HomeMy WebLinkAboutContract 50573-AR3 CSC No.50573-AR3
FOB R�'1'H. City of Fort Worth
�T Construction Allowance Request#3
Project Name Kimbo Road from N.Sylvania to Mesquite Road City Sec# 50573
Client Project#(s) CO2661
Prole This is a street reconstruction protect including Water/Sank"Sewer Main and Storm Water Improvements
Description
Contract.rIConalser Construction TX,LP City Inspecto Ryan Miller
Funding Allocation Account Sewer Water Stormwater TPW Paving Select Day
Totals Type
Original Contract Amount $945,233. , 55. t , 500
Extras to Date 120
Credits to Date
Current Contract Amount 945,233.00 21, 5.00 899,455.00 2,215,823.00 982,326,00 620
mount of ProposedAllocation 0 00 30
Original Allowance Available for location 0 S 0, 320,000.00
Allowance Funds Previously Allocated ,680.00 $0.00 0.00 20,890.00 26,570.00
Remaining Funds Available for this Allocation 75,3!00 $60,000.00 $60,000.00 $99,110.00 $294,430. 0
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed
Construction Allowance Request(with attachments)to the Construction Allowance Request:this construction allowance will add bid items for the Contractor to perform post
construction TV inspection for the newly installed stormdrain pipes and boxes in Kimbo Rd per Stormwater Division Request
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order.The Project/Program Manager signing below
acknowledges that he/she Is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements. j
i r
f7c
nr�
M&C Number L NIA M&C Date Approved
AJ
RECEIVED OFFICIAL RECORD
MAY -4 2020 CITY SECRETARY
CITYOF FOR FT.WORTH,TX
CfIYSECREIARY EI"ARY
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Name f Employee/Signature
S01
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
ATTEST.
Mary ]. Kayser, City Secretary
OFFICIAL RECORD
CITE'SECRETARY
FT. WORTH,TX
City of Fort Worth
Construction Allowance Additions
Project Name I Kimbo Road Um N. anla to Mesquite Road City Sac# 50573
Client Project#
Comr Conalser Conshuction TX,LP Inspector Ryan Miner
ADDITIONS
as or mound pipe rmwe
nnPost LT I V for ram Box mw er L
er
tar
tormwater
suing
u ns
Construction Allowance Additions Page 2 of 4
F�ART W�og�t 1 City of Fort Worth
T Construction Allowance Deletions
Pmjea Nana Kaft RmA ftm N.Spyania b Cay Sec/ SD573
CGefgp*d# COMI
Caia?serConsbuc6oa T lP I Ryan N®er
DELETIONS
r Unt UnIC09 TOW
ramaga mpmvwe on ance Slonmater
r
r
TPW f
Paving
liub o ns
Construction Allowance Deletions Page 3 of 4
M/SBE Breakdown for this Construction Allowance
MISBE Sub Type of Service Amount for this CO
NIA
Total $0.00
Previous Construction Allowance
CO# DATE AMOUNT
Total $0.00
BIM 360 Document Management Page 1 of 2
AUTODESK'BIM 360' fortworthgov,CO2661-Kimbo Rd.from N.Sylvania to Mesquite Roadway Improvements- A IA
Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES
Reviews > Review detail
CLOSED #45 Construction Allowance Approval
Export Report This review is closed.
NameA Description Version Markup Comments PROGRESS
r 02661_Kimbo Rd_Construction Allowance- -- V2 0 No comments yet.
Initiator Initial Review i.
02661_Kimbo Rd_Construction Allowance_ -- Vl 0 No comments yet.
MH Mary Hanna Apr 7,2:32 PM
<mary.han na @ fortworthtexas.gov>
Submitted to Reviewer 1
Reviewer 1 Initial Review 1 n
LZ Lane Zarate Apr 7,4:13 PM
<lane.za rate@fo rtworthtexa s.gov,
Submitted to Revlewer2
Reviewer Initial Review n
LP Lauren Prieur Apr 8,8:21 AM
<la u re n.prieu r@ fortworthtexas.gov>
Submitted to Reviewer 3
No comments
Reviewer 3 Initial Review 3 i.
W3 William Johnson Apr 8,4:29 PM
<willia m.joh nson @fortworthtexas.gov>
Submitted to Reviewer 4
Approve
Reviewer4 Initial Review4 i.
DB Douglas Black Apr 16,5:45 PM
<doug.black@fortworthtexas.govs
Submitted to Reviewer
approved.
Reviewers Initial Revew5
DB Dana Burghdoff Apr 16.5:53 PM
<d ana.bu rg hd off@fortworthtexas.gov>
Submitted to Approver
Approved
Approver Final Review n
MM Matthew Monedero Apr 20,10:34 AM
<matthew.monedero @fortwo rthtexas.go%
Review ended
Approved Construction Allowance for
Kimbo Rd.from N.Sylvania to
Mesquite Roadway Improvements
Review closed
>
)FNUAL RECORD
CITY SECRETAR..
FTa ,..,.