Loading...
HomeMy WebLinkAboutContract 38511-A2CITY SECRETARY AMENDMENT No. 2 CONTRACT NO. _ - 0— TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering, Inc., (ENGINEER) made and entered into City Secretary Contract No. 38511, (CONTRACT) which was authorized by M&C C-23420 on the 31st day of March, 2009 in the amount of $442,172.00; and WHEREAS, the CONTRART was subsequently revised by Amendment No. 1 in the amount of $19,475.00 which was authorized administratively on December 22, 2011; and WHEREAS,the CONTRACT involves engineering services for the following project: Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW TIIEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 30, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $95,687.00. 0 Article II of the CONTRACT is amended increase in the fee to be paid to Engineer services performed under the Contract, as the total fee paid by the City for all shall be an amount of $557,334.00. Page -I- to provide for an for all work and amended, so that work and services OFFICIAL RECORD CITY SECRETARY R E 11� 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXEC t rEI) turd EFFECTIVI;., as of the date last written by a signatory, below. APPROVED: C' Eort rth ' Fernando Costa Assistant City Manager DATE: /Z�Z / 3 APPROVAL RE O NDED: 04 S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: (/ Douglas W. Black Assistant City Attorney ENGINEER James eOt�E 17P.L.S. ng, Inc. Jam s De tte, P.E Pres ent DATE: M&C: C-26561 Date: 11/12/2013 ATTEST: Mary J. R s r 8 0 City Secret o� � � OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page -2- M&C Review Page 1 of 2 COUNCIL ACTION: Approved on 11/12/2013 Official site of the City of Fort Worth, Fey -as FLIRT WORTH DATE: 11/12/2013 REFERENCE NO.: **C-26561 LOG NAME: 60M257A2- DEOTTE CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 2 to City Secretary Contract No. 38511, an Engineering Agreement with James DeOtte Engineering, Inc., in the Amount of $95,687.00 for a Revised Total Contract Amount of $557,334.00 for Design Services for Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1, Thereby Increasing the Contract Amount to $557,334.00 (COUNCIL DISTRICT 8) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 2 to City Secretary Contract No. 38511, an Engineering Agreement with James DeOtte Engineering, Inc., in the amount of $95,687.00 for Design Services for Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1, thereby increasing the contract amount to $557,334.00. DISCUSSION: On March 31, 2009, .(M&C C-23420) the City Council authorized an Engineering Agreement with James DeOtte Engineering, Inc., in the amount of $442,172.00 for design services for Sanitary Sewer Main 257 Upper and Middle Village Creek Parallel Relief Main, Part 1. The Agreement was subsequently revised by Amendment No. 1 in the amount of $19,475.00 which was authorized administratively on December 22, 2011. Amendment No. 2 will allow for the design of a proposed junction structure and additional sanitary sewer improvements on Mains 257 and 503 at the intersection of both mains near Salt Road. James DeOtte Engineering, Inc., proposes to provide the additional services for a lump sum fee in the amount of $95,687.00. Staff considers this fee to be fair and reasonable for the scope of services to be provided. M/WBE Office - James DeOtte Engineering, Inc., is in compliance with the City's MNVBE Ordinance by committing to an additional 14 percent M/WBE participation on this Amendment No. 2. The City's goal on the Amendment is 10 percent. This project is located in COUNCIL DISTRICT 8, Mapsco 93X. The Financial Management Services Director certifies that funds are= available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P258 531200 708140122633 $20,467.00 P258 531200 708140122651 $21,160.00 P258 531200 708140122632 $54,060.00 http://apps.efwnet.or,/council packet/rnc rev1ew.asp?ID=19156&councilclate—ll/12/20I1 11/14/2011 M&C Review Page 2 of 2 Submitted for City Manager's Office by Originating Department Head: Additional Information Contact: ATTACHMENTS 60M257A2-DEOTTE MAP (2).pdf Fernando Costa (6122) S. Frank Crumb (8207) John R. Kasavich (8480) 1lttp://apps.efwnet.ur�4/council rocket/roc review.asn?ID=19156&coLineilciate=l 1 /12/201 ; 1 1 /14001 � :;.,James DeOt i P,.................. :_:Engineering. ENGINEERING Inc.`<.. .................... 