Loading...
HomeMy WebLinkAboutContract 37236 COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.3a3� WHEREAS, Mercantile Partners, L.L. hereinafter called "Developer", desires to make certain improvements to Quorum Drive Storm Sewer Extension, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. B. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. C. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. D. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. .E. The Developer shall award all contracts for the construction of community facilities in accordance with Section H, paragraph 7 of the r , Policy. Proiect Name—Ouorum Dr Storm Drain 1 F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the QtU oLFort Worth, its officers, servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. 1. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). I Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. :Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to Proiect Name—Ouorum Dr Storm Drain 7 construct current and future improvements provided for in this agreement. AMENDMENTS TO THE FOLLOWING SECTIONS AS NECESSARY PER PROJECT SPECIFICATIONS M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)None Storm Drain (B-1) Attached; Street Lights and Signs (C)None. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developer(s) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibit B 1. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibit B 1. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $345,568.81 Proiect Name—Ouorum Dr Storm Drain 1 SUMMARY OF COST Project Name Quorum Dr DOE # 5930 Item Developer City Cost Total Cost Cost A. Construction 1 . Streets - $ $ 2. Storm Drainage 326,008.31 326,008.31 3. Street Lights - - 4. Street Name Signs B. Engineering Design C. Construction Engineering $ $ and Management by DOE (4%) 13,040.33 13,040.33 D. Materials Testing by DOE (2%) 6,520.17 6,520.17 TOTALS 345,568.81 - 345,568.81 Notes: 1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. Proiect Name—Ouorum Dr Storm Drain d IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the day of ) 2008. Approval Recommended: Transportation and Public Works Tment ons, P. E. Ac g irector City of Fort W70tL Fernando Costa Assistant City Manager ATTEST: Marty He drix NO ftl&C REQUIRED City Secretary Approve44—"Form: Assis ey ATTEST: DEVELOPER: Mercantile Partners, L.P. A Texas limited partnership By: Mercantile Corporation a Texas corporation s g ra rtner z4yzz'e. By: 9V Corp at Secretary Brian andolph _- Vice President Proiect Name—Ouorum Dr Storm Drain n Uc (> ~ � _ Oo i 0 � 0 LLI 0 5 o W ca o F- 't II W a�Z W W o 04 Lij L o w 0�3 O W U U i 3[ 00 0) Vj O J M M \ GQ M ! Z Z <t mN a o �rn� �i i W FM- UO J-F-a Y'n o t�mcoD rod Z Q ���Wa, wZ o+7 x,ll II �;- Q• a: W Q OJ Zo ¢aJ� o aNwNCD QUO � ' N L f- m Uam z^ No Nz i lid \ 11 w (� F- � Q <0 w O Q of I �� O w e LL 3 o m w is m .Z[°i0 ww F� II .I x L) o•�`co L 0 00 O �` WH �mdm '� � V) O LZ oa mza^ awII •_ Nr O U oRuWQOW M z J� m mi O� 00� iDw �m(0 pcn O W i, F O N o��i�, tto°w II III w n Wfn J ` M z m z I In lJi Ir I F o X V) U r 00 o p . LLJZ Q � `� N J oY OMm 00 C ¢ O J OWoo moo o 0 o z +W�x.�.� c U o O Q �o O O Q OC14 CD 0 .II�3a F rnO? Z ww o w W I Fay o III• as z �� O O cn :'x� o a I �o� o o ~ r\� LL �`'•. FVW)DWU JF OUwN �Oil0 , oU Z ^N= O NcyJ ,iI } W ON OW ZU Ow 0cDoO <O Z I,N a . d o Q CL o OV000 H tD tD pCL w +y ` O WZO Ow LU x 40 1Wm0Oz¢ oWWH <D(DtD Jin - Nm w aF Z Lr z< D��O ZF- Swyy mZ�C b zo N J J w vO �1 � \\ II ro m � Q \\ Exx W \\\\ LLJ a d' \\ v 6,0, 6 xw 0t pu)N X O cow Ztooa`n m J mU0 W J 00 Lii ItJJ�JmJ� Q Z Z Z lzmwzm I�1�1�0_' d JJ }J J J F- ix J 1-0Z WZ d Q Cr F'" Q_'LLJ Z W Ow om W O II W� W¢o Z mxa ox¢ Lil aww n OV I . a� U U J m 0 mK X LLI J x MO I OU Ompmm ` YO m K'0 N Om z xN 11�tn Q SOD mLzw-' ��M04 U(ry0 Oj I . mo o�. I II � xx� En(0 _ JJZ Jz-Nl-cew I Om UT.N-?Nfi JMO'LX3-b'30-AO-8£b'LO-89017Z\JMO\9£b'LO-8904Z\tiZ-OMO\;yI WJOO:b - Onn7/nl/on L71 VHO1 UNIT I: STORM DRAIN ITEM APPROX. UNIT DESCRIPTION OF ITEMS WITH BID UNIT PRICE TOTAL NO. QUANTITY PRICES WRITTEN IN WORDS AMOUNT 1 1 EA Type "B" Headwall for 4'x11' Box Culvert Eleven Thousand Dollars and Zero Cents per each. $ 11,000.00 $ 11,000.00 2 20 LF 4'x11' Box Culvert Four Hundred Fifty Dollars and Eighty-One Cents per Linear Foot. $ 450.81 $ 9,016.20 3 1 EA 12'x17' Junction Box Five Thousand, Two Hundred Sixty- Eight Dollars and Fifty-Two Cents per Each. $ 5,268.52 $ 5,268.52 4 280 LF 4'x7' Box Culvert Two Hundred Fifty-Eight Dollars and Two Cents per Linear Foot. $ 258.02 $ 72,245.60 5 1 EA 8'x8' Junction Box Three Thousand, Two Hundred Sixty- Eight Dollars and Fifty-Two Cents per Each. $ 3,268.52 $ 3,268.52 6 2 EA TxT Junction Box Three Thousand, Three Hundred Seventy Dollars and Thirty-Seven Cents per Each. $ 3,370.37 $ 6,740.74 7 450 LF 66" RCP One Hundred Ninety-Five Dollars and Forty-Six Cents per Linear Foot. $ 195.46 $ 87,957.00 8 515 LF 60" RCP One Hundred Fifty-Eight Dollars and Sixty-Seven Cents per Linear Foot. $ 158.67 $ 81,715.05 9 39 LF 36" RCP Fifty-Seven Dollars and Seventy-Five Cents per Linear Foot. $ 57.75 $ 2,252.25 10 66 LF 24" RCP Twenty-Eight Dollars and Sixty-Three Cents per Linear Foot. $ 28.63 $ 1,889.59 11 2 EA 24" Bend Two Hundred Eighty-One Dollars and Thirty-Two Cents per Each. $ 281.32 $ 562.64 12 1 EA 66"x24"Wye Connection Two Hundred Twenty-Four Dollars and Nine Cents per Each. $ 224.09 $ 224.09 13 1 EA 66"x36"Wye Connection Two Hundred Fifty-Three Dollars and Twenty-One Cents per Each. $ 253.21 $ 253.21 14 3 EA 60"x24"Wye Connection One Hundred Eighty-Two Dollars and Thirty Cents per Each. $ 187.30 $ 561.90 15 674 SY 12"-16" Rock Rip-Rap Sixty-Two Dollars and Zero Cents per Square Yard. $ 62.00 $ 41,788.00 16 1,265 LF Trench Safety One Dollar and Zero Cents per Linear Foot. $ 1.00 $ 1,265.00 TOTAL AMOUNT STORM DRAIN $ 326,008.31 TOTAL AMOUNT BID STORM DRAIN $ 326,008.31 GRAND TOTAL AMOUNT BID $ 326,008.31