HomeMy WebLinkAboutContract 51702-AR2 CSC No.51702-AR2
FORT WORTH. City of Fort Worth
��_ Construction Allowance Request#2
Project Name 2014 CIP Year 3 Contract 1 City Sec# 1 51702
Client Prqect#(s)l 02693
Project 2014 CIP Year 3 Contract 1:This is a combined street paving improvements and water and sanitary sewer main replacements project in the Ridglea North
Description Neighborhood
Contractor Texasbit-JLB City Inspector William Mattegat
Funding Allocation Account Water Sewer 2014 CIP TPW Totals Select Day
T e
Original Contract Amount $4,897,386.70 1,186,890.70 $2,761,226.20 515,863.04 $9,361,366.64 730
Extras to Date $59,131.00 $59,131.00 7
Credits to Date
Current Contract Amount $4,956,517.70 $1,186,890.70 $2,761,226.20 $515,863.04 $9,420,497.64 737
Amount of Proposed Allocation $0.00 $0.00 $84,912.26 $0.00 $84,912.26
Original Allowance Available for Allocation $150,000.00 70,000.00 150,000.00 50,000.00 20,000.00
Allowance Funds Previously Allocated
Remaining Funds Available for this Allocation $150,000.00 $70,000.00 $150,000.00 $50,000.00 $420,000.00
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed
Construction Allowance Request(with attachments)to the Construction Allowance Request:to remove existing alley pavement and replace it with concrete pavement and
Asphalt transition.This Alleyway is located off Halloran St between Malvey Ave and Locke Ave and the drainage from Halloran should flows down the alley but the alley
pavement has deteriorated and is causing flooding issues to adjacent property.This construction allowance will fix both the pavement and the drainage issues in this
alleyway.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements.
Oontrac WS game _.m,.. _ _ .. Date
TexasBit Martin Wigg
ctiort S itr _ . Rafe r
A"IslafltDirector Rate f s iir Sri ®f . w
Asstaftt Al>xi Date tar Dele.
M&C Number NIA M&C Date Approved
e� OFFICIAL RECORD
vk�— vE� CITY SECRETARY
0 _�� 2020
oFr05zwoVh FT. WORTH,TX
CIl`il�SCCREiA?.� a
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract,including
ensuring all performance and reporting requirements.
Name f Employee/Signature.,�� � _—
r
-S�.
Title
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
ATTEST:
Mary J. Kayser, City Secretary
City of Fort worth
Construction Allowance Additions
Project Name 2014 CIP Year 3 Contract 1 City Sec# 51702
Client Project# 02693
Contractor Texasbit-JLB Inspector William Mattegat
ADDITIONS
Unit UnitCost
Remove Conc Pvmt 134.00000000
0241.1100 Remove Asphalt Pvmt 2014 IP 600.00000000 18.95
7 one Pvmt 600.000000007
6"Asphalt 0014 TIP 100.00000000 84.01
Water 0.00
Sewer $0.00
2014 CIP $84,912.26
TPW $0.00
Sub Total Additions 84,912.26
Construction Allowance Additions Page 2 of 4
FORTNVORTH City of Fort Worth
Construction Allowance Deletions
Project Name 2014 CIP Year 3 Contract 1 City Sec# 51702
Client Project# 02693
Contractor Tezasbit-JLB Inspector William Mattegat
DELETIONS
Unit UnitCost Total
onstruction Allowance
Water 0.00
Sewer $0.00
2014 CIP 4,
TPW $0.00
Sub Total Deletions 4,
Construction Allowance Deletions Page 3 of 4
MISBE Breakdown for this Construction Allowance
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Construction Allowance
CO# DATE AMOUNT
Total $0.00
BIM 360 Document Management Page 1 of 2
Q AUTODESW BIM 360- fortworthgov;CO2693-2014CIP Year 3 Contract-l- A IA
::: Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES
Reviews > Reviewdetail
CLOSED #24 Construction Allowance Approval Workflow
Export Report This review is closed.
Name- Description Version Markup Comments PROGRESS
d CPN D26932014 CIP Year 3 Contract l-all_ — VI 0 No comments yet.
Initiator Initial Review n
r CPN 02693 2014 CIP Year 3 Contract l-all- — VI 0 No comments yet. MH Mary Hanna Apr 3,3:49 PM
<ma ry.ha nna @fortworthtexas.gov>
Submitted to Reviewer 1
Reviewer l Initial Review l
LZ Lane Zarate Apr 8,1:26 PM
<la ne.rarate@fortworthtexas.gov>
Submitted to Reviewer 2
Reviewer2 Initial Revlew2
LP Lauren Prieur Apr 9,9:51 AM
<tau ren.p rieu r@fortworthtexas.gov>
Submitted to Reviewer 3
No comments
Reviewer3 Initial Revlew3
WJ William Johnson Apr15,11:46AM
<william.loh nson @fo rtworthtexas.gov>
Submitted to Reviewer 4
Reviewer4 Initial Review4
DB Douglas Black Apr16,5:47 PM
<doug.black@fortworthtexas.gov>
Submitted to Reviewer5
approved.
Show more
Reviewers Initial Review 5 n
DE Dana Burghdoff Apr 16,554 PM
<da na.bu rghdoff@fortworthtexas.gov>
Submitted to Approver
Approve
Approver Final Review
MM Matthew Monedero Apr20,10:32AM
<matthew.monedem@fortworthtexas.gor
Review ended
Approved Construction Allowance for
CPN CO2693-2014 CIP Year 3 Contract
-1
Review closed
C
0MCIAL RECORD
C CITY SECRETARY
FT, WORTH,TX