CSC No.53179-AR1
6 WORTH. City of Fort Worth
Construction Allowance Request Breakdown
Construction CA# Date 2121/2020 City Sec# 53179
Client Project#(s)l CO2101
FAC#(s)
Project Name Silver Creek Road Improvements-Phase 2
Description
Contractor Texas Sit City Inspector John Crowley
Funding TPW Contract Time
Allocation Account Totals (CID)
Original Contract Amount $4,918,903.64 $4,918,903,64 352
Extras to Dale
Credits to Dale
Currant Contract Amount $4,918,903.64 $4,918,903.64 352
Amount of Proposed Allocation $2,075.00 _ $2,075.00 0
Original Allowance Available for Allocation $100,000.00 T $100,000.00
Allowance Funds Previously Allocated
Remaining Funds Available for this Allocation $100,000.00 $100,000.00
JUSTIFICATION SUMMARY
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material
as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:Installation of additonal
No Thru Trucks signs at 5 locations in the vicinity of the project.
Contractor: Inspector:
�By: .cQCLt�yL ID By:
Name: Aaron Perez `f Name: John Crowley
Title: Asphalt Operations Manager-FW pate:
Date: 4/2212020
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and
reporting requirements. E
Cnal 4- WsCflm sn Name Canlm0 r Nanw tru tact' . +�a14irE Dale
Texas Bit Aaron Perez See above
In eKrar n� Go-�r Su for Palo Pl;s eel 1dal+q arrPrp fan1 M r oats
John Crowley 4/27/2020
Aml§Mani;)lreG'nr IDs olsh _ RTffS iSF'GonMtElln do plilndri! Q Do!g
May 12,2020 ; May 12,2020
A§65lanl(' Al lompy Aasls3a. ' -Ma �Or. t7plrt
May 12,2020 ^w k� a May 12,0
un�i If
M&C Number N/A M&C Da GvIA �� �
Contract Compliance Manager:
By signing I acknowledge that 1 am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
A. Ayala / A.AyMay7,2i420}
Nance of Employee/Signature
Sr. Project Manager
Title
Ll This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
ATTEST: -
Mary I Kayser,City Secretary
FORT WORTH,.. City of Fort Worth
Construction Allowance Request Breakdown
Construction FOA# 0 Date 2/21/2020 City Sec# 53179
Client Project#(s) CO2101
FAC#(s)
Project Name Silver Creek Road Improvements-Phase 2
Description
Contractor Texas Bit City Inspector John Crowley
ADDITIONS
DeptJFAG Qty Unit UnitCost total
o ThruTruck)Signs installed on Galvanized Posts
TPW 2,075.00
Sub Total A ditions $2,075.00
Change Order Additions Page 1 of 1
FORT WORTH. City of Fort Worth
Construction Allowance Request Breakdown
Construction FOA# 0 Date 2/21/2020 City Sec# 53179
Client Project#(s) CO2101
FAC#(s)
Project Name Silver Creek Road Improvements-Phase 2
Description
Contractor Texas Bit City Inspector John Crowley
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
ep y Unit UnitCost o a
Construction Allowance
TPW 2,075.00
Sub Total Deletions 5.
Change Order Deletions Page 1 of 1
MIVIBE Breakdown for this Construction Allowance Request
MWBE Sub Type of Service Amount for this FOA
N/A NA
Total $0.00
Previous Construction Allowance Requests
co# DATE AMOUNT
NA
Total $0.00
Ayala, Alejandra
From: Perez,Aaron R(TexasBit) <aaron.perez@TexasBit.com>
Sent: Tuesday,January 7, 2020 8:21 AM
To: Ayala, Alejandra
Cc: Roberts,Jennifer;Alonso, Pedro (TexasBit); Brown,TJ (TexasBit)
Subject: RE: [EXT] CO2101 Silver Creek- Request for No Thru Truck Signs
Follow Up Flag: Follow up
Flag Status: Completed
Categories: ASAP
CAUTION:This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Alex,
For the No Thru Truck signs were looking at the following:
Items I DeZdption Unit cbmtky Unit Price Total
C0111 1115-2(No Thru Track)Slams Installed an Galvanized Past EA 5 415.00 $2,075.00
If approved I can better give you an installation time.
Thanks
Aaron Perez
Asphalt Operations Manager—Fort Worth
TexasBit
A CRH COMPANY
PO Box 24131
Fort Worth, Texas 76124
O(817)261-2991
C(817)876-8005
E aaron.r)erez(a,texasbit.com
TEXAS
www.texasbit.com
From: Brown,TJ (TexasBit)<tjbrown@texasbit.com>
Sent:Tuesday, December 31, 2019 9:59 AM
To:Ayala,Alejandra <Alejandra.Ayala@fortworthtexas.gov>; Perez,Aaron R (TexasBit)<aaron.perez@TexasBit.com>
1
dl�"eelior`-E■ �� �
ra:l
rLOCATED ALONG THE
EASTERNNSTALL R5-2 SIGNS ALONG THE WESTERN RIGHT-OF-WAY OF THE
NTERSECTIONS,DIRECTLY ACROSS FROM EXISTING R5-2 SIGNS
� - • b� �• rau din.ce r-rtl �a`4 s, •
r
s h/rP'SPrr� � solid Rock Church•t _ p, t�n4 n�nFl m
eoe ��lr
ti� SPrriP r
aII.W • KioWa TrailW 5 �Pnr ■R•
l _
+' •' .� _� Redee�megBihle Church� o ', - t � a
��+ ;� ���+ ■�ErlrTihe Church of _ - _ 'Ivsm+wrwPPdor
1 N _. i=_ 'd/Jesus Christ of Latteri, m -
vMee rrau w + , -vema,rrml w ■ _ .
'Y-o ■
r � •� ' � � Fort Worth Fire �
+ fr• � Department 32� � -
' r _ t 'WhiteiSettlemenPRd`��+
�a
Tall Oak Dr Tall Oak Dr 4 � � crayoak in � Roach Wranglers®
1 gnu 1'inil,i ` �lmePinc Ln �.' - HoK'1 �Q 0 -a'
INSTALL R5-2 SIGN ALONG THE SOUTHERN RIGHT-OF-WAY OF THE
INTERSECTIONS,DIRECTLY ACROSS FROM EXISTING R5-2 SIGNS LOCATED B
revi
�. ALONG THE NORTHERN RIGHT-OF-WAY
77
cl
t
� r
.i�
I
i t
•
ru t
• Silver Creek Road
Aqua
•• 1-6�Silver
M PoaP}:� t
ADD ADDITIONAL SIGN
® _
40
CEX SIGN
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 1 of 1