Cr[ySMW RYTH NOTICE OF PROJECT COMPLETION S S D(o�I
DOE.Ne: N/A
R contract 50672 for Walsh Ranch Sani Sewer Extension Phase IV A as required b the Water
��S �Y � e9 y
Department as approved by City Council on 3/27/18 through M&C C-28648 the Director of the Water Department,
upon the recommendation of the Sr.Capital Projects Officer,Capital Projects Delivery,Water Department,has accepted
the project as complete.
Original Contract Prices: $2,824,611.00
Amount of Approved Change Orders: $154,323.54 Ns 3
Revised Contract Amount: $2,978,934.54
i Total Cost Work Completed: $2,749,904.14
Less Deductions:
Liquidated Damages: Days @$630.00/Day
Other Deductions(see comments):
Total Deduction Amount: $0.00
Total Cost Work Completed: $2,749,904.14
Less Previous Payments: $2,569,942.10
Final Payment Due $179,962.04
�r
v
Recommended for Acceptance Date
Assistant Director, Water Department
aYi Grey/51y(e` M a 5 2020
Christopher�r(May 4,2020) Y
Accepted Date
Director, Water Department
� May 5, 2020
Dana
City Manager Date r
CT •R1Ty1 - .
�'
Project Name:Walsh Ranch Sanitaty Sewer Extension,Phase IV A DOE.No:NIA
Comments:
OFFICIAL RECORD
C11-Y SECRETARY
FT..WORTH,TX
HECE IV I✓D
12eCc',p� 2� �I s/ter/2� t�j MAY 0 4 2020
City Project Numbers 100924 S 5--D p-7 2 DOE Number 0007
Contract Name Walsh Ranch Sanitary Sewer Extension,Phase IV A Estimate Number 20
Contract Limits Council District 3 Payment Number 20
Project Type Sewer For Period Ending 3/15/2020
Project Funding
Project Manager Decter City Secretary Contract Number 50672
Inspectors Johnson / Brice Contract Date 3/27/2018
Contractor JACKSON CONSTRUCTION LTD Contract Time 270 CD
5112 SUN VALLEY DRIVE Days Charged to Date 270 CD
FORT WORTH, TX 76119 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
I SL�oL�—�C�G�t2� 2 Z (o11.00 �Ly�1z1��-� �ZLa'v�b�_ 17�2 .oc
Total Cost of Work Completed $2,749,904.14
Less 0 %Retained $0.00
Net Earned $2,749,904.14
Earned This Period $179,962.04
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $2,569,942.10
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $179,962.04
Tuesday,March 24,2020 Page 5 of 5
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name Walsh Ranch Sanitary Sewer Extension,Phase IV A
Contract Limits Council District 3
Project Type Sewer
City Project Numbers 100924
DOE Number 0007
Estimate Number 20 Payment Number 20 For Period Ending 3/15/2020
CD
City Secretary Contract Number 50672 Contract Time 27GD
Contract Date 3/27/2018 Days Charged to Date 270
Project Manager Deeter Contract is 92.000 Complete
Contractor JACKSON CONSTRUCTION LTD
5112 SUN VALLEY DRIVE
FORT WORTH, TX 76119
Inspectors Johnson / Brice
Tuesday,March 24,2020 Pa-e 1 of 5
City Project Numbers 100924 DOE Number 0007
Contract Name Walsh Ranch Sanitary Sewer Extension,Phase IV A Estimate Number 20
Contract Limits Council District 3 Payment Number 20
