Loading...
HomeMy WebLinkAboutIR 8853• RMT M- MI. • At the request of the City Council, City staff has prepared this update on the Hyde Park Transit Plaza project, which includes intersection improvements at Ninth and Throckmorton Streets. Proiect Background The proposed Hyde Park Transit Plaza at the intersection of Ninth and Throckmorton Streets is a collaborative effort by the City, the Fort Worth Transportation Authority (the T), the U.S. General Services Administration (GSA) and Downtown Fort Worth, Inc. The Hyde Park and Ninth Street Advisory Committee, chaired by Councilmember Wendy Davis, oversees the project. Hyde Park was originally conceptualized during the 1999 study of the Intermodal Transportation Center. The study recommended dispersing bus transfer activity throughout Downtown and identified Hyde Park at the intersection • Ninth and Throckmorton Streets as the most promising location for a transit plaza. Since 1999, the City, The T, GSA and Downtown Fort Worth, Inc., have worked together to secure funding and to design the proposed transit plaza. In May 2006, The T purchased the parking lot at the northeast comer of Throckmorton and Ninth Streets that is integral to the transit plaza design. After evaluating circulation options for the Hyde Park Transit Plaza, the City's Downtown Access and Circulation Study Committee (DACS) recommended improving the intersection of 9th/1 Oth/Throckmorton/Jennings Streets, and narrowing Throckmorton Street from four to three lanes. The transit plaza design improves pedestrian circulation for transit riders walking to or from the plaza by simplifying the confusing and dangerous 9th/lOth/Throckmorton/Jennings Streets intersection. By realigning Ninth Street between Throckmorton and Houston Streets into a T-intersection, pedestrian safety and transit access is enhanced, and an attractive public gathering place is created. Page 2 and 3 include an existing conditions map and the proposed transit plaza design. Construction Construction of the transit plaza, including the realignment of Ninth Street, is expected to begin the first quarter of 2008 and should be completed within one year. Ninth Street between Throckmorton and Houston Streets will be closed during construction. Traffic will be rerouted north on Throckmorton to Seventh Street and south on Houston to Eleventh Street. The anticipated construction schedule is below. Should you have any questions, please contact Femando Costa, Director, Pianning and Development Department at 817-392-8042. Charles R. Boswell City lVianager ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8853 June 19, 2007 T To the Mayor and Members of the City Council Page 2 of 3 ,s SUBJECT: Hyde Park Transit Plaza Intersection Improvements Update Figure 1: Existing Conditions AV o ft STREW" 0 0 t3 w 5 0 Z I 11111 ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8853 #s To the Mayor and Members of the City Council June 19, 2007 Page 3 of 3 .;, SUBJECT: Hyde Park Transit Plaza Intersection Improvements Update Figure 2: Hyde Park Transit Plaza ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS