MAY -5 2020 NOTICE OF PROJECT COMPLETION t3-(D OO-1 -<(j 30q
CV oefff rogr 10 C S -q-7 4 O
DOE.Ns: 7345
Regarding contract 47982 for Northside II 48-Inch Water Main Phase II Part II as required by the Water
Department as approved by City Council on 6/28/16 through M&C C-27822 the Director of the Water Department,
upon the recommendation of the Sr.Capital Projects Officer,Capital Projects Delivery,Water Department,has accepted
the project as complete.
Original Contract Prices: $14,220,423.00
Amount of Approved Change Orders: ($0.96) NO 2
Revised Contract Amount: $14,220,422.04
Total Cost Work Completed: $13,801,786.11
Less Deductions:
Liquidated Damages: Days @$650.00/Day
Other Deductions(see comments):
Total Deduction Amount: $0.00
Total Cost Work Completed: $13,801,786.11
Less Previous Payments: $13,260,990.60
Final Payment Due $540,79551
Recommended for Acceptance Date
SR. Capital Projects Officer Capital Projects Delivery
C�Lkxht40&e hakdejV May 5, 2020
Christopher Kfirder(May 4,2020)
Accepted Date
Director, Water Department
May 5, 2020
Dana urghdoff(Df y4,20
City Manager Date
OFFICIAL RECORD
CITY SECRETARY
Fr WORTH,TX
Project Name:Northside H 48-Inch Water Main Phase II Part II DOE.Ns:7345
Comments:
M
AL RECORDECRETARYWORTH.-TX
IvDD
FEB 2 0 2020
6—i�Oa-I -Ca 0 Oq
City Project Numbers 02304 DOE Number 7345 G Se-1
Contract Name Northside 1I 48-Inch Water Main Phase 11,Part 2, Estimate Number 50
Contract Limits from Wagley Robertson Road to Park-view Hills Lane Payment Number 50
Project Type Paving&Drainage For Period Ending 10/25/2019
Project Funding 0 �Zy
Project Manager Sauceda City Secretary Contract Number 47982
Inspectors JOHNSON / BRICE Contract Date 6/28/2016
Contractor S.J.LOUIS CONSTRUCTION OF TEXAS,LTD Contract Time 7-W CD I f
P.O.BOX 834 Days Charged to Date 7VAW CD
MANSFIELD, TX 76063-0834 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
- --- -- --- ------------------------------
�u,2_GZ3.na_ZZG� /G3,ay' �1 27l> 32�1l0- g-W5�
Total Cost of Work Completed $13,801,786.11
Less 0 %Retained $0.00
Net Earned $13,801,786.11
Earned This Period $540,795.51
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $13,260,990.60
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $540,795.51
Wednesday,February 19,2020 Page 7 of 7
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name Northside II 48-Inch Water Main Phase II,Part 2,
Contract Limits from Wagley Robertson Road to Park--view Hills Lane
Project Type Water
City Project Numbers 02304
DOE Number 7345
Estimate Number 50 Payment Number 50 For Period Ending 10/25/2019
CD
City Secretary Contract Number 47982 Contract Time 74CD
Contract Date 6/28/2016 Days Charged to Date 747
Project Manager Sauceda Contract is 97.000 Complete
Contractor S.J.LOUIS CONSTRUCTION OF TEXAS,LTD
P.O.BOX 834
MANSFIELD, TX 76063-0834
Inspectors JOHNSON / BRICE
Wednesday,February 19,2020 Page 1 of 7
City Project Numbers 02304 DOE Number 7345
Contract Name Northside II 48-Inch Water Main Phase II,Part 2, Estimate Number 50
Contract Limits from Wagley Robertson Road to Park-view Hills Lane Payment Number 50
Project Type Water For Period Ending 10/25/2019
Project Funding
Section A:Water
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
la 3311.1074 48"Bar Wrapped Concrete 18700 LF $275.00 ;,142,500.00 18692 5,140,300.00
2a 3311.1077 48"Bar Wrapped Concrete 230 LF $577.00 $132,710.00 237 $136,749.00
3a 3305.2011 48"Bar Wrapped Concrete 260 LF $355.00 $92,300.00 253 $89,815.00
4a 3305.2011 48"Bar Wrapped Concrete 2480 LF $286.00 $709,280.00 2486 $710,996.00
5a 3311.0021 Bar Wrapped Concrete Cyli 1 LF $1.00 $1.00 1 $1.00
6a 3304.0002 Cathodic Protection Syste 1 LS $40,000.00 $40,000.00 0.6 $24,000.00
7 3305.1207 72"Casing/Tunnel Liner P 2280 LF $1,415.00 5,226,200.00 2286 3,234,690.00
8 3312.1004 4"Combination Air Valve 11 EA $16,800.00 $184,800.00 11 $184,800.00
9 3312.6003 8"Blow Off Valve&Vault 10 EA $15,000.00 $150,000.00 10 $150,000.00
10 3312.5002 48"AWWA Butterfly Valve, 8 EA $83,000.00 $664,000.00 8 $664,000.00
11 3312.0112 Connection to Existing 48 3 EA $11,000.00 $33,000.00 3 $33,000.00
