Loading...
HomeMy WebLinkAboutContract 38537-A2 AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. JgLS I-I -A�. (M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Carollo Egineers, Inc. , (Engineer) made and entered into City Secretary Contract No. 38537, (the Contract) which was authorized by the City Council by M&C C-23490 on the 28th day of April, 2009; and WHEREAS, the Contract involves engineering services for the following project: Village Creek Wastewater Treatment Plant Secondary Area and Filter Rehabilitation and Modifications, Project No. P275-70130 0128980 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in M&C C-24530,adopted by the City Council on the 12 day of October 2010 and further amplified in a proposal letter dated July 13, 2010, copies of which are attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $ 350,000. 00 . 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not City of Fort Worth,Texas Amendment to Engineering Agreement PMO Official Release Date:6.18.2010 Page 1 of 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX exceed the sum of $ 1,392,000 . 00. 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 13th day of October, 2010, in Fort Worth, Tarrant County, Texas. ATTEQ� U rr U Y, �ar y Hendrix �g City Secretary 01 ® o F �? �000000C1G7Ux? APPROVAL RECOMMENDED: PROVED: V , S . Frank Crumb, P.E. D" rector, Fernando Costa Water Department Assistant City Manager Carollo Engineers, Inc. ENGINEER By: Name: Ma C1 urn, P.E. Partne 1478 Preston Road, Suite 950 - rj Dallas, Texas 75254 'aot Authorixatioa /0I ia.l ,� Date APPROVED AS TO FORM AND LEGALITY: kl& Assistant Ci y Attorney City of Fort Worth,Texas Amendment to Engineering Agreement OFFICIAL RECORD PMO Official Release Date:6.18.2010 Page 2 of 2 CITY SECRETARY FT. WORTH, TX Ca#rAgw//AM Engineers...Working Wonders With Water" July 13, 2010 Forth Worth Water Department 1000 Throckmorton Street Fort Worth, Texas 76102 Attention: Ms. Farida S. Goderya, PH.D, P.E. Project Manager Subject: Amendment No. 2 Village Creek Wastewater Treatment Plant Secondary Area and Filter Rehabilitation and Modifications Engineering Services During Construction Dear Farida: Attached is the scope of work and fee associated with the engineering efforts for Amendment No. 2 to the Village Creek Wastewater Treatment Plant Secondary Area and Filter Rehabilitation and Modifications project. Amendment No. 2 is for providing engineering services during construction for the above mentioned project. The detailed scope of services for Amendment No. 2 is described in "Attachment A-1". The fee justification and proposed M/WBE goal is summarized in "Attachment A-2". The proposed fee for Amendment No. 2 is $ 350,000. The proposed M/WBE goal for Amendment No. 2 is 21%. We will achieve this goal by utilizing Gupta and Associates, Inc. (GAI)for electrical and instrumentation and Jaster-Quintanilla (JQ)for structural work. Attachment A-3 outlines scope items that are beyond the scope of work or are considered additional services. Let us know if you have any questions or comments or would like to discuss any item in further detail. On behalf of Carollo Engineers, Inc. and the project team, I would like to thank you for this great opportunity and look forward to a successful completion of this project. Sincerely, CAROLLO ENGINEERS, INC. Hlsham I. (Hutch) Masallam, P.E. Project Manager HM:sw Signature Place II, 14785 Preston Road, Suite 950, Dallas,TX 75254 P.972.239.9949 F.972.239.9117 pw://Carollo/Documents/Client/TX/Fort Worth/8258A10/Correspondence/Fort Worth/FGoderya Ur 071310.docx(A) Carollo.com ATTACHMENT A-1 SCOPE OF SERVICES AMENDMENT NO.2 VILLAGE CREEK WASTEWATER TREATMENT PLANT SECONDARY AREA AND FILTER REHABILITATION AND MODIFICATIONS ENGINEERING SERVICES DURING CONSTRUCTION The scope of work presented herein represents the Office Services portion of the Engineering services During Construction for the Village Creek Wastewater Treatment Plant Secondary Area and Filter Rehabilitation and Modifications Project. ENGINEER will support the construction phase for office services. Field services and on site representation will be provided by qualified CITY designated personnel. The required level of engineering services is highly dependent on the experience and quality of the CONTRACTOR and experience of the CITY's Resident Project Representatives. CITY and ENGINEER will review the job progress on a quarterly basis in accordance with the construction schedule, to verify the assumed effort required to complete job tasks as defined in the Scope of Services. ENGINEER will endeavor to protect CITY in providing these services however, it is understood that ENGINEER does not guarantee the CONTRACTOR's performance, nor is ENGINEER responsible for supervision of the CONTRACTOR's operation and employees. ENGINEER is not responsible for the means, methods, techniques, sequences, or procedures of construction selected by the CONTRACTOR, or any safety precautions and programs relating in any way to the condition of the premises, the work of the CONTRACTOR or any SUBCONTRACTOR. ENGINEER is not responsible for the acts or omissions of any person (except its own employees or agents) at the project site or otherwise performing any of the work of the Project. Task 500 —General Administration Subtask 510— Project Administration & Coordination ENGINEER will furnish general administrative services to remain current on the project status and to provide organized execution of work and retrieval of information. ENGINEER will coordinate work of subconsultants and communicate with CITY staff. ENGINEER will provide the necessary MWBE submittal and progress report required by CITY. ENGINEER will provide CITY with monthly progress reports on services performed. Monthly progress reports will include information such as cumulative percentage of the overall budget expended, a brief description of work performed during the reporting period, and such other information as may be appropriate. Subtask 520--Filing Maintenance ENGINEER will maintain electronic filing system using CITY's BUZZSAW for the duration of the project assumed at 15 months. pw://Carollo/Documents/ClientITYJFort Worth/8258AlO/Project Management(Contracts/Amendment 2 attachment.docx(A) Subtask 530—Pre-Construction Conference ENGINEER will conduct a pre-construction conference to establish communication procedures between the CITY, CONTRACTOR, and ENGINEER; to review schedule, submittal requirements, shut-down and operational constraints; and other construction issues. Task 600 — Engineering Services during Construction The ENGINEER will provide engineering services during construction as described below. Services in excess to what is described below are considered additional services. Services are based on a construction time not exceeding 15 months in accordance with the construction contract documents. Subtask 610—Monthly Progress Meetings and Site Visits ENGINEER will visit the project site on a monthly basis and attend monthly progress meetings. Engineer will also conduct a site visit at the day of the monthly progress meeting. The purpose of the monthly visits is to consult with OWNER the CONTRACTOR regarding project issues. This task allows for total of up to fifteen (15) visits, with an average of four (4) hours per person per visit at the job site and one person per visit. Subtask 620— Weekly Coordination ENGINEER will participate in weekly conference calls with CITY, CONTRACTOR, and CITY's Resident Inspector. The intent of these conference calls is communicate with CITY's Resident Inspector the intent of contract documents, discuss design details, stay current on project progress, and assist in resolving situations that may arise during the construction. Subtask 630—Additional Site Visits The ENGINEER will conduct additional site visits to observe certain construction tasks, review or verify field conditions, assist in start-up procedures as needed or requested by CITY for a total of fifteen (15) visits through out the construction period as follows. A. Structural. Up to two (2) visits. B. Process Mechanical & Piping. Up to nine (9) visits. C. Electrical/ I&C. Up to four(4)visits. Subtask 640— Submittals ENGINEER will review technical Shop Drawings, Record Data, Operation and Maintenance Manuals, and other submittals for conformance with the intent of the Contract Documents. This task assumes a maximum of two hundred (200) submittals and re-submittals. Additional submittals or excessive reviews will be considered as additional service. ENGINEER will track the budget expended for submittal review beyond (2) two re-submittal for reimbursement by CONTRACTOR through CITY. Submittals will generally be reviewed and returned within the timeframe allotted per the Construction Documents. pw://Carollo/Documents/ClienYMFort Worth/8258AIO/Project ManagemenYContracts/Amendment 2 attachment.docx(A) Subtask 650—Responses to Requests for Information CONTRACTORS issue Requests for Information (RFIs) periodically during the course of a construction project to clarify details associated with the design project. The ENGINEER will prepare responses to substantive RFIs. It is assumed that up to forty (40) RFI responses will be prepared throughout the duration of the project. Subtask 660— Change Orders Review and provide the CITY with recommendations on CONTRACTOR'S CHANGE ORDER (CO) requests. A total of two (2) change orders are assumed for this task. Change orders that are assumed for this task are for elements that do not require additional design or extensive engineering effort. Subtask 670—Project Closeout ENGINEER will assist in project completion activities at the conclusion of the construction. Including observation of completed