HomeMy WebLinkAboutContract 38184COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Today Fossil Land, La ,hereinafter called "Developer", desires
to make certain improvements to N. Beach Street Median Opening, an addition to the
City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
N. Beach Street Median Opening
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
dama,aes are caused, in whole or in part, by the altered neQli'aence of
the City of Fort Worth, its officers, servants, or employees.
I Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
N. Beach Street Median Opening CFA 2
CFA 2007092 - 10 23 07
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A4) None; Paving (B)Attached
Storm Drain (B-1) None; Street Lights and Signs (C) Attached..
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developers) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B and
C. The estimated total cost of current improvements and related support
services specified in this agreement, including design, construction and
inspection is estimated to $ 70,247.44.
N. Beach Street Median Opening CFA 3
CFA 2007092 - 10 23 07
SUMMARY OF COST
N. BEACH STREET MEDIAN
OPENING
Item
Developer
Cost
City Cost
Total Cost
A. Construction
1. Streets
$ 62,67400
$ 62,67400
2. Storm Drainage
3. Street Lights
$ 3,813.00
$ 37813500
4. Street Name Signs
B. Engineering Design
C. Construction Engineering
and Management by DOE
4%
$ 21506/96
$ 21506096
D. Materials Testing by DOE
(2%)
$ 17253048
$ 11253048
TOTALS
$ 707247044
$ 70,247.44
Notes:
l .All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
N. Beach Street Median Opening CFA 4
CFA 2007092 - 10 23 07
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in triplicate, at Fort Worth, Texas this the 1 Oth day of July, 2008.
Approval Recommended:
Transportation and Public Works
Department
William A. Verkes%P.E.
Director, Transportation and
Public Works Department
Cit of Fo . Worth �
' Fernando Costa
Assistant City Manager
1 `
Marty Hend ' leiO M&C REQUIRED
City Secretary
ATTEST:
Corporate Secretary
N. Beach Street Median Opening CFA
CFA 2007092 - 10 23 07
DEVELOPER
Today Fossil Land, L.P.
By:
5
.�.
0 o D m
t
O L L FS 0 0 a 0
3eG.L.V voc n0
c CPO cot um
m
m c 3 070
; D W
oL°o>f«paOo mm
p D o+c'`vYnn= pL
cv u Q c o 0 0
oea 3.
o fwo
0 It
r'-awt
m`o of o n�
a o m m` 0 o 3 n E Y
o
00 F v m Y o m c m 3
p 4 p Ot O` - p
OpOL,p
c> .. •• o c 0 E >o
O O P m; p m i ; c°
0.5
o.xoE oD�o' pyi
c �'ocmo°:c woo
�y33ae o-o~ yav o Dacw' a°
u E4 0.O 0 3�% 0 4a
Oroo-A Qrt. o 0 c P'd O
o; U C 7 0 O U�
M � � M
0 aFc'- 3
aa°
°
>E%m nm i°ua
9 E p c 0 C W m 1p m _ c
'oe�•pp me oo
°V O o
Cp�i m -'"0 0
g CV
a eDs° cD E
pp� m 0 a
TY O m 0 pig 6
05®.-`otLOD�n c aAw 3
rho onwv`Uwc- m zo.a in
333
00
0
0
R-
M
i
QQ
d
y
�
T
V)
z
no
00
O►�U
i
(0
�
1
M'O
O
V1
f� > M nitm ��LO
]C J I LO
�9 � w C) I
li] w « o w
o W ? �"'ki'
z w Yn_I
Zo'���00
o w
W w az
0
Lo a
0)o
M L�
L
�
h
NM�'3r
�•-+t
;ESN
Cl
Ml7
O
W
dOPJ
ODt"'�O1
p
r�tr
n
Lb
d'ggt
io
CN�td
z
z
z
z
0
wn0
zz
z
z
z
z
0
Or,
In
ennO�tV
90n
c�jO
Wp
o0)NCAW.))pa
?n
c4n..
6
N3
N
tV
.
0ru
N..
1d0Nrl
1
(O
LO
n
.n
M
w
J
Q
o�0o�ilo
in
LJ
co O
I
�a
00
e
d M a z 0 L<
�m�4a
®
0
LVO
n
0
CO
40O
m
Cr
vi
st
�
44t
44t
W
M
N
M
of
C?
3w3
33www333w
8
�
x
o
>°
D
eL)
g
v
a
L
C
a�n
c
D
a m
u3
u�
1O
n
n
0
>C
z
C3
N
?
¢o
0
I
n
n
N
Ltd
i
I
1
1
- TODAY FOSSIL LAND, L.
D205361303
p D.R.T.C.T.
\
1 �
_ CPO )008
R 20'-
-------- --
q
o:
N
O
532.7'
N.BEACH STREET
R= 300'
LEGEND
-•, 7, r N:
Pat �li'r"oEiAl�s '"� �
U
FUTURE LOCATION I
BYLIGHT
" POLE I F ]
n
R=AO' V1
N ti N --I -40
w
L G% OLE TOLm O
SE R IOVED TO BE RpgOa1 DER
CONSTRUCT STD 6• CMI AND U
TTER PER CITY DETAILS v
cd
W aa��
ONE'am�
® b gaaV
MEN W gw
PAVING PLAN
EXHIBIT B
NALFF ASSOCIATES, Inc.
4000 Fossil Creek Boulevard
Fort Worth, Texas 76137
(817) 847-1422
CLIENT: Today Fossil Land, LP.
PROJECT: N. Beach Street Median Opening
Bid Summary
DATE: Aug. 06, 2008
AVO: 24741
FILE NAME: Bid Summary 080806
Bid By: PAVECON
Contact: Duane Jenkins
Total Unit Total
Item No. Description Quantity Unit Cost Amount
1 Site Preparation and Mobilization 1 LS $2,327.00 $2,327.00
2 Traffic Control 1 LS $4,876.00 $4,876,00
3 Remove Existing Trees
4 Remove Existing Curb and Gutter
5 Unclassified Street Excavation
6 Subgrade Preparation for Concrete Paving
7" Reinforced Concrete Pavement (for Turn
7 Lane)
6" Reinforced Concrete Pavement (for Drive
8 Approach)
9 Joint Seal
10 Backfill and Cleanup
11 Pavement Markers and Signage
Maintenance Bond
1 LS $1,552.00 $1,552.00
540 LF $9.80 $5,292.00
420 CY $21.82 $9,164,40
627.0 SY $5.84 $37661.68
4,340 SF $5.88
$25,519.20f
510 SF $6.10 $3,111.00
1 LS $2,114.00 $21114.00
1 LS $2,988.00 $2,988.00
1 LS $776.00 $776.00
1 LS $1,293.00
TOTAL
4% Inspection Fee =
2% Material Testinq Fee =
$1,293.00�
$62,674.28
$2,506.97
$1,253.49