12 3339.1101 Access Manhole for Water M 5 EA $7,300.00 $36,500.00 5 $36,500.00
13 3305.0112 Concrete Collar for Water 22 EA $500.00 $11,000.00 22 511,000.00
14 3305.0112 Concrete Collar for Water 5 EA $200.00 $1,000.00 5 $1,000.00
15a 3305.0103 Exploratory Excavation of 35 EA $1.00 $35.00 35 $35.00
16 0241.2102 6-Inch Sewer Abandonment 2 EA $100.00 $200.00 2 $200.00
17 0241.2001 Sanitary Line Grouting 1 CY $300.00 $300.00 1 $300.00
18 3341.0103 18"RCP,Class 1II 20 LF $81.00 $1,620.00 12 $972.00
19 3341.0201 2 1"RCP,Class III 40 LF $87.00 $3,480.00 36 $3,132.00
20 3341.0205 24"RCP,Class III 100 LF $96.00 $9,600.00 84 $8,064.00
21 3341.0302 30"RCP,Class 111 50 LF $110.00 $5,500.00 48 $5,280.00
22 3201.0400 Temporary Asphalt Paving 1500 LF $43.00 $64,500.00
23 3201.0127 10'Wide Asphalt Paving R(CO#1) 20.4 LF $90.00 $1,836.00 1100 $99,000.00
24 3201.0202 Asphalt Paving Repair Bey 100 SY $81.00 $8,100.00
25 3201.0616 Concrete Paving Repair,A 550 SY $89.00 $48,950.00 501.66 $44,647.74
26 3211.0315 12"Flexible Base,Type D 500 SY $10.00 $5,000.00 3037 $30,370.00
27 3305.0109 Trench Safety 20580 LF $0.20 $4,116.00 19215 $3,843.00
28 3305.0110 Utility Markers I LS $5,000.00 $5,000.00 1 $5,000.00
29 3301.0002 Post CCTV Inspection for 21660 LF $1.00 $21,660.00 21636.72 $21,636.72
30 3292.0400 Seeding,Hydromulch 96250 SY $0.50 $48,125.00 92735 $46,367.50
31 9999.0100 Articulated Concrete Cabl 100 SY $192.00 $19,200.00 100 $19,200.00
Wednesday,February 19,2020 Page 2 of 7
City Project Numbers 02304 DOE Number 7345
Contract Name Northside II 48-Inch Water Main Phase II,Part 2, Estimate Number 50
Contract Limits from Wagley Robertson Road to Park-view Hills Lane Payment Number 50
Project Type Water For Period Ending 10/25/2019
Project Funding
32 3125.0101 SWPPP>1 Acre for Entire P 1 LS $50,000.00 $50,000.00 1 $50,000.00
33 3305.0202 Imported Back-fill,CSS 100 CY $80.00 $8,000.00
34 3305.0203 Imported Backfill,CLSM( 100 CY $90.00 $9,000.00 37 $3,330.00
35 3305.0204 Imported Embedment/Backfi 60 CY $30.00 $1,800.00
36 3305.0206 Imported EmbedmentBackfi 60 CY $15.00 $900.00
37 3305.0207 Imported Embedment/Backfi 60 CY $12.00 $720.00
38 3441.3502 Relocate Street Light Pol 1 EA $7,000.00 $7,000.00 1 $7,000.00
39 3231.0211 Barbed Wire Fence,Metal 150 LF $5.00 $750.00 150 $750.00
40 3231.0114 Temporary 6'Chain Link, 9000 LF $2.50 $22,500.00 3183 $7,957.50
41 3231.0306 16'Gate,Steel 3 EA $3,000.00 $9,000.00 3 $9,000.00
42 9999.0200 Construction Staking 1 LS $22,000.00 $22,000.00 1 $22,000.00
43 9999.0201 Construction Survey 1 LS $3,000.00 $3,000.00 1 $3,000.00
44 9999.0300 Construction Contingency 1 LS $300,000.00 $300,000.00 0.30823 $92,469.00
45A Release from Property owner for tree I LS $3,710.00 $3,710.00 1 $3,710.00
46A Compensate for Sunday Work at City's request 1 EA $7,904.00 $7,904.00 1 $7,904.00
47A Asphalt Paving Prep. I EA $243,000.00 $243,000.00 1 $243,000.00
48A Sundance Re-Mob for tunnel under BNSF 1 EA $15,000.00 $15,000.00 1 $15,000.00
49A New APOC ARV with Buy American Forms I EA $1,850.00 $1,850.00 1 $1,850.00
50A Live Oak Tree Replacement for Saginaw 6 EA $978.34 $5,870.04 6 $5,870.04
51A Irrigation Inst.From Silverbrook Dr.to Bridle Tr. 1 LS $4,689.00 $4,689.00 1 $4,689.00
52A Pedestrian Crossing Light SE corner of Old Decatur I LS $4,140.00 $4,140.00 1 $4,140.00
and Park Center
-------------------------------- ------
Sub-Total of Previous Unit $11,391,346.04 $11,186,568.50
SectionB:Paving&Drainage
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
-- -------------- -- -
1 3341.0103 18"RCP,Class 1II 660 LF $81.00 $53,460.00 660 $53,460.00
2 3349.0001 4'Storm Junction Box 2 EA $3,300.00 $6,600.00 2 $6,600.00
3 3349.6001 10'Recessed Inlet 2 EA $3,600.00 $7,200.00 2 $7,200.00
4 3349.6002 15'Recessed Inlet 3 EA $4,700.00 $14,100.00 3 $14,100.00
5 3349.6003 20'Recessed Inlet I EA $6,000.00 $6,000.00 1 $6,000.00
6 3349.5002 15'Curb Inlet I EA $4,600.00 $4,600.00 1 $4,600.00
7 0241.1506 2"Surface Milling 1530 SY $4.50 $6,885.00
8 0241.4001 Remove 10'Curb Inlet 1 EA $300.00 $300.00 1 $300.00