construction for general conformance with the design concept and preparation of a list of deficiencies to be corrected by the CONTRACTOR before final payment can be recommended. Services include preparing a preliminary list of deficiencies; a follow-up review of project after the punch list has been completed by the CONTRACTOR, and a final walk through with the CITY staff. Subtask 680—Record Drawings Using information obtained from CONTRACTOR's record drawings and the field set of contract documents maintained by CITY, ENGINEER will revise the Contract Documents at the end of the project to record drawing status. The drawings will be issued in draft form for review and comment by the CITY. A final set will be prepared based on comments received. It is assumed that CONTRACTOR will provide a detailed set of drawings showing changes made throughout the construction. Deliverables: Five (5) reduced size (11" x 17") bond sets of record drawings will be submitted to the CITY along with a CD of the electronic drawings (AutoCAD v. 2006 and pdf format). pw://Carollo/Documents/Client/TX/Fort Worth/8258A10/Project Management/Contracts/Amendment 2 attachment.doa(A) ATTACHMENT A-2 AMENDMENT NO. 2 - FEE JUSTIFICATION Village Creek WWTP - Secondary Area & Filter Rehab & Modifications Project Engineering Services During Construction - Office Services Engineers...Working Wonders With Water_ Subtotal Subtotal Project Project Assistant Carollo Carollo PECE Jo GAI Printing Mark-up on Category Manager Professional Professional Technician Admin Carollo Hours Carollo Labor LABOR & EXPENSES M/WBE* M/WBE* Sub Subs TOTAL Averagare Rate $65 $50 $40 $40 $30 Total Hours 178 566 538 132 234 1648 Task 500 GENERAL ADMINISTRATION &COORDINATION 128 50 10 0 130 318 $49,150 $3,900 $400 $0 $0 $40 $53,490 510 Project Administration&Coordination 2.5 hours per week 120 24 0 0 20 164 $ 31,200 520 Document Maintenance 2 hours per week 10 10 110 130 $ 13,650 530 Pre-Construction Conference(Includes Prep and Meeting Minutes) 8 16 0 0 0 24 $ 4,290 600 ENGINEERING SERVICES DURING CONSTRUCTION 50 516 528 132 104 1330 $190,400 $20,000 $18,300 $55,000 $5,000 $7,800 $296,500 610 Monthly Progress Meetings 1person/meeting up to 15 months 120 0 0 120 $ 19,500 $750 $6,000 620 General Coordination With Cit 's Inspector Average 2 hours/week 10 60 60 0 0 130 $ 19,663 630 Additional Site Visits&Specialty Inspection 10 80 0 80 $ 13,000 1 $750 $3,300 640 Submittal, Includes Re-Submittals(Shop Drawings, O&M, Pay Est 175 30 175 350 0 88 643 $ 88,855 1 1 $11,000 $33,600 650 RFIs u to 25 0 25 50 0 75 $ 10,563 1 1 $1,300 $3,000 660 Change Orders Within Scope of Work 2 Total 2 12 16 12 8 50 $ 6,793 $1,000 $1,900 670 Project Closeout 8 32 40 80 $ 12,090 $1,500 $1,500 680 Record Drawings 0 12 12 120 1 8 152 $ 19,890 $2,000 $5,700 $5,000 700 O&M MANUAL(NOT INCLUDED) Total Hours Carollo TOTAL FEE $239,550 $23,900 $18,700 $55,000 $5,000 $7,840 $350,000 15 Multiplier=3.25 Proposed M/WBE Goal 21% Rev 3-July 9, 2010 ATTACHMENT A-3 ADDITIONAL SERVICES AMENDMENT NO.2 Additional services not included in the scope of work are listed below: A. Materials testing for confirmation of Contractor's materials preparing applications and supporting documents for government grants, loans, planning advances, and providing data for detailed applications. B. Modification to the project elements resulting in additional design work. C. Preparing or reviewing Environmental, Archeological Surveys, Impact Assessments or Statements, Hazardous Materials Management Plan and Section of the Clean Water Act 404 permit applications. D. Resident Representation for Project. E. Warranty Inspection for Project. F. Submittal reviews in excess to the number stipulated in the scope of work. G. (Request for Information) RFI responses in excess to the number stipulated in the scope of work. H. Change orders in excess of the number stipulated in the scope of work. I. Facility Operations and Maintenance Manual (different from equipment Operations and Maintenance Manual submittals). J. Appearing before regulatory agencies or courts as an expert witness in any litigation with third parties or condemnation proceedings arising from the development or construction of the Project, including the preparation of data and reports for assistance to the City. K. Investigations involving detailed consideration of operation, maintenance, and overhead expenses, and the preparation of rate schedules, earnings and expense statements, feasibility studies, appraisals, evaluations, assessment schedules, and material audits or inventories required for certification of force account construction performed by the City. L. Attending additional meetings or site visits beyond those specifically identified in scope of work services. M. Design, contract modification, studies, or analysis to comply with Local, State, Federal, or other regulatory agencies