WHEREAS, the City of Fort Worth (CITY) and James DeOtte
Engineering, Inc., (ENGINEER) made and entered into City
Secretary Contract No. 38511, (CONTRACT) which was authorized
by M&C C-23420 on the 31st day of March, 2009 in the amount
of $442,172.00; and
WHEREAS, the CONTRART was subsequently revised by
Amendment No. 1 in the amount of $19,475.00 which was
authorized administratively on December 22, 2011; and
WHEREAS,the CONTRACT involves engineering services for
the following project:
Sanitary Sewer Main 257 Upper and Middle Village Creek
Parallel Relief Main, Part 1; and
WHEREAS, it has become necessary to execute Amendment
No. 2 to the CONTRACT to include an increased scope of work
and revised fee.
NOW TIIEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
September 30, 2013, a copy of which is attached hereto and
incorporated herein. The cost to City for the additional
design services to be performed by Engineer totals
$95,687.00.
0
Article II of the CONTRACT is amended
increase in the fee to be paid to Engineer
services performed under the Contract, as
the total fee paid by the City for all
shall be an amount of $557,334.00.
Page -I-
to provide for an
for all work and
amended, so that
work and services
OFFICIAL RECORD
CITY SECRETARY
R E 11�
3.
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and
effect.
EXEC t rEI) turd EFFECTIVI;., as of the date last written by
a signatory, below.
APPROVED:
C' Eort rth '
Fernando Costa
Assistant City Manager
DATE: /Z�Z / 3
APPROVAL RE O NDED:
04
S. Frank Crumb, P.E.
Director, Water Department
APPROVED AS TO FORM AND
LEGALITY:
(/
Douglas W. Black
Assistant City Attorney
ENGINEER
James eOt�E 17P.L.S.
ng, Inc.
Jam s De tte, P.E
Pres ent
DATE:
M&C: C-26561
Date: 11/12/2013
ATTEST:
Mary
J. R s r 8 0
City Secret o� � �
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page -2-
M&C Review
Page 1 of 2
COUNCIL ACTION: Approved on 11/12/2013
Official site of the City of Fort Worth, Fey -as
FLIRT WORTH
DATE: 11/12/2013 REFERENCE NO.: **C-26561 LOG NAME: 60M257A2-
DEOTTE
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 38511, an
Engineering Agreement with James DeOtte Engineering, Inc., in the Amount of $95,687.00
for a Revised Total Contract Amount of $557,334.00 for Design Services for Sanitary
Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1, Thereby
Increasing the Contract Amount to $557,334.00 (COUNCIL DISTRICT 8)
RECOMMENDATION:
It is recommended that the City Council authorize execution of Amendment No. 2 to City Secretary
Contract No. 38511, an Engineering Agreement with James DeOtte Engineering, Inc., in the amount
of $95,687.00 for Design Services for Sanitary Sewer Main 257 Upper and Middle Village Creek
Parallel Relief Main, Part 1, thereby increasing the contract amount to $557,334.00.
DISCUSSION:
On March 31, 2009, .(M&C C-23420) the City Council authorized an Engineering Agreement with
James DeOtte Engineering, Inc., in the amount of $442,172.00 for design services for Sanitary Sewer
Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1. The Agreement was
subsequently revised by Amendment No. 1 in the amount of $19,475.00 which was authorized
administratively on December 22, 2011.
Amendment No. 2 will allow for the design of a proposed junction structure and additional sanitary
sewer improvements on Mains 257 and 503 at the intersection of both mains near Salt Road.
James DeOtte Engineering, Inc., proposes to provide the additional services for a lump sum fee in
the amount of $95,687.00. Staff considers this fee to be fair and reasonable for the scope of services
to be provided.
M/WBE Office - James DeOtte Engineering, Inc., is in compliance with the City's MNVBE Ordinance
by committing to an additional 14 percent M/WBE participation on this Amendment No. 2. The City's
goal on the Amendment is 10 percent.
This project is located in COUNCIL DISTRICT 8, Mapsco 93X.
The Financial Management Services Director certifies that funds are= available in the current capital
budget, as appropriated, of the Sewer Capital Projects Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
P258 531200 708140122633 $20,467.00
P258 531200 708140122651 $21,160.00
P258 531200 708140122632 $54,060.00
http://apps.efwnet.or,/council packet/rnc rev1ew.asp?ID=19156&councilclate—ll/12/20I1 11/14/2011
M&C Review
Page 2 of 2
Submitted for City Manager's Office by
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
60M257A2-DEOTTE MAP (2).pdf
Fernando Costa (6122)
S. Frank Crumb (8207)
John R. Kasavich (8480)
1lttp://apps.efwnet.ur�4/council rocket/roc review.asn?ID=19156&coLineilciate=l 1 /12/201 ; 1 1 /14001 �
:;.,James
DeOt i P,..................
:_:Engineering.
ENGINEERING Inc.`<.. ....................
30 September 2013
Mr. John Kasavich
Water Department
City of Fort Worth
1000 Throckmorton Street
Fort Worth, Texas
Ref: M-257 and M-503
Additional Services - Amendment No. 2
City Secretary No. 38511
City Project No. 1226
Fort Worth, Texas
Mr. Kasavich,
.,.Civil Engineering.
Land Surveying
Construction Management
Hydrologic and Hydraulic Modeling
Due to additional services requested by the City as part of the referenced
project, James DeOtte Engineering, Inc. will perform the work outlined in the
following items:
Item 1
Junction Structure #12
Task 1
Design includes 4 flow control structures and 449 LF of pipe in the vicinity of Station
110+50 to Station 112+80 (M-257) and Station 437+70 to Station 439+94 (M-503).