Wednesday,February 19,2020 Page 3 of 7
City Project Numbers 02304 DOE Number 7345
Contract Name Northside II 48-Inch Water Main Phase II,Part 2, Estimate Number 50
Contract Limits from Wagley Robertson Road to Park-view Hills Lane Payment Number 50
Project Type Paving&Drainage For Period Ending 10/25/2019
Project Funding
9 3305.0005 12"Waterline Lowering 5 EA $7,000.00 $35,000.00 6 $42,000.00
10 0241.0100 Remove Sidewalk 30 SF $1.00 $30.00 1216 $1,216.00
11 0241.0300 Remove ADA Ramp 5 EA $300.00 $1,500.00 5 $1,500.00
12 0241.0401 Remove Concrete Drive 550 SF $1.00 $550.00 584 $584.00
13 241.1000 Remove Conc Pvmt 0 32930 SY $8.00 $263,440.00 32930 $263,440.00
14 3123.0101 Unclassified Excavation b 3430 CY $10.00 $34,300.00 3430 $34,300.00
15 3211.0400 Hydrated Lime 765 TN $200.00 $153,000.00 886.63 $177,326.00
16 3211.0502 8"Lime Treatment 31800 SY $4.45 $141,510.00 32821.3 $146,054.79
17 3212.0203 4"Asphalt Pvmt Type C 600 SY $28.00 $16,800.00
18 3212.0302 2"Asphalt Pvmt Type D 1530 SY $15.70 $24,021.00
19 3213.0105 10"Cone Pvmt 27600 SY $51.75 428,300.00 29488.84 1,526,047.47
20 3213.0205 10"Cone Pvmt HES 3200 SY $110.00 $352,000.00 1507.55 $165,830.50
21 3214.0100 Brick Pvmt 500 SY $78.00 $39,000.00 595 $46,410.00
22 3213.0301 4"Cone Sidewalk 30 SF $7.00 $210.00 1216 $8,512.00
23 3213.0402 7"Concrete Driveway 550 SF $10.00 $5,500.00 583.77 $5,837.70
24 3213.0506 Barrier Free Ramp,Type P 1 EA $2,500.00 $2,500.00 1 $2,500.00
25 3213.0501 Barrier Free Ramp,Type R 4 EA $3,000.00 $12,000.00 4 $12,000.00
26 3217.0001 4"SLD Pvmt Marking HAS( 15640 LF $0.70 $10,948.00 9085 $6,359.50
27 3217.0002 4"SLD Pvmt Marking HAS( 2710 LF $0.70 $1,897.00 1515 $1,060.50
28 3217.0003 4"BRK Pvmt Marking HAS( 3870 LF $0.70 $2,709.00 2519 $1,763.30
29 3217.0004 4"BRK Pvmt Marking HAS( 1260 LF $0.70 $882.00 437 $305.90
30 3217.0005 4"DOT Pvmt Marking HAS( 110 LF $0.70 $77.00 278 $194.60
31 3217.0007 4"SLD Pvmt Marking Tape 1560 LF $3.00 $4,680.00
32 3217.0008 4"SLD Pvmt Marking Tape 3880 LF $3.00 $11,640.00
33 3217.0201 8"SLD Pvmt Marking HAS( 5600 LF $1.50 $8,400.00 4486 $6,729.00
34 3217.0301 12"SLD Pvmt Marking HAE 1350 LF $3.80 $5,130.00 539.5 $2,050.10
35 3217.0501 24"SLD Pvmt Marking HAE 350 LF $7.50 $2,625.00 171.5 $1,286.25
36 3217.1002 Lane Legend Arrow 58 EA $175.00 $10,150.00 45 $7,875.00
37 3217.1004 Lane Legend Only 22 EA $185.00 $4,070.00 12 $2,220.00
38 3217.1006 Lane Legend Bike 51 EA $510.00 $26,010.00 30 $15,300.00
39 3217.2102 REFL Raised Marker TY I-C 180 EA $4.00 $720.00 61 $244.00
40 3217.4301 Remove 4"Pvmt Marking 1190 LF $1.00 $1,190.00 1190 $1,190.00
41 3217.4303 Remove 8"Pvmt Marking 220 LF $1.00 $220.00 220 $220.00
42 3291.0100 Topsoil for Median Restor 410 CY $16.00 $6,560.00 530 $8,480.00
Wednesday,February 19,2020 Page 4 of 7
City Project Numbers 02304 DOE Number 7345
Contract Name Northside II 48-Inch Water Main Phase II,Part 2, Estimate Number 50
Contract Limits from Walley Robertson Road to Parkview Hills Lane Payment Number 50
Project Type Paving&Drainage For Period Ending 10/25/2019
Project Funding
43 3292.0100 Block Sod Placement 2450 SY $3.00 $7,350.00 3450 $10,350.00
44 3471.0001 Traffic Control 12 MO $1.00 $12.00 21 $21.00
45 3471.0002 Portable Message Sign 32 WK $250.00 $8,000.00 67 $16,750.00
46 9999.0200 Construction Staking 1 LS $6,000.00 $6,000.00 1 $6,000.00
47 9999.0201 Construction Survey 1 LS $1,000.00 $1,000.00 1 $1,000.00
48 9999.0301 Construction Contingency 1 LS $100,000.00 $100,000.00
Sub-Total of Previous Unit $2,829,076.00 $2,615,217.61
Wednesday,February 19,2020 Page 5 of 7
City Project Numbers 02304 DOE Number 7345
Contract Name Northside H 48-Inch Water Main Phase 11,Part 2, Estimate Number 50
Contract Limits from Wagley Robertson Road to Park-view Hills Lane Payment Number 50
Project Type Paving&Drainage For Period Ending 10/25/2019
Project Funding
Contract Information Summary
Original Contract Amount $14,220,423.00
Change Orders
Change Order Number 1 ($0.96)
Change Order Number 2 $0.00
Total Contract Price $14,220,422.04
Date Zo Total Cost of Work Completed $13,801,786.11
