. 564 $3.37 $1,900.68 8. Construct Concrete Header L.F. 518 $6.03 $3,123.54 9. Pavement Markings &Signage L.S. 1 $10,303.00 $10,303.00 10. Traffic Control L.S. 1 $7,570.00 $7,570.00 11. 4' Sidewalk L.F. 6,694 $14.00 $93,716.00 12. Barrier Free Ramps Ea. 29 $350.00 $10,150.00 13. 2" Sch. 80 Conduit Crossings L.F. 623 $7.70 $4,797.10 14. "Large" Ground Box Ea. 2 $350.00 $700.00 Paving Subtotal $1,015,245.42 f This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience and best judgement as a design professional. It must be recognized that any evaluation of work to be performed to construct this project must by necessity be speculative in nature until completion of its actual detailed design. In addition the engineer has no control over the cost of labor material or services to be furnished by others or over market conditions. Accordingly Goodwin & Marshall, Inc. can not guarantee that actual costs will not vary from the opinions expressed herein. I i E:\10276\Cost\UPDATED Major Infrastructure CFA Costs TO MATCH CITY CFA.xls i ENGINEER'S OPINION OF PROBABLE COST Date: 5/5/2008 Project: Speedway Distribution Center Client: IDI ! Major Infrastructure Plans Job No: 10276 Location: Denton County,Texas Page: 4a of 6 ITEM UNIT TOTAL No. DESCRIPTION UNIT QUANTITY PRICE COST Storm Drain Facilities i 1. 20' Curb Inlet Ea. 1 $3,600.00 $3,600.00 2. 15' Curb Inlet Ea. 1 $3,200.00 $3,200.00 3. 10' Curb Inlet Ea. 8 $2,200.00 $17,600.00 4. 3" P.V.C. L.F. 30 $12.00 $360.00 5. 18" R.C.P. L.F. 345 $36.00 $12,420.00 6. 21" R.C.P. L.F. 549 $41.00 $22,509.00 7. 24"R.C.P. L.F. 368 $44.00 $16,192.00 i 8. 27" R.C.P. L.F. 111 $48.00 $5,328.00 I 9. 30" R.C.P. L.F. 37 $52.00 $1,924.00 I 10. 36"R.C.P. L.F. 730 $65.00 $47,450.00 I 11. 39" R.C.P. L.F. 101 $75.00 $7,575.00 12. 42" R.C.P. L.F. 345 $84.00 $28,980.00 13. 48"R.C.P. L.F. 1,041 $110.00 $114,510.00 14. 72"R.C.P. L.F. 421 $220.00 $92,620.00 15. 78" R.C.P. L.F. 338 $250.00 $84,500.00 16. 9'x S'R.C.B. L.F. 1,122 $501.00 $562,122.00 17. 3" Sloped End Headwall Ea. 1 $920.00 $920.00 18. 18" Sloped End Headwall Ea. 3 $985.00 $2,955.00 19. 21" Sloped End Headwall Ea. 1 $2,200.00 $2,200.00 j 20. 27" Sloped End Headwall Ea. 1 $2,400.00 $2,400.00 21. 42" Sloped End Headwall Ea. 1 $2,900.00 $2,900.00 22. 78" Sloped End Headwall Ea. 1 $3,414.00 $3,414.00 f 23. 9'x 5' TxDOT Type FW-0 Hdwl Ea. 1 $10,431.00 $10,431.00 i (See Sheet 4b) l I i { This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience and best judgement as a design professional. It must be recognized that any evaluation of work to be performed to construct this project must by necessity be speculative in nature until completion of its actual detailed design. In addition the engineer has no control over the cost of labor material or services to be furnished by others or over market conditions. Accordingly Goodwin &Marshall, Inc. can not guarantee that actual costs will not vary from the opinions expressed herein. E:\10276\Cost\UPDATED Major Infrastructure CFA Costs TO MATCH CITY CFA.xIs i i f ' ENGINEER'S OPINION OF PROBABLE COST i j Date: 5/5/2008 Project: Speedway Distribution Center Client: IDI { 1 Major Infrastructure Plans i Job No: 10276 Location: Denton County, Texas Page: 4b of 6 ITEM UNIT TOTAL j No. DESCRIPTION UNIT QUANTITY PRICE COST I Storm Drain Facilities i s 24. 4'x 4' Junction Box w/Riser Ea. 3 $2,500.00 $7,500.00 25. 5'x 4' Junction Box w/Riser Ea. 1 $4,211.00 $4,211.00 26. Tx 4' Junction Box w/Riser Ea. 1 $6,221.00 $6,221.00 i 27. Tx 7'Junction Box w/Riser Ea. 1 $7,024.00 $7,024.00 28. 10' x 4'Junction Box w/Riser Ea. 1 $8,057.00 $8,057.00 29. City of Fort Worth Type 6 MH Ea. 1 $10,175.00 $10,175.00 30. City of Fort Worth Type 4 MH Ea. 1 $8,000.00 $8,000.00 31. City of Fort Worth Type 1 MH Ea. 1 $5,000.00 $5,000.00 r 32. Tx 4'Weir Structure&Hdwl Ea. 1 $6,114.00 $6,114.00 33. 4'Riser w/Ring& Cover Ea. 2 $533.00 $1,066.00 34. 18" Plug Ea. 4 $130.00 $520.00 35. 21" Plug Ea. 1 $130.00 $130.00 j 36. 24" Plug Ea. 1 $130.00 $130.00 37. 36"Plug Ea. 1 $130.00 $130.00 38. 39" Plug Ea. 1 $130.00 $130.00 I 39. Gabion Mattress (12"Dia.) S.F. 216 $24.00 $5,184.00 40. Gabion Mattress (18" Dia.) S.F. 916 $33.00 $30,228.00 j 41. Trench Safety L.F. 5,508 $1.00 $5,508.00 i Storm Drain Subtotal $1,151,438.00 i t I { t I This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience ! and best judgement as a design professional. It must be recognized that any evaluation of work to be performed to construct this project must by necessity be speculative in nature until completion of its actual detailed design. In addition the engineer has no control over the cost of labor material or services to be furnished by others or over market conditions. Accordingly Goodwin & Marshall, Inc. can not guarantee { that actual costs will not vary from the opinions expressed herein. E:\10276\Cost\UPDATED Major Infrastructure CFA Costs TO MATCH CITY CFA.xIs i t t� S C ENGINEER'S OPINION OF PROBABLE COST t Date: 5/5/2008 Project: Speedway Distribution Center Client: IDI Major Infrastructure Plans Job No: 10276 Location: Denton County, Texas Page: 5 of 6 ITEM UNIT TOTAL No. DESCRIPTION UNIT QUANTITY PRICE COST Miscellaneous 1. Street Light Ea. 22 $3,200.00 $70,400.0.0 € 2. Street Name Signs Ea. 2 $245.00 $490.00 ! ` Miscellaneous Subtotal $70,890.00- f 1 I (i rt I 1 E 1 (I i ! r ! i a i t I I i 3 I 3 i f i This Engineer's opinion of probable construction cost is made on the basis of the Engineer's experience and best judgement as a design professional. It must be recognized that any evaluation of work to be j performed to construct this project must by necessity be speculative in nature until completion of its actual i detailed design. In addition the engineer has no control over the cost of labor material or services to be furnished by others or over market conditions. Accordingly Goodwin & Marshall, Inc. can not guarantee that actual costs will not vary from the opinions expressed herein. I 2 E E:\10276\Cost\UPDATED Major Infrastructure CFA Costs TO MATCH CITY CFA.xIs 1