30 September 2013 Mr. John Kasavich Water Department City of Fort Worth 1000 Throckmorton Street Fort Worth, Texas Ref: M-257 and M-503 Additional Services - Amendment No. 2 City Secretary No. 38511 City Project No. 1226 Fort Worth, Texas Mr. Kasavich, .,.Civil Engineering. Land Surveying Construction Management Hydrologic and Hydraulic Modeling Due to additional services requested by the City as part of the referenced project, James DeOtte Engineering, Inc. will perform the work outlined in the following items: Item 1 Junction Structure #12 Task 1 Design includes 4 flow control structures and 449 LF of pipe in the vicinity of Station 110+50 to Station 112+80 (M-257) and Station 437+70 to Station 439+94 (M-503). $70,137.00 (JDEI) Task 2 Geotechnical Borings 2 Borings to a depth of 30' $ 2,000.00 (GAI) Task 3 Survey - Topographic survey - 70,000 square feet of creek including creek banks and aerial crossing $ 2,000.00 (JDEI) Task 4 Easement preparation - Prepare rights of entry, research property ownership, recover *roperty corners, and prepare 2 easements. $ 2,000.00 (JDEI) Task 5 Access plan and easements - research and prepare easements for construction and maintenance access. $ 4,000.00 (JDEI) tax 817,930.0445 6707 Brentwood Slatr Rd, Ste. 200 o Fort Worth TX, 76112 phone 817.446.6877 ............................................................................................................................................................................................. IRKS Frm Req. No. 30 10 1400 + � tBPE Firm Reg. No. 8917 1.�c a�cuxow Task 6 Sub surface Utility investigation (Level C) — Research and locate utilities located in the alignment corridor, approximately 449 feet. $ 2,000.00 (GAI) Task 7 Structural Design for flow control — Prepare plans for the 4 new flow control structures. $ 7,550.00 (AIAE) Task 8 Design of rehabilitation for existing aerial crossings — Prepare plans to rehabilitate the 2 existing aerial crossings. $ 2,000.00 (AIAE) Task 9 Determine flows for by-pass pumping from Wastewater Master Plan — Coordinate with City of Fort Worth Water Department modeling section to develop flow parameters for bypass pumping $ 2,000.00 (JDEI) Task 10 Construction phasing plans — Prepare a Phasing plan, for the proposed improvements. This plan will attempt to optimize the construction sequencing to minimize system disruption. $ 2,000.00 (JDEI) Consulting Prime Amount Firm Responsibility Original ° /° Contract Prime Consultant: DeOtte, Inc. Engineering I $ 252,725.00 57.2% Proposed M/WBE Sub -Consultants 29.0% Gorrondona Topographic, and Land Surveying Associates, and Subsurface $ 108,348.00 24.5% Inc. Utility Engineering GM Enterprises, Geotechnical $ 7,000.00 1.6% Inc. Investigation L.A. Blueline Reproduction $ 12,860.00 2.9% AIA Structural $ 0 0% Engineering Non-M/WBE Consultants: 13.8% Reed Wetlands Engineering Determination, $ 20,320.00 4.6% Group, LTD EID and 404 Permitting Frank W. Neal & Structural $15,000.00 3.4% Associates, Engineering Inc. ACE Pipe Dimension Sta $ 3,000.00 0.7% 0+00 CMJ Engineering, Geotechnical $ 3,500.00 0.8% Inc. Investigation Innovative Transportatio Traffic Control $ 6,500.00 ° 1.5/o n Solutions, Plans Inc. AR Consultants, Archeological $ 12,919.00 ° 2.8 /o Inc. Investigation Amd. Amd. No.1 % No.2 ° $ 9,225.00 47.4% $ 82,137.00 $ 10,250.00 52.6% $ 4, 000.00 $ 9,550.00 85.8% 4.2% 10.0% Amendment 2 Work Phase Water Fee Sewer Fee Total Fee 31 $0 $2,780 $2,780 32 $0 $56,717 $56,717 33 $0 $15,030 $15,030 51 $0 $21,160 $21,160 Total $0 $95,687 $95,687 I Description Design Management Task 1 $4,330 Task 2 Task 3 Task 4 Task 5 Task 6 Task 7 Task 8 Task 9 Task 10 Total $4,330 Amendment 2 Preliminary Final Bid Construct Design Design Phase ion Phase Services Services $36,050 $7,480 $2,452 $2,985 $2,000 1 ROW/Easement Survey Permitting Services Services $2,860 $10,300 $3,680 $2,000 I $4,000 $3,550 $1,000 $1,000 $1,000 $1,000 $2,000 $46,050 $15,030 $2,452 I $2,985 Description Original Fee Concept Phase $138,562 Preliminary Design $93,029 Final Design $73,230 Bid Phase Services $5,630 Construction Phase S rvi eces ROW/Easement Services Survey Services Permitting $2,000 $2,000 $4,000 I I I I ( $8,860 ( $12,300 I $3,680 Amend No. Amend No. Revised 1 2 Contract $4,330 $142,892 $46,050 $139,079 $15,030 $88,260 $2,452 $8,082 $2,985 I $17,525 $38,123 $60,1 18 $19,475 $18,940 $46,983 $91,893 $22,620 $557,334 Amendment #2 Sub -Consultant Fee Gorrondona & Associates, Inc. $4,000 AIA Engineering $9,550 Total $13,550 M/WBE Percentage 14.2% Description Original Revised Contract Amount $442,172 $557,334 Total Contract M/WBE $128,208 $141,758 Total Contract 29% 25.4% M/WBE Percentage Sincerely Faa James E. DeOtte, P.E., R.P.L.S. President