Project Type Sewer For Period Ending 3/15/2020
Project Funding
Sewer
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
LA 3331.4405 30"DIP Sewer 5311 LF
LB 3331.4408 30"Fiberglass Sewer Pipe 5311 LF
LC 3331.4411 30"PVC ASTM F1803 Sewer 5311 LF
LD 9999.0006 30"Solid Wall PVC PS 46 A(CO#1) 0 LF $151.00 $0.00 0 $0.00
2.A 3331.4321 24"DIP Sewer 1583 LF
2.13 3331.4324 24"Fiberglass Sewer Pipe 1583 LF
2.13 3331.4317 24"PVC 1583 LF
3 3305.1108 48"Casing By Other Than(CO#2) 450 LF $574.00 $258,300.00 450 $258,300.00
5 3331.4321 24"DIP Sewer(At Aerial 177 LF $454.00 $80,358.00 177 $80,358.00
6 3331.4225 18"Sewer Pipe 20 LF $256.00 $5,120.00 20 $5,120.00
7 3331.4115 8"Sewer Pipe 20 LF $208.00 $4,160.00 40 $8,320.00
8 3339.1101 5'Manhole 23 EA $11,426.00 $262,798.00 23 $262,798.00
9 3339.1103 5'Extra Depth Manhole 256 VF $219.00 $56,064.00 269.88 $59,103.72
10 3305.0103 Exploratory Excavation of 3 EA $1,500.00 $4,500.00 3 $4,500.00
11 3305.0109 Trench Safety 7111 LF $1.00 $7,111.00 8145 $8,145.00
12 3305.0110 Utility Marker 16 EA $150.00 $2,400.00 13 $1,950.00
13 3305.0112 Concrete Collar 23 EA $695.00 $15,985.00 23 $15,985.00
14 3305.0113 Trench Water Stops 9 EA $205.00 $1,845.00 9 $1,845.00
15 3339.0001 Epoxy Manhole Liner(Warr 394 VF $196.00 $77,224.00 407.88 $79,944.48
16 3301.0001 Pre-CCTV Inspection 321 LF $5.00 $1,605.00 321 $1,605.00
17 3301.0002 Post-CCTV Inspection 7931 LF $2.00 $15,862.00 7931 $15,862.00
18 3301.0101 Manhole Vacuum Testing 23 EA $390.00 $8,970.00 23 $8,970.00
19 0330.0001 Concrete Encase 24"Sewer 90 LF $171.00 $15,390.00 90 $15,390.00
20 0241,2001 Sanitary Line Grouting 5 CY $292.00 $1,460.00 5 $1,460.00
21 0241.2103 8"Sewer Abandonment Plug 6 EA $134.00 $804.00 6 $804.00
22 0241.2201 Remove 4'Sewer Manhole(CO#2) 0 EA $775.00 $0.00
23 0241.5001 Abandon Manhole 2 EA $1,662.00 $3,324.00 2 $3,324.00
24 3137.0102 Large Stone Riprap,dry 400 SY $77.00 $30,800.00 400 $30,800.00
25 3201.0614 Cone Pvmt Repair,Residen 34 SY $149.00 $5,066.00 42 $6,258.00
26 3211.0122 6"Flex Base,Type A,GR- 409 SY $22.00 $8,998.00 409 $8,998.00
27 3212.0302 2"Asphalt Pvmt Type D(CO#3) 1.1 SY $35.00 $38.50
Tuesday,March 24,2020 Page 2 of 5
City Project Numbers 100924 DOE Number 0007
Contract Name Walsh Ranch Sanitary Sewer Extension,Phase IV A Estimate Number 20
Contract Limits Council District 3 Payment Number 20
Project Type Sewer For Period Ending 3/15/2020
Project Funding
28 3212.0501 4"Asphalt Base Type B(CO#3) 0 SY $70.00 $0.00
29 3212.0304 4"Asphalt Pvmt Type D(f(CO#3) 35.9 SY $70.00 $2,513.00
30 3216.0102 7"Cone Curb and Gutter( 15 LF $82.00 $1,230.00 15 $1,230.00
31 3292.0100 Block Sod Placement 7286 SY $5.00 $36,430.00
32 3292.0400 Seeding Hydromulch 41803 SY $2.00 $83,606.00 46644.05 $93,288.10
33 3471.0001 Traffic Control 9 MO $1,200.00 $10,800.00 9 $10,800.00
34 3125.0101 SWPPP >1 acre 1 LS $26,950.00 $26,950.00 1 $26,950.00
