AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE STORM WATER CAPITAL PROJECTS FUND IN
THE AMOUNT OF $136,171 FROM A STORM WATER UTILITY FUND
TRANSFER, FOR THE PURPOSE OF EXECUTING AN ENGINEERING
AGREEMENT WITH DANNENBAUM ENGINEERING CORPORATION FOR CITY
PROJECT NO. 00474; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING
THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES IN CONFLICT
HEREWITH; AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS:
SECTION 1.
That in addition to those amounts allocated to the various City departments for Fiscal Year 2006-
2007 in the Budget of the City Manager, there shall also be increased estimated receipts and
appropriations in the Storm Water Capital Projects Fund in the amount of $136,171 from a Storm
Water Utility Fund transfer, for the purpose of executing an engineering agreement with
Dannenbaum Engineering Corporation, L.P., for City Project No. 00474.
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid,
inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or
judgment shall in no way impair the remaining portions, sections, or parts of sections of this
ordinance, which said remaining provisions shall be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance No. 17142 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance
are in direct conflict with such other ordinances and appropriations, in which instance said
conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance~hpll take effect upon adoption.
TO
City
ADOPTED AND EFFECTIVE: June 12.2007
City of Fort Worth, Texas
Mayor and Council Communication
COUNCIL ACTION: Approved on 6/12/2007 -Ordinance No. 17603-06-2007
DATE: Tuesday, June 12, 2007
LOG NAME: 30LINDALANE474 REFERENCE NO.: **C-22178
SUBJECT:
Authorize Execution of an Engineering Agreement with Dannenbaum Engineering Corporation, for
Linda Lane Drainage Improvements, Dottie Lynn Parkway Culvert Improvements and Oakridge
Terrace Drainage Improvements (Project No. 00474) and Adopt Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the transfer of $136,171 from the Storm Water Utility Fund to the Storm Water Capital Projects
Fund;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Storm Water Capital Projects Fund in the amount of $136,171; and
3. Authorize the City Manager to execute an engineering agreement with Dannenbaum Engineering
Corporation the amount of $97,138 for Linda Lane Drainage Improvements, Dottie Lynn Parkway Culvert
Improvements and Oakridge Terrace Drainage Improvements.
DISCUSSION:
The Storm Water Management Program was established to reduce flooding in Fort Worth, preserve
streams, minimize water pollution and to operate the storm water system in a more effective manner to fully
comply with state and federal regulatory requirements. This will be accomplished by infrastructure
reconstruction and system maintenance, master planning, enhanced development review, and increased
public education and outreach.
This project addresses drainage improvements in three locations: Linda Lane, Dottie Lynn Parkway and
Oakridge Terrace. At Linda Lane, an unmapped and undersized mid-block storm drain creates
residential flooding. At Oakridge Terrace, residential flooding has been documented along Sahara and
Rickee.
Dannenbaum Engineering Corporation, proposes to prepare plans and specifications for the necessary
drainage improvements at the locations identified above for a lump sum fee of $97,138. City staff considers
this to be fair and reasonable for the scope of services proposed.
In addition to the contract amount, $39,033 is required by the Engineering Department for project
management.
This project is located in COUNCIL DISTRICT 8, Mapsco, 92/A/E.
M/WBE -Dannenbaum Engineering Corporation is in compliance with the City's M/1/VBE Ordinance by
committing to 19 percent M/WBE participation. The City's goal on this project is 19 percent.
Logname: 30LINDALANE474 Page 1 of 2
FISCAL INFORMATION/CERTIFICATION:
The Finance Director certifies that upon approval of the above recommendations and adoption of the
attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of
the Storm Water Capital Projects Fund.
TO Fund/AccountlCenters
1&2)P228 472069 2082800474ZZ
2)P228 531350 208280047410
$136.171.00
6 000.00
8 533.00
3 750.00
$23.584.00
FROM Fund/Account/Centers
1)PE69 538070 0209206
$136.171.00
$23.584.00
$47.168.00
7 861.00
$18.525.00
~P228 531350 208280047420
2)P228 531350 208280047431
2)P228 531200 208280047431
,P228 531350 208280047432
P228 531200 208280047432
2)P228 531350 208280047433
~P228 531200 208280047433
~P228 531200 208280047451
P228 531350 208280047460
2)P228 531350 208280047481
$12.500.00
$47.168.00
6 250.00
7 861.00
$18.525.00
1 000.00
1 000.00
~P228 531200 208280047431
3)P228 531200 208280047432
3)P228 531200 208280047433
~P228 531200 208280047451
Submitted for City Manager's Office bk Marc Ott (8476)
Originating Department Head: Douglas Rademaker (6157)
Additional Information Contact: Dena Johnson (7866)
Logname: 30LINDALANE474 Page 2 of 2