Con ract r V
�r Less 0 %Retained $0.00
Date �`�'�"w Net Earned $13,801,786.11
Inspection Supervisor Earned This Period $540,795.51
9 Retainage This Period $0.00
"ate 2 /9-2-0 Less Liquidated Damages
Manager
Days @ /Day $0.00
k1 a Date LessPavement Deficiency $0.00
Asst.Director/TPW Less Penalty $0.00
Cl v/46?AL hakde`
Chrlst pherX rder(May4,2020) Date Less Previous Payment $13,260,990.60
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $540,795.51
Wednesday,February 19,2020 Page 6 of 7
® � ® T rev 03/05/07
WATER ENGINEERING & FISCAL SERVICES
FINAL. STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.: e-®
NAME OF PROJECT: &611 49' rP-AA1SA4 I S St as,J .,^J PHA S E PAP-7- 2.
PROJECT NO.: CPA[ 2304. CONTRACTOR:
DOE NO.;
PERIOD FROM. TO: FINAL INSPECTION DATE: `I-/S-`9
WORK ORDER EFFECTIVE: e29 e ®6 - fl CONTRACT TIME: S 7c, ® WD O CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH CHARGED CREDITED MONTH CLING CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
S. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD
PREVIOUS
PERIOD 747
TOTALS
TO DATE 747 74-71
*REMARKS:
7j, 11 Zo �m
CONTRACTOR DATf 1 INSPECT R DATE
WATER ENGINEERING&FISCAL SERVICES
The City of Fort Worth e 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477 •Fax: (817)392-8460
FORTWORTH
WATER ENGINEERING &FISCAL SERVICES
PIPE REPORT FOR:
PROJECT NAME: NS H 48"Transmission Main Phase 2,Part 2
PROJECT NUMBER: CPN#02304
DOE NUMBER: 7345
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Concrete Cylinder 48" bar wrapped concrete cylinder 21,668
FIRE HYDRANTS: 0 VALVES(16"OR LARGER) 8
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Every 250 LF
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
WATER ENGINEERING&FISCAL SERVICES
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-4477 •Fax: (817)392-8460
FT RTC:02,20,07
WATER ENGINEERING & FISCAL SERVICES
PERFORMANCE EVALUATION OF CONTRACTOR
n CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
SJ Louis Construction of Texas Northside II 48"Transmission Main Phase 2,Part 2
Water Engineering Inspector DOE Number
Raymond Brice CPN#02304
Water Engineering Inspector Project Manager
0 Water ❑waste Water [21 Storm Drainage 0 Pavement John Kasovich
Initial Contract Amount Project Difficulty
$14,220,423.00 0 Simple 0 Routine OQ Complex
Final Contract Amount Date
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 2 60 30
5 Work Performed 15 Y 2 60 30
6 Finished Product 15 Y 2 60 30
7 Job Site Safety 15 Y 1 60 15
8 Traffic Control Maintenance 15 Y 2 60 30
9 Daily Clean Up 5 Y 2 20 10
10 Citizen's Complaint Resolution 5 Y 1 20 5
11 Property Restoration 5 Y 2 20 10
12 After Hours Response 5 Y 2 20 10
13 Project Completion 5 Y 1 20 5
TOTAL ELEMENT SCORE(A) 211
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 211
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating((TS/MS] x 100%) 211 / 448 = 47%
Performance Category Standard
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature Inspector Signature Contractor W4 Allpe
Signature Inspector's Supervisor
CONTRACTOR'S COMMENTS
WATER ENGINEERING&FISCAL SERVICES
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477 •Fax: (817)392-8460
FORTWORTHREV:02/22/07
WATER ENGINEERING AND FISCAL SERVICES
CONTRACTOR'S EVALUATION OF CITY
1)PROJECT INFORMATION Date:
Name of Contractor Project Name
SJ Louis of Texas Northside II 48"Transmission Main Phase 2,Part 2
Water Engineering Inspector Project Manager
Raymond Brice John Kasovich
DOE Number Project Difficulty Type of Contract
CPN#02304 0 Simple 0 Routine 0 Complex 0 water ❑waste water ❑Storm Drainage ❑ Pavement
Initial Contract Amount Final Contract Amount
$14,220,423.00
In PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions z
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details 7-
3 Accuracy of Measured Quantities Z 3 Applicability of Specifications 7-
4 Display Of Professionalism 3y 4 Accuracy of Plan Quantities 2-
5 Citizen Complaint Resolution L PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs Z 1 Knowledge And/Or Problem Resolution 2—
ADMINISTRATION 2 Availability of Project Manager Z
1 Change Order Processing Time ► 3 Communication Z
2 Timliness of Contractor Payments 1 4 Resolution of Utility Conflicts Z
3 Bid Opening to Pre-Con Meeting Timeframe Z.
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
A
Signature Inspector ,
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
Water Engneei ing and Fiscal Services
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-4477•Fax: (817) 392-8460
FORT WORTH
CONTRACTOR'S AFFIDAVIT
OF RELEASE OF LIENS
The City of Fort Worth
PROJECT: Northside II 48-Inch Water Transmission Main, PROJECT NUMBER:
Phase 2—Part 2
OWNER: City of Fort Worth,Texas 002304
CONTRACTOR: S.J. Louis Construction of Texas, Ltd. 21611
ENGINEER: Freese and Nichols.
The Contractor, in accordance with the Contract Documents, and in consideration for the full and final payment to
the Contractor for all services in connection with the project, does hereby waive and release any and all liens, or
any and all claims to liens which the Contractor may,have on or affecting the project as a result of its contract(s)
for the Project or for performing labor and/or fdrnishing materials in any way connected with the construction of
any aspect of the project. The Contractor further certifies and,warrants that all subcontractors of labor and/or
materials for the Project, except as listed below, have been paid in full for all labor and/or materials supplied to, for,
through or at the direct or indirect request of the Contractor prior to, through and including the date of this affidavit.
EXCEPTIONS: (If none, write"NONE". The Contractor shall furnish a bond, acceptable to the Owner, for
each exception.)
None
CODY LEWIS SEARS
n=Notary Public, State of Texas
Comm. Expires 08-01-2020
CONTRACTOR S.J. Louis Construction of Texas. Ltd. ,,,,,.$' Notary ID 130760871
By Adam H. Lunsford
Title Vice President
Subscribed and sworn to before me•this 29th day of March 12019
Notary Public: � ---
My Commission Expires: 08/01/2020
FORT WORTH Bond #190034858
CONSENT OF SURETY COMPANY
City of Fort Worth,TX TO FINAL PAYMENT
PROJECT: Northside II 48-Inch Water Transmission Main, Phase 2—Pt. 2 PROJECT NUMBER:
OWNER: —City of Fort Worth Texas 02304
CONTRACTOR: S.J. Louis Construction of Texas, Ltd. 21611
ENGINEER: Freese and Nichols, Inc. I FTW14497
The Surety Company, on bond of the Contractor listed above for the referenced project, in accordance with the
Contract Documents, hereby approves final payment to the Contractor, and agrees that final payment to the
Contractor shall not relieve the Surety Company of any of its obligations to the Owner under the terms of the
Contract and as set forth in said Surety Company's bond.
In witness whereof, the Surety Company has hereunto set its hand this 29th day of March 2019
Liberty Mutual Insurance Company
Surety Company
By
Authorized RepresentaNve
Title Sophinie Hunter, Attorney-In-Fact
Address:
2200 Renaisssance Blvd. #400
King of Prussia, PA 19406
Attach Power of Attorney
This Power of Attorney limits the acts of those named herein,and they have no authority to
bind the Company except in the manner and to the extent herein stated.
Liberty, Liberty Mutual Insurance Company
pc The Ohio Casualty Insurance Company Certificate No: 8200274
SURETY West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire,that
Liberty Mutual Insurance Company is a corporation duly organized underthe laws of the State of Massachusetts,and WestAmerican Insurance Company is a corporation duly organized
under the laws of the State of Indiana(herein collectively called the"Companies"),pursuant to and by authority herein set forth,does hereby name,constitute and appoint,
Robbi Morales,Don E.Cornell,Sophinie Hunter,Tina McEwan,Ricardo J.Reyna,Joshua Saunders,Kelly A.Westbrook
all of the city of Dallas state of TX each individually if there be more than one named,its true and lawful attorney-in-fact to make,
execute,seal,acknowledge and deliver,for and on its behalf as surety and as its act and deed,any and all undertakings,bonds,recognizances and other surety obligations,in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this 1 lth day of January 2019
Liberty Mutual Insurance Company
P�INSU/�9 POSY INSLp tNSU y The Ohio Casualty Insurance Company
�'� o°�O�> yo hJ o°�0�4>q2 SUP p°RPORgT ti� West American Insurance Company >
Fo a 3 Fo 3 Fo c� ce
1912 0 1919 V 1991 0 /J
Yd�9SSACHU a3 SO NAMP`��,aD� Y, �NDIAtk .da3
C
N 8/� * ht� By. Cr
c David M.Carey,Assistant Secretary
State of PENNSYLVANIA
=5 County of MONTGOMERY ss
c
Cc
+)
0 o On this l lth day of January 2019 before me personally appeared David M.Carey,who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance o
o Company,The Ohio Casualty Company,and West American Insurance Company,and that he,as such,being authorized so to do,execute the foregoing instrument for the purposes=
a`) > therein contained by signing on behalf of the corporations by himself as a duly authorized officer. v W
IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia,Pennsylvania,on the day and year first above written. n
PAST O
*p�°�WF ¢`� COMMONWEALTH OF PENNSYLVANIA
LO ate, o� ��R{.y, Nota
OF Teresa Pas
rial Seal C)
tella,Notary Public /,,�G L
02 Upper MerionTwp.,Montgomery County By: a)C 9 1p "OF �°' My Commission Expires March 28,202 E
of wr,{wa� Teresa Pastella,Notary Public O m
N Member,Pennsylvania Association of Notaries O
C) y 0
m This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual:rn
o.E Insurance Company,and West American Insurance Company which resolutions are now in full force and effect reading as follows: o m
a- ARTICLE IV-OFFICERS:Section 12.Power of Attorney. �2
o Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the 2 a)
o >, President may prescribe,shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Corporation to make,execute,seal,acknowledge and deliver as surety >o
many and all undertakings,bonds,recognizances and other surety obligations.Such attorneys-in-fact,subject to the limitations set forth in their respective powers of attorney,shall N
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation.When so executed,such "- °O
Z :3 instruments shall be as binding as if signed by the President and attested to by the Secretary.Any power or authority granted to any representative or attomey-in-fact under the w c�i
provisions of this article may be revoked at any time by the Board,the Chairman,the President or by the officer or officers granting such power or authority.
ARTICLE XIII-Execution of Contracts:Section 5.Surety Bonds and Undertakings. o-
Any officer of the Company authorized for that purpose in writing by the chairman or the president,and subject to such limitations as the chairman or the president may prescribe, H
shall appoint such attorneys-in-fact,as may be necessary to act in behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,
bonds,recognizances and other surety obligations.Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney,shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company.When so executed such instruments shall be as binding as if
signed by the president and attested by the secretary.
Certificate of Designation-The President of the Company,acting pursuant to the Bylaws of the Company,authorizes David M.Carey,Assistant Secretary to appoint such attorneys-in-
fact as may be necessary to act on behalf of the Company to make,execute,seal,acknowledge and deliver as surety any and all undertakings,bonds,recognizances and other surety
obligations.
Authorization-By unanimous consent of the Company's Board of Directors,the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company,wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds,shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I,Renee C.Llewellyn,the undersigned,Assistant Secretary,The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company,and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full,true and correct copy of the Power of Attorney executed by said Companies,is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF,I have hereunto set my hand and affixed the seals of said Companies this 29th day of March 2019
INS
�JQ G R 0Ry�y0 yJPG°RPORq�Pq� \VP oR o a�'-P
R' ? Fo C� 2 `c0 +AIJ�
LU
1912 0 0 1919 0 1991 C.) l
y o Q o
9ss 'Cy 3 y may �a- ya 3 By:
e
ACHU`� .aa 0 NAMPS� a � �NDIANP a
ex� * d Renee C.Llewellyn,Assistant Secretary
LMS-12873 LMIC OCIC WAIC Multi Co 062018
Liberty
u
SURETY
TEXAS TEXAS
IMPORTANT NOTICE AVISO IMPORTANTE
To obtain information or make a complaint: Para obtener informacion o para someter una
quej a:
You may call toll-free for information or to Usted puede lla.mar al numero de telefono gratis
make a complaint at para informacion o para someter una queja al
1-877-751-2640 1-877-751-2640
You may also write to: Usted tambien puede escribir a:
2200 Renaissance Blvd., Ste. 400 2200 Renaissance Blvd., Ste. 400
King of Prussia, PA 19406-2755 King of Prussia, PA 19406-2755
You may contact the Texas Department of Puede comunicarse con el Departamento de
Insurance to obtain information on companies, Seguros de Texas para obtener informacion
coverages, rights or complaints at acerca de companias, coberturas, derechos o
1-800-252-3439 quejas al
1-800-252-3439
You may write the Texas Department of Insurance Puede escribir al Departamento de Seguros
Consumer Protection(111-1 A) de Texas Consumer Protection(111-1 A)
P. O. Box 149091 P. O. Box 149091
Austin, TX 78714-9091 Austin, TX 78714-9091
FAX: (512) 490-1007 FAX 4 (512) 490-1007
Web: http://www.tdi.texas. ov Web: http://www.tdi.texas.gov
E-mail: ConsumerProtection cgtdi.texas.gov E-mail: ConsumerProtection&tdi.texas. ov
PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS:
Should you have a dispute concerning your Si tiena una disputa concerniente a su prima o a
premium or about a claim you should first un reclamo, debe comunicarse con el agente o
contact the agent or call 1-800-843-6446. primero. Si no se resuelve la disputa, puede
If the dispute is not resolved, you may contact the entonces comunicarse con el departamento (TDI)
Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR UNA ESTE AVISO A SU POLIZA:
POLICY:
This notice is for information only and does not Este aviso es solo para proposito de informacion
become a part or condition of the attached y no se convierte en parte o condicion del
document. documento adjunto.
NP 70 68 09 01
LMS-15292 10/15
FO RT WO RT H City of Fort Worth ;:7 SE
r C.R PAR1�'
Change Order Request j'J RA('TN0. 4?a9oa-CW-
Project Name:I Northside II 48-Inch Water Main Phase II,Part II City Sec No.: 47982
Project No.(s): 56005-0600430-CO2304 DOE No. N\A City Proj.No.: CO2304
Project Description: 48-Inch Water Maininstallation from Wagley Robertson Rd.to Parkview Lane
R�
CCx�
*,o ��.Contractor:1 S.J.Louis Construction of Texas, Ltd. Change Order# Date: 1/14/2020
<90�ity Project Mgr.1 John Kasavich City Inspector: I Raymond Brice
",Phone Number: 817-392-8480 Phone Number: 817-392-8452
Dept. Water Paving and Totals Contract Time
Drainage (Calender days)
Original Contract Amount $11,391,347.00 $2,829,076.00 $14,220,423.00 540
Extras to Date 039
Credits to Date $0.96 $0.96
Pending Change Orders(in M&C Process)
Contract Cost to Date $11,391,346.04 $2,829,076.00 $14,220,422.04 579
$0.00 $0.00 $0.00 $0.00 168
Revised Contract Amount $11,391,346.04 $2,829,076.00 $14,220,422.04 747
Original Funds Available for Change Orders $429,700.00 $429,700.00
Remaining Funds Available for this CO $429,700.96 $429,700.96
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.00%
MAXALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $17,775,528.75
JUSTIFICATION(REASONS)FOR CHANGE ORDER
Change order No. 2 will provide for an additional 168 days time on the project for the time it took to acquire
easements and railroad permits that had not been acquired at the time the project was advertised for bid.The
contractor was not able to work in the applicable areas until the easements and permits were acquired.
� .A. f,... t-ti�,
Attested by:
.Alison Tidwell,Assistant to the City Secretary
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order.
Contractor's Company Name Contractor Name ConLraggr Signature Pat@
S.J..Lpuis Construction of Texas,Ltd. Adam Lunsford
In Date Project Manager Date
Assistant Director(Water Dept) Date Construction Supervisor(Water Dept) Date
Assi to Cit orney Da Apsi ant City Mana-ger Date
Z za u 2-7 ;7 L�
Council Action(If Required)
M&C Number N/A M&C Date Approved NA
Fc,n-r WO P,'I'm City of Fort Worth
Change Order Additions
Project Name Northside II 48-Inch Water Main Phase Il,Part II City Sec No.: 47982
Project No.(s): 56005-0600430-CO2304 DOE No. N\A City Proj.No.: CO2304
Project 48-Inch Water Maininstallation from Wagley Robertson Rd.to Parkview Lane
Description
Contractor S.J.Louis Construction of Texas,Ltd. Change Order: Date: 1/14/2020
City Project Mgr. John Kasavich City Inspector Raymond Brice
ADDITIONS
DEPT Qty Unit Unit Cost Total
Water
Paving and Drainage
Page 2 of 4 Additions Sub Total
�-g VVb P,-rm City of Fort Worth
Change Order Deletions
Project Name Northside II 48-Inch Water Main Phase II,Part II City Sec No.: 1 47982
Project No.(s): 56005-0600430-CO2304 DOE No. N\A City Proj.No.: CO2304
Project Description 48-Inch Water Maininstallation from Wagley Robertson Rd.to Parkview Lane
Contractor S.J.Louis Construction of Texas,Ltd. Change Order: F2—] Date 1/14/2020
City Project Mgr. John Kasavich City Inspector: Raymond Brice
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
Water
Paving and Drainage
Page 3 of 4 IDeletions Sub Total
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Name of Employee
Title
FORTWORTH
February 19,2020
S.J.Louis Construction of Texas,LTD
P.O.Box 834
Mansfield,TX 76063-0834
Re:Acceptance Letter
Project Name: Northside II 48-Inch Water Main Phase II Part II
Project Type: Water,Paving
Project N2: 02304
DOE. N2: 7345
Contract Ns: 47982 Dated: 6/28/2016
Gentleman:
On November 15,2019 a final inspection was made on the subject project. There were punch list items
identified at the.time. The punch list items were completed on November 15,2019. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore
accepted by the City. The warranty period will start on November 15,2019,which is the date of punch list
completion and will extend for(2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance,please feel free to contact me at(817) 392-6054
Yours Truly,
TO n
Tony Sholola,P.E.,SR. Capital Projects Officer, Capital Projects Delivery
TS /
cc: Chris Harder,P.E.,Director,Water Department
Laura Wilson,P.E.,Deputy Director,Water Department
Captain Michael Strains,Fire Department
Bill Lundval, Sanitary Sewer Systems Superintendent,Water Department
Roger Hauser, Water Systems Superintendent,Water Department
John Kasavich,P.E.,Project Manager
David R Johnson,Supervisor, Capital Projects Delivery,Water Department
Raymond Brice,Inspector, Capital Projects Delivery,Water Department
Olivia Kerss,P. E.,Freese and Nichols, Consultant
S.J.Louis Construction of TX,LTD, Contractor
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * 1000 THROcKMORTON STREET * FORT WORTH, TEXAS 76102
817-392-8240 * Fax 817-392-8195
(j Printed on recycled paper
RECE[VED CSC No.47982-0O3
APR -'o 2020 Fn -r lon-r m City of Fort Worth
--
CR1(OFFORTWOh'TH Change Order Request
my SECRETARY Projed Name: Nodhsade B 49-Inch Water Maki Phase If Part II City sec No. 47982
Ptmjed 140.(s); 5w�c�T.3C4 DOE No. CITY Prof.ltb-'' C132304
Prnjed vesaipcnn 48-1mh Watar r,'la:TjnstalaIfon firom Wesley Robertson Rd.to Parkvimv Lane
Contractor S.J.t o&Construction of Texas,Lld. Change Order# Date. 3/28/2020
City Project Mgr.I John Kasavkh —� City Inspector. I Raymond Brice
Phorre Ni nfb2r; 817-M4480 Phone Rumbar 817-392-v452
Dept dater Paving and Totals Contract Time
Drainage (Calender days)
Original Ccntracl Amount $11,391,347.00 1 $2,829,076.00 $14,220,423.00 540
Extras to Bale 0207
Credits to Date $0.96 $0.96
Pending Change Orders("m I•A&C Process)
Contract Cost to Date $il,391,346.04 $2,829,076.00 1 $14,220,422.04 747
$0.00 1 $0.00 $0.00 418
Revised Contract Amount $il,391,346.04 $2,829,076.00 $14,220,422.04 1165
Original Funds Available for Change Orders $429,700.00 $429,700,00
Remaining Funds Avallable for this CO $429,700.95 $429,700.96
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 0.0(m
1,14XALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $17,775,528.75
JUSTIFICATION(REASONS)FOR CHANGE ORDER
The change order will provide additional time of the project for the time It took to procure all necessary permits
and easements that were acquired subsequent to receipt of bids on the project.
i
f
I
f
i
I�
1
It Is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents
payment in full(both time and money)for all costs wising out of,or Incidental to,the above Change Order.
Contractors Company Name Contractor Name A Spniractor stature Date
S.Jkouls Construction of—texas,Ltd. Adam Lunsford
r Date Pro ect Manager Date
Director(W ter apt) Date on uclion Supervisor(Water Depl) Date
T.S. Apr2,2020
Assistant City Attorney Date Assistant City Manager Dale
A r 3 2020 Apr 3,2020
Councll AdIon(If Required)
M&C Number N/A M&C Date Approved NIA
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Northside II 48-Inch Water Main Phase 9 Part II City Sec No.: 47982
Project No.(s): 56005-0600430-CO2304 DOE No. N\A City Proj.No.: CO2304
Project 48-Inch Water Maininstallation from Wagley Robertson Rd.to Parkview Lane
Description
Contractor S.J.Louis Construction of Texas,Ltd. Change Order:= Date: 3l26l2020
City project Mgr. John Kasavich City lnspector Raymond Brice
ADDITIONS
OEP _, : UmE UniE;CosE ToEai
r.
Q ':,.
I
I
i
i
Water
Paving and Drainage
Page 2 of 4 Additions Sub Total
FOP,—r WOR.TH City of Fort Worth
Change Order Deletions
Project Name Northside ft 48-Inch Water Main Phase 11 Part II City Sec No.: 47982
Project No.(s): 56005-0600430-0O2304 DOE No. EKI City Proj.No.: CO2304
Project Description 48-Inch Water Maininstallation from Wagley Robertson Rd.to Parkview Lane
Contractor S.J.Louis Construction of Texas,Ltd. Change Order: ® Date 3/2612020
City Project Mgr. John Kasavich City Inspector: Raymond Brice
DELETIONS
ITEM pESCRIPT(ON; _ . .. DEPT ,_ fY Unif, UnitµCosf i ntal a:
I
i
l
f
l
i
r
Water
Paving and Drainage
Page 3 of 4 Deletions Sub Total
MMSE Breakdown for this Change Order
MWBE 0.180...vice Amourtf for.fhIs CO
Total $0 00
Previous Change Orders
co# DATE MO -AU,'l�T
Total ®QD
i
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Signature
Name of Employee
Title . - 4fj' ;t
ATTEST:
i'YC� au Apr 3,2020
Mary I Kayser
t
City Secretary
t
i
4
ff
eB
pFutlhh
9
a
a
Northside II 48-Inch Water Main Phase 11 Part II
Reason for delays
• The delays on this project were due to the lack of property Easements and No Rail Road Permit.