35 3110.0102 6"-12"Tree Removal 92 EA $561.00 $51,612.00 92 $51,612.00
36 3110.0103 12"-18"Tree Removal 46 EA $842.00 $38,732.00 46 $38,732.00
37 3110.0104 18"-24" Tree Removal 29 EA $1,122.00 $32,538.00 29 $32,538.00
38 3110.0105 24"and Larger Tree Remov 25 EA $1,684.00 $42,100.00 30 $50,520.00
39 9999.0000 30"Dia.Concrete Piers f 3 EA $16,000.00 $48,000.00 3 $48,000.00
40 9999.0001 Sanitary Sewer Manhole Ve 8 EA $5,800.00 $46,400.00 8 $46,400.00
41 9999.0002 Cramer Building Relocatio 1 LS $4,900.00 $4,900.00 1 $4,900.00
42 9999.0003 Construction Allowance 1 LS $150,000.00 $150,000.00
43 9999.0004 Construction Surveying(R 1 LS $4,000.00 $4,000.00 1 $4,000.00
44 9999.0005 Construction Staking 1 LS $20,000.00 $20,000.00 1 $20,000.00
C45 30"Solid Wall PVC Sewer Pipe(CO#1) 5311 LF $177.97 $945,198.67 5551 $987,911.47
C46 24"Solid Wall PVC Sewer Pipe(CO#1) 1583 LF $137.98 $218,422.34 1583 $218,422.34
C47 30"Solid Wall PVC Carrier Pipe(CO#1) 820 LF $165.00 $135,300.00 820 $135,300.00
C48 48"Casing By Open Cut(CO#2) 370 LF $469.00 $173,530.00 130 $60,970.00
C49 21"Sanitary Sewer Pipe(CO#2) 21 LF $381.00 $8,001.00 21 $8,001.00
C50 Adhesion and Spark Testing of MHs(CO#3) 407.88 VF $74.75 $30,489.03 407.88 $30,489.03
Sub-Total of Previous Unit $2,978,934.54 $2,749,904.14
Tuesday,March 24,2020 Page 3 of 5
City Project Numbers 100924 DOE Number 0007
Contract Name Walsh Ranch Sanitary Sewer Extension,Phase IV A Estimate Number 20
Contract Limits COtmeil District 3 Payment Number 20
Project Type SetVer For Period Ending 3/15/2020
Project Funding
Contract Information Summary
Original Contract Amount $2,824,611.00
Chanee Orders
Change Order Number l $185,947.01
Change Order Number 2 ($31,624.00)
Change Order Number 3 $0.53
Total Contract Price $2,978,934.54
Z�k
ate Total Cost of Work Completed $2349,904.14
Con ractor Less 0 %Retained $0.00
Net Earned S2,749,904.1 4
Inspection Supervisor Earned This Period $179,962.04
, Retainage This Period $0.00
Date Less Liquidated Damages
Project Manager
Days @ /Day $0.00
AJIA Date LessPavement Deficiency $0.00
Asst.Director/TPW Less Penalty $0.00
Qbb%kW2- Less Previous Payment $2.569,942.10
e,H rder(May4,i0Z0) Date
Director/Contracting Department Plus Material on Hand Less 15% $0.00
Balance Due This Payment $179,962.04
Tuesday,March 24,2020 Page 4 of 5
FORTWORTH rev 03
WATER ENGINEERING & FISCAL SERVICES
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:20
NAME OF PROJECT: Walsh Ranch Sanitary Sewer Extension.Phase 4A
PROJECT NO.: 100924 CONTRACTOR: Jackson
DOE NO.:
PERIOD FROM 03/01/20 TO: 03/15/20 FINAL INSPECTION DATE: 12/2/2020
WORK ORDER EFFECTIVE:7/23/2018 CONTRACT TIME: 270 O WD 0 CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYSREASON FOR DAYS
MONTH CHARGED CREDITED MONTH LDURING]ARGE CREDITED
DURING
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
8. 23.
9. 24.