that become effective after the date of this agreement. N. Additional design effort not specifically included in the scope of work. pw://Carollo/Documents/Client/TX/Fort Worth/8258W/Project Management/Contracts/Amendment 2 Attachment A-3(A) O. Providing additional copies of reports and studies. P. Assistance to the City as an expert witness in any litigation with third parties, arising from the development or construction of the project including the preparation of engineering data and Preparation of all applications and supporting documents for governmental grants, loans or advances in connection with the Project; preparation or review of environmental assessments and impact statements; review and evaluation of the effect on the design requirements of the Project of any such statements and documents prepared by others; and assistance in obtaining approvals of authorities having jurisdiction over the anticipated environmental impact of the Project. Q. Services after the award of each contract in evaluating substitutions not specified in an "or equal" proposed by the Contractor(s) as authorized by the City. R. Making revisions to Drawings and Specifications occasioned by substitutions. S. Additional services during construction made necessary by: 1. Work damaged by fire or other cause during construction. 2. A significant amount of defective or neglected work of contractor(s). 3. Construction period beyond what was specified in the basic services. 4. Acceleration of the progress schedule required by the City involving services beyond normal working hours, and default by contractor(s). pw://Carollo/Documents/Client/TX/Fort Worth/8258A10/Project Management/Contracts/Amendment 2 Attachment A-3(A) City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 10/12/2010 DATE: Tuesday, October 12, 2010 REFERENCE NO.: **C-24530 LOG NAME: 60VC WWTP SECONDARY&FILTER REHAB —AMEND2 SUBJECT: Authorize Amendment No. 2 in the Amount of$350,000.00 to City Secretary Contract No. 38537 with Carollo Engineers,P.C.,for the Design of Village Creek Wastewater Treatment Plant Secondary Area and Filters Rehabilitation and Modifications (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 2 in the amount of$350,000.00 to City Secretary Contract No. 38537,with Carollo Engineers,P.C.,for the design of Village Creek Wastewater Treatment Plant secondary area and filters rehabilitation and modifications, thereby increasing the contract cost to$1,392,000.00. DISCUSSION: On April 28, 2009, (M&C C-23490)the City Council authorized the execution of an engineering agreement with Carollo Engineers,P.C.,in the amount of$893,000.00 for the design of Village Creek Wastewater Treatment Plant(WWTP) Secondary and Filter Rehabilitation and Modification. The project consists of the rehabilitation and modification of final clarifiers 22 and 24,return sludge pump station modifications,the deep bed media filters study and valve replacement and the traveling bridge/continuous backwash filter modifications. On March 9, 2010, (M&C C-24127)Amendment No. 1 in the amount o f$149,000.00 was approved, which included detailed assessment of deep media filters,piping modifications for separating(Return Activated Sludge)RAS Pump Station 6 and 7,yard piping and meter vaults for primary effluent flow, geotechnical investigation, as well as deletion of deep media filter bulkhead design. This Amendment No.2 includes engineering services during construction for the Village Creek WWTP Secondary and Filter Rehabilitation and Modification. These services will include project administration and coordination;maintenance of electronic filing system;pre—construction conference;monthly progress meetings and site visits; weekly coordination with City, Contractor and Inspector;review of shop drawings, pay estimates,record data, operational&maintenance manuals and other submittals;project completion activities; and furnishing of Record Drawings. Carollo Engineers,P.C.,proposes to perform the necessary additional engineering work for an amendment fee not to exceed$350,000.00.The City staff considers this amendment to be fair and reasonable for the additional scope of services proposed. Carollo Engineers,P.C.,is in compliance with the City's M/WBE Ordinance by committing to 21 percent M/WBE participation on this Amendment No. 2. The City's goal on this Amendment is 21 percent. This project is located in COUNCIL DISTRICT 5 (Mapsco 68N) and serves all districts. FISCAL INFORMATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers FROM Fund/Account/Centers P275 531200 701300128080 $350.000.00 CERTIFICATIONS: Submitted for City Manager's Office by: Fernando Costa (6122) Originating Department Head: S.Frank Crumb (8207) Additional Information Contact: Farida S. Goderya (8214) ATTACHMENTS 1. 60VC WWTP SECONDARY&FILTER REHAB —AMEND2 FAR.pdf 2.Amend#2 MWBE Comnliance.pdf 3. VC WWTP LocationMaI.12df