Loading...
HