HomeMy WebLinkAboutContract 37236 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.3a3�
WHEREAS, Mercantile Partners, L.L. hereinafter called "Developer", desires to
make certain improvements to Quorum Drive Storm Sewer Extension, an addition to the
City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
.E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section H, paragraph 7 of the
r , Policy.
Proiect Name—Ouorum Dr Storm Drain 1
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the QtU oLFort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
1. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
I Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
:Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
Proiect Name—Ouorum Dr Storm Drain 7
construct current and future improvements provided for in this
agreement.
AMENDMENTS TO THE FOLLOWING SECTIONS AS
NECESSARY PER PROJECT SPECIFICATIONS
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)None Storm
Drain (B-1) Attached; Street Lights and Signs (C)None.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibit B 1.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibit B 1. The
estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection
is estimated to $345,568.81
Proiect Name—Ouorum Dr Storm Drain 1
SUMMARY
OF COST
Project Name Quorum Dr
DOE # 5930
Item Developer City Cost Total Cost
Cost
A. Construction
1 . Streets -
$ $
2. Storm Drainage 326,008.31 326,008.31
3. Street Lights - -
4. Street Name Signs
B. Engineering Design C. Construction Engineering $ $
and Management by DOE (4%) 13,040.33 13,040.33
D. Materials Testing by DOE (2%) 6,520.17 6,520.17
TOTALS 345,568.81 - 345,568.81
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
Proiect Name—Ouorum Dr Storm Drain d
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in triplicate, at Fort Worth, Texas this the day of
) 2008.
Approval Recommended:
Transportation and Public Works
Tment
ons, P. E.
Ac g irector
City of Fort W70tL
Fernando Costa
Assistant City Manager
ATTEST:
Marty He drix NO ftl&C REQUIRED
City Secretary
Approve44—"Form:
Assis ey
ATTEST: DEVELOPER: Mercantile Partners, L.P.
A Texas limited partnership
By: Mercantile Corporation
a Texas corporation
s g ra rtner
z4yzz'e. By:
9V
Corp at Secretary Brian andolph
_- Vice President
Proiect Name—Ouorum Dr Storm Drain n
Uc
(>
~ � _ Oo i
0 �
0
LLI 0 5
o W ca o F- 't
II W a�Z W W o 04
Lij L
o w 0�3 O W U U i
3[
00
0) Vj O J M M \ GQ M ! Z
Z <t mN a o �rn� �i i W FM-
UO J-F-a Y'n o t�mcoD rod Z Q
���Wa, wZ o+7 x,ll II �;- Q• a: W Q
OJ Zo ¢aJ� o aNwNCD QUO � ' N L f-
m Uam z^ No Nz i lid \ 11 w (� F-
� Q <0 w O Q
of I �� O
w
e
LL 3 o m w
is m .Z[°i0
ww F� II
.I x L) o•�`co L 0 00
O �` WH �mdm '� � V)
O
LZ oa mza^ awII •_ Nr
O
U oRuWQOW M z J� m mi O� 00�
iDw �m(0 pcn O W
i, F O N
o��i�, tto°w II III w n
Wfn J ` M z
m z I In lJi Ir I F o X
V) U r 00
o p
. LLJZ Q � `� N J
oY OMm 00 C ¢ O J
OWoo
moo o 0 o
z +W�x.�.� c U o
O Q
�o
O O Q OC14 CD 0
.II�3a F rnO?