$70,137.00 (JDEI)
Task 2
Geotechnical Borings 2 Borings to a depth of 30' $ 2,000.00 (GAI)
Task 3
Survey - Topographic survey - 70,000 square feet of creek including creek banks
and aerial crossing $ 2,000.00 (JDEI)
Task 4
Easement preparation - Prepare rights of entry, research property ownership, recover
*roperty corners, and prepare 2 easements. $ 2,000.00 (JDEI)
Task 5
Access plan and easements - research and prepare easements for construction and
maintenance access. $ 4,000.00 (JDEI)
tax 817,930.0445 6707 Brentwood Slatr Rd, Ste. 200 o Fort Worth TX, 76112 phone 817.446.6877
.............................................................................................................................................................................................
IRKS Frm Req. No. 30 10 1400 + � tBPE Firm Reg. No. 8917
1.�c a�cuxow
Task 6
Sub surface Utility investigation (Level C) — Research and locate utilities located in
the alignment corridor, approximately 449 feet. $ 2,000.00 (GAI)
Task 7
Structural Design for flow control — Prepare plans for the 4 new flow control
structures. $ 7,550.00 (AIAE)
Task 8
Design of rehabilitation for existing aerial crossings — Prepare plans to rehabilitate the
2 existing aerial crossings. $ 2,000.00 (AIAE)
Task 9
Determine flows for by-pass pumping from Wastewater Master Plan — Coordinate
with City of Fort Worth Water Department modeling section to develop flow
parameters for bypass pumping $ 2,000.00 (JDEI)
Task 10
Construction phasing plans — Prepare a Phasing plan, for the proposed
improvements. This plan will attempt to optimize the construction sequencing to
minimize system disruption. $ 2,000.00 (JDEI)
Consulting
Prime
Amount
Firm
Responsibility
Original
°
/°
Contract
Prime Consultant:
DeOtte, Inc.
Engineering
I $ 252,725.00
57.2%
Proposed M/WBE Sub -Consultants
29.0%
Gorrondona
Topographic,
and
Land Surveying
Associates,
and Subsurface
$ 108,348.00
24.5%
Inc.
Utility
Engineering
GM
Enterprises,
Geotechnical
$ 7,000.00
1.6%
Inc.
Investigation
L.A. Blueline
Reproduction
$ 12,860.00
2.9%
AIA
Structural
$ 0
0%
Engineering
Non-M/WBE Consultants:
13.8%
Reed
Wetlands
Engineering
Determination,
$ 20,320.00
4.6%
Group, LTD
EID and 404
Permitting
Frank W.
Neal &
Structural
$15,000.00
3.4%
Associates,
Engineering
Inc.
ACE Pipe
Dimension Sta
$ 3,000.00
0.7%
0+00
CMJ
Engineering,
Geotechnical
$ 3,500.00
0.8%
Inc.
Investigation
Innovative
Transportatio
Traffic Control
$ 6,500.00
°
1.5/o
n Solutions,
Plans
Inc.
AR
Consultants,
Archeological
$ 12,919.00
°
2.8 /o
Inc.
Investigation
Amd. Amd.
No.1 % No.2 °
$ 9,225.00 47.4% $ 82,137.00
$ 10,250.00 52.6%
$ 4, 000.00
$ 9,550.00
85.8%
4.2%
10.0%
Amendment 2
Work Phase
Water Fee
Sewer Fee
Total Fee
31
$0
$2,780
$2,780
32
$0
$56,717
$56,717
33
$0
$15,030
$15,030
51
$0
$21,160
$21,160
Total
$0
$95,687
$95,687
I
Description Design
Management
Task 1 $4,330
Task 2
Task 3
Task 4
Task 5
Task 6
Task 7
Task 8
Task 9
Task 10
Total $4,330
Amendment 2
Preliminary
Final Bid Construct
Design
Design Phase ion Phase
Services Services
$36,050
$7,480 $2,452 $2,985
$2,000
1
ROW/Easement Survey Permitting
Services Services
$2,860 $10,300 $3,680
$2,000
I
$4,000
$3,550
$1,000
$1,000
$1,000
$1,000
$2,000
$46,050
$15,030 $2,452 I $2,985
Description
Original
Fee
Concept Phase
$138,562
Preliminary Design
$93,029
Final Design
$73,230
Bid Phase Services
$5,630
Construction Phase
S
rvi
eces
ROW/Easement
Services
Survey Services
Permitting
$2,000
$2,000
$4,000
I I
I I (
$8,860 ( $12,300 I $3,680
Amend No. Amend No. Revised
1 2
Contract
$4,330
$142,892
$46,050
$139,079
$15,030
$88,260
$2,452
$8,082
$2,985
I $17,525
$38,123
$60,1 18 $19,475
$18,940
$46,983
$91,893
$22,620
$557,334
Amendment #2
Sub -Consultant Fee
Gorrondona & Associates, Inc. $4,000
AIA Engineering $9,550
Total $13,550
M/WBE Percentage 14.2%
Description Original Revised
Contract Amount $442,172 $557,334
Total Contract M/WBE $128,208 $141,758
Total Contract 29% 25.4%
M/WBE Percentage
Sincerely
Faa
James E. DeOtte, P.E., R.P.L.S.
President