10. 25•
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES OTHERS` DAYS TOTAL
& HOLIDAYS &TOO COLD RELOCATIONS CHARGED DAYS
THIS 0 0
PERIOD
PREVIOUS 270 ,70
PERIOD
TOTALS 270 270
TO DATE
'REMARKS:
1
NT ACTOR ATE INSPECTOR DATE
WATER ENGINEERING&FISCAL SERVICES
T1ie City of Fort Worth• 1000 Throckmorton Street• ['ort\C'ortlt,-I-_- 6012-637 7
(817')392-4477, •Fqx: (817)3q2-8460
FORT WORTH
WATER ENGINEERING & FISCAL SERVICES
PIPE REPORT FOR:
PROJECT NAME: Walsh Ranch Sanitary Sewer Extension,Phase IV-A
PROJECT NUMBER: 100924
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
FIRE HYDRANTS: VALVES(16" OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES:
NEW SERVICES:
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
30" PVC 6131
24" PVC 1583
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Every 200 LF
NEW SERVICES:
WATER ENGINEERING&FISCAL SERVICES
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-4477 •Fat:(817) 392-8460
FORTWORTHREV:02/20/07
WATER ENGINEERING& FISCAL SERVICES
PERFORMANCE EVALUATION OF CONTRACTOR
n CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Jackson Construction Walsh Ranch Sanitary Sewer Extension,Phase 4A
Water Engineering Inspector DOE Number
Raymond H.Brice CPN#100924
Water Engineering Inspector Project Manager
❑ water 0 Waste water ❑ Storm Drainage ❑ Pavement Liam Conlon
Initial Contract Amount Project Difficulty
$2,824,611.00 Q Simple O Routine Complex
Final Contract Amount Date
$3,010,558.01 10/15/2019
II)PERFORMANCE EVALUATION
0-Inadequate 1-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 3 8 6
2 Public Notifications 5 Y 4 20 20
3 Plans on Site 5 Y 4 20 20
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 4 20 20
10 Citizen's Complaint Resolution 5 Y 4 20 20
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 4 20 20
13 Project Completion 5 Y 3 20 15
TOTAL ELEMENT SCORE(A) 376
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 376
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating(ITS/MS] * 100%) 376 / 448 = 84%
Performance Category Excellent
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Signature Inspector Signature Contractor
Signature Inspector's Supervisor
CONTRACTOR'S COMMENTS
WATER ENGINEERING&FISCAL SERVICES
The City of Fort Worth•1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477•Fax: (817)392-8460
FORTWORTHREV:02/22/07
WATER ENGINEERING AND FISCAL SERVICES
CONTRACTOR'S EVALUATION OF CITY
I)PROJECT INFORMATION Date:
Name of Contractor Project Name
Jackson Construction Walsh Ranch Sanitary Sewer Extension,Phase 4A
Water Engineering Inspector Project Manager
Raymond H.Brice Liam Conlon
DOE Number Project Difficulty Type of Contract
CPN#100924 0 Simple Q Routine * Complex ❑water 2 waste water ❑Storm Drainage ❑ Pavement
Initial Contract Amount Final Contract Amount
$2,824,611.00 $3,010,558.01
In PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3 -Good 4-Excellent
ELEMENT RATING JELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS&SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity&Sufficiency of Details
3 Accuracy of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of Utility Conflicts
3 Bid Opening to Pre-Con Meeting Timeframe
III)COMMENTS&SIGNATURES
COMMENTS
Signature Contractor
Signature Inspector o=d` AA r�"r/1 /jarvi:
Signature Inspector's Supervisor
INSPECTOR'S COMMENTS
Water Engneering and Fiscal Services
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817)392-4477 •Fax: (817)392-8460
Y: ..I..: ,. ... C,a, ®id
CONSTRUCTfON LTD.
5112 SUN VALLEY DRIVE
FORT WORTH,TX 76119
TEL.,817-572-3303
FAX:817-478-0443
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Troy L. Jackson,
President Of Jackson Construction, Ltd, known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Walsh Ranch Sanitary Sewer Extension,Phase IVA
BY
Troy . Jackson, President
Subscribed and sworn before me on this date 2nd of October,2019.
Notary ublic
Tarrant, Texas
o'""'•,, CARMEN L.ESTEP
Notary Public.State of Texas
�,; •'�z Comm.Expires 04-06-2020
Notary ID 2910611
jVop, WO 'r>j Citiy ®f Forrt @oath est
CITYSECRETARY
-= - "'r crrvo. �00 -CGS_
tea'
`Protect Name: Walsh Ranch Sanitary Sewer Extension Phase IVA City Sec No.: 50672
Project No.(s): 56002/07004301/100924/001780 DOE No. N/A City Proj.No.: 100924
Project Description: 30-Inch Sanitary Sewer Main beginning at Lost Creek Blvd northwesterly 5350 feet.
Contractor: Jackson Construction,Ltd. Change Order# F-73—] Date: 2/10/2020
City Project Mgr. Liam Conlon City Inspector: I Raymond Brice
Phone Number: 817-392-6824 Phone Number: 817-392-8452
Dept. Sewer Totals Contract Time
(Calender days)
Original Contract Amount $2,824,611.00 $2,824,611.00 270
Extras to Date $185,947.01 $185,947.01
Credits to Date $31,624.00 $31,624.00
Pending Change Orders(in M&C Process)
Contract Cost to Date $2,978,934.01 $2,978,934.01 270
Amount of Proposed Change Order $0.53 $0.53
Revised Contract Amount $2,978,934.54 $2,978,934.54 270
Original Funds Available for Change Orders $84,738.00 $84,738.00
Remaining Funds Available for this CO
Additional Funding(if necessary)
CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 5.46%
MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $3,530,763.75
JUSTIFICATION(REASONS)FOR CHANGE ORDER
The change order will provide compensation for adhesion and spark testing for epoxy manhole liner that was
required by City staff in accordance with current City specifications that were not in existence at the time this
project was advertised for bid.
AUe
�ea
yA Ci Secretary
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full(both time and money)for all costs arising out of,or incidental to,the above Change Order
Contractor's Company Name Contractor Name Con ctor§Ignature 4 Ya!eZ
JackspAi Construction, Ltd. Steve Haberstroh ',, t,� � 7/ o L
Inspector Date Pro"e wager Dat
1- PC r,44.1 0.1-i /1 20
Director(Water t) Date struction Supervisor(Water Dept) Date
Assi qt C' Date Assistgpt City PAELnager Date
Council Action(If Required) I U
M&C Number N/A M&C Date Approved N/A
City of Fort Worth
-L>`— Change Order Additions
Project Name Walsh Ranch Sanitary Sewer Extension Phase IVA City Sec No.: 50672
Project No.(s): 56002/070043011100924/001780 DOE No. N/A City Proj.No.: 100924
Project
Description 30 Inch Sanitary Sewer Main beginning at Lost Creek Blvd northwesterly 5350 feet.
Contractor Jackson Construction,Ltd. Change Order:= Date: 2/10/2020
City Project Mgr. Liam Conlon City Inspector Raymond Brice
ADDITIONS
fi 1SCl2 DEPT Qty JUnit I Unit Cost Total
C50 JAdhesion and Spark Testing Sewer 407.88 1 VF $74.75 $30,489.03
Sewer $30,489.03
Page 2 of 4 Additions Sub Total $30,489.03
L°Va),E?--F P,'TI-i City of Fort Worth
��--�1�--- Change Order Deletions
l y
ll_
Project Name Walsh Ranch Sanitary Sewer Extension Phase IVA City Sec No.: 50672
Project No.(s): 56002/07004301/100924/001780 DOE No. N/A City Proj.No.: 100924
Project Description 30 Inch Sanitary Sewer Main beginning at Lost Creek Blvd northwesterly 5350 feet.
Contractor Jackson Construction,Ltd. Change Order: F3 I Date 2/10/2020
City Project Mgr. Liam Conlon City Inspector: Raymond Brice
DELETIONS
ITEM IDESCRIPTION DEPT Qty Unit Unit Cost Total
>21R 2"Asphalt PVMT Type D Sewer 274.90 SY $35.00 $9,621.50
YW 4"Asphalt Base Sewer 276.00 SY $70.00 $19,320.00
-TV 4"Asphalt PVMT Type D Sewer 22.10 SY $70.00 $1,547.00
Sewer $30,488.50
Page 3 of 4 Deletions Sub Total 1$30,488.50
MMBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Name of Employee
Qro R-U+
Title
CONSENT OF SURETY OWNER ,
TO FINAL PAYMENT ARMTECT D
ALA Document G707 CONTRACTOR D
SURETY
Bond No. BCD1068029 OTHER D
TO OWNER ARC}iITECrS PROJECT NO.:
(.Name eard addrm)
City of Fort Worth, TX
CONTRACT FOR: Sanitary Sewer Extension
Fort Worth TX
PROJBCT: CON TACT DATEI?:
(Naime and addna�
Walsh Ranch, Phase IVA, City Project No. 100924
In accordance with the provisions of the Contract between the Owner and the Umtractor as indicated at'Ove,the
(lrrsert namea»d address ofSart'rj)
The Hanover Insurance Company
440 Lincoln Street
Worcester MA 01653
SURETY,
on bond of
{lrrsen name and add>rss ofCenlraaar)
Jackson Construction, Ltd.
5112 Sun Valley Drive
Fort Worth TX 76119
COMRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shalt not relieve the Surety of
any of its obligations to
(t)Wrt Hauteandaddrev oj'or4mer)
City of Fort Worth,TX
Fort Worth TX
OWNER,
as Set fbrEb in said Surety S bond-
IN VIMNESS WHEREOF,the Surety has hereunto set its hand can this date: October 2, 2019
(hurat rn u4itir�@ for rmauatbfcJlox�T b t the maneric darrand jcar.T
The Hanover Insurance Company
{$tmty)
By: 2
�^ „ f !�Y'raturr arrrLorYzcxt rrprrxrntatira)
At[Ctit: !/ �
{Sear:
Jack M. Crowley Attorney-in-Fact
(Pr fi»cx.+r rarr:a atttJ t Yfr)
Surety Phone No. 508-853-7200 x-4476
G707--1994
THE HANOVER INSURANCE COMPANY
MASSACHUSETTS BAY INSURANCE COMPANY
CITIZENS INSURANCE COMPANY OF AMERICA
POWER OF ATTORNEY
THIS Power of Attorney limits the acts of those named herein,and they have no authority to bind the Company except in the manner and to
the extent herein stated.
KNOW ALL PERSONS BY THESE PRESENTS:
That THE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY,both being corporations organized and existing
under the laws of the State of New Hampshire,and CITIZENS INSURANCE COMPANY OF AMERICA,a corporation organized and existing under the laws
of the State of Michigan,(hereinafter individually and collectively the"Company")does hereby constitute and appoint,
Steven R.Foster,Jack M.Crowley,Sonia Lara and Teuta Luri
Of Willis of Texas,Inc.of Dallas,TX each individually,if there be more than one named,as its true and lawful attomey(s)-in-fact to sign,execute,seal,
acknowledge and deliver for,and on its behalf,and as its act and deed any place within the United States,any and all surety bonds, recognizances,
undertakings,or other surety obligations.The execution of such surety bonds,recognizances,undertakings or surety obligations,in pursuance of these
presents,shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretaryofthe Company,in theirown
proper persons.Provided however,that this power of attorney limits the acts of those named herein;and they have no authority to bind the Company except
in the manner stated and to the extent of any limitation stated below:
Any such obligations in the United States,not to exceed Thirty Five Million and No/100($35,000,000)in any single instance
That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company,and said
Resolutions remain in full force and effect:
RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and
empowered to appoint Attorneys-in-fact of the Company,in its name and as it acts,to execute.ar+d-acknow(edge for and on its behalf as surety,
any and all bonds,recognizances,contracts of indemnity,waivers of citation and.iU-other Writings obligatory in the nature thereof,with powerto
attach thereto the seal of the Company.Any such writing-so executed by such Attorneys-in-fact shall be binding upon the Company as if they
had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons.
RESOLVED:That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto,granted
and executed by the President or Vice President in conjunction with any Vice President of the Company,shall be binding on the Company to the
same extent as if all signatures therein were manually affixed,even though one or more of any such signatures thereon may be facsimile.
(Adopted October 7,1981—The Hanover Insurance Company;Adopted April 14, 1982—Massachusetts Bay Insurance Company;Adopted
September 7,2001—Citizens Insurance Company of America)
I
IN WITNESS WHEREOF,THE HANOVER INSURANCE COMPANY,MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE
COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals,duly attested by two Vice Presidents,this 10th
day of April,2019.-
The Hanauer X�urance Company The Ha never Insurance Com n
Massachusetts Bay InsQ ance Company Pa y
Citiu ns Insurance Company of America 14assachusetts B.ay Insurance Compnvay
C"rt¢cns Insurance Company of llrncraca
Aa
John C_Roche,ENT and President JamesH.Yi wiec1.3, Mice President
THE COMMONWEALTH OF MASSACHUSETTS )
COUNTY OF WORCESTER )Ss.
On this 101h day of April,2019 before me came the above named Vice Presidents of The Hanover Insurance Company,Massachusetts Bay Insurance
Company and Citizens Insurance Company of America,tome personally known to be the individuals and officers described herein,and acknowledged that
the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company,Massachusetts Bay Insurance Company and
Citizens Insurance Company of America,respectively,and that the said corporate seals and their signatures as officers were duly affixed and subscribed to
said instrument by the authority and direction of said Coporations.
o NE J. YAMN0
Nanny PnElfe
pow y WAC
F� Di—J. a �,N'm—�Pohl;,
wV 4.7� 3 M.Ca.mm:ssiun ExPi-- M—ch_,202_
I,the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of
America,hereby certify that the above and foregoing is a full,true and correct copy of the Original Power of Attorney issued by said Companies,and do
hereby further certify that the said Powers of Attorney are still in force and effect.
GIVEN under my hand and the seals of said Companies,at Worcester,Massachusetts,this 2ndday of October 2019
CERTIFIED COPY t
T wdort G.Maam¢z.1,ioc Pra�id.ar
I
I \ 66
07 Universal 6112e
{1 ACE PIPE CLEANING r2'616 c.11-26c E.,�0
A Carylon Company (816)2,505.
more;ac=_pipe.com.
8/1/2019
TO: Nicole McCollum
Jackson Construction
5112 Sun Valley Drive
Fort Worth,TX 76119
Email: nicolem o jacksontx.net
SUBJECT: Change Order Request#1
REFERENCE: Walsh Ranch
City of Fort Worth
Dear Nicole,
Ace Pipe Cleaning(APC)respectfully requests a change for adhesion and spark testing if required
by City of Fort Worth inspectors.
Description Total
Adhesion or Sparlc Testing per COFW Requirements $65.00 per VF
Thank you for your consideration.
46 5 A.r- + 1s XO br Pt D = 7 4.7 S /V F f S.. zha fi o
Plcase contact us with any questions, concerns or comments.
Respectfully,
Theresa Calvert
Vice President 0
Ace Pipe Cleaning, Inc. M l'b ��
FORT WORTH
April 15,2020
Jackson Construction LTD
5112 Sin Valley Dr.
Fort Worth,TX 76119
Re:Acceptance Letter
Project Name: Walsh Ranch Sanitary Sewer Extension,Phase IV A
Project Type: Sewer
Project Ns: 100924
DOE. Ns: N/A
Contract Ns: 50672 Dated: 3/27/2018
Gentleman:
On December 02,2019 a final inspection was made on the subject project. There were punch list items
identified at the time. The punch list items were completed on December 09,2019. The final inspection and the
corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore
accepted by the City. The warranty period will start on December 09,2019,which is the date of punch list
completion and will extend for (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance,please feel free to contact me at (817) 392-6054
Yours Truly,
Tony Sholola,P.E.,Assistant Director,Water Department
TS /
cc: Chris Harder,P.E.,Director,Water Department
Laura Wilson,P.E.,Deputy Director,Water Department
Captain Michael Strains,Fire Department
Bill Lundval,Sanitary Sewer Systems Superintendent,Water Department
Cesar Zavala, Water Systems Superintendent,Water Department
Liam Conlon,Project Manager
David R Johnson,Supervisor, Capital Projects Delivery,Water Department
Raymond Brice,Inspector, Capital Projects Delivery,Water Department
Ty Hilton,P.E.,Teauge Nall&Perkins,Consultant
Jackson Construction LTD, Contractor
File
WATER DEPARTMENT
ENGINEERING AND FISCAL SERVICES
THE CITY OF FORT WORTH * 1000 THROCKMORTON STREET * FORT WORTH, TExAs 76102
817-392-8240 * FAx 817-392-8195
c1 Printed on recycled paper