Z ww o w W I Fay o III• as z �� O O cn
:'x� o a I �o� o o ~
r\� LL
�`'•. FVW)DWU
JF OUwN
�Oil0 , oU Z
^N= O NcyJ
,iI }
W
ON OW ZU Ow 0cDoO <O Z I,N a . d
o Q CL o OV000 H tD tD pCL w
+y ` O WZO Ow LU x
40
1Wm0Oz¢ oWWH <D(DtD Jin -
Nm w aF Z
Lr
z< D��O ZF- Swyy
mZ�C
b zo N J J
w vO
�1
�
\\ II ro m
� Q
\\ Exx W
\\\\ LLJ a d'
\\ v 6,0, 6
xw 0t pu)N X O
cow Ztooa`n m J
mU0 W
J 00
Lii
ItJJ�JmJ� Q Z Z Z
lzmwzm I�1�1�0_' d JJ }J J J
F-
ix J 1-0Z WZ
d Q Cr F'" Q_'LLJ Z W Ow
om
W O
II W� W¢o Z mxa ox¢
Lil aww n
OV I . a� U U
J m 0 mK X LLI
J x MO
I
OU Ompmm ` YO m
K'0 N
Om z xN 11�tn Q SOD
mLzw-'
��M04 U(ry0 Oj
I . mo o�. I II
� xx� En(0
_ JJZ Jz-Nl-cew I Om
UT.N-?Nfi
JMO'LX3-b'30-AO-8£b'LO-89017Z\JMO\9£b'LO-8904Z\tiZ-OMO\;yI
WJOO:b - Onn7/nl/on L71 VHO1
UNIT I: STORM DRAIN
ITEM APPROX. UNIT DESCRIPTION OF ITEMS WITH BID UNIT PRICE TOTAL
NO. QUANTITY PRICES WRITTEN IN WORDS AMOUNT
1 1 EA Type "B" Headwall for 4'x11' Box
Culvert
Eleven Thousand Dollars and Zero
Cents per each. $ 11,000.00 $ 11,000.00
2 20 LF 4'x11' Box Culvert
Four Hundred Fifty Dollars and
Eighty-One Cents per Linear Foot. $ 450.81 $ 9,016.20
3 1 EA 12'x17' Junction Box
Five Thousand, Two Hundred Sixty-
Eight Dollars and Fifty-Two Cents per
Each. $ 5,268.52 $ 5,268.52
4 280 LF 4'x7' Box Culvert
Two Hundred Fifty-Eight Dollars and
Two Cents per Linear Foot. $ 258.02 $ 72,245.60
5 1 EA 8'x8' Junction Box
Three Thousand, Two Hundred Sixty-
Eight Dollars and Fifty-Two Cents per
Each. $ 3,268.52 $ 3,268.52
6 2 EA TxT Junction Box
Three Thousand, Three Hundred
Seventy Dollars and Thirty-Seven
Cents per Each. $ 3,370.37 $ 6,740.74
7 450 LF 66" RCP
One Hundred Ninety-Five Dollars and
Forty-Six Cents per Linear Foot. $ 195.46 $ 87,957.00
8 515 LF 60" RCP
One Hundred Fifty-Eight Dollars and
Sixty-Seven Cents per Linear Foot. $ 158.67 $ 81,715.05
9 39 LF 36" RCP
Fifty-Seven Dollars and Seventy-Five
Cents per Linear Foot. $ 57.75 $ 2,252.25
10 66 LF 24" RCP
Twenty-Eight Dollars and Sixty-Three
Cents per Linear Foot. $ 28.63 $ 1,889.59
11 2 EA 24" Bend
Two Hundred Eighty-One Dollars and
Thirty-Two Cents per Each. $ 281.32 $ 562.64
12 1 EA 66"x24"Wye Connection
Two Hundred Twenty-Four Dollars
and Nine Cents per Each. $ 224.09 $ 224.09
13 1 EA 66"x36"Wye Connection
Two Hundred Fifty-Three Dollars and
Twenty-One Cents per Each. $ 253.21 $ 253.21
14 3 EA 60"x24"Wye Connection
One Hundred Eighty-Two Dollars and
Thirty Cents per Each. $ 187.30 $ 561.90
15 674 SY 12"-16" Rock Rip-Rap
Sixty-Two Dollars and Zero Cents per
Square Yard. $ 62.00 $ 41,788.00
16 1,265 LF Trench Safety
One Dollar and Zero Cents per Linear
Foot. $ 1.00 $ 1,265.00
TOTAL AMOUNT STORM DRAIN $ 326,008.31
TOTAL AMOUNT BID STORM DRAIN $ 326,008.31
GRAND TOTAL AMOUNT BID $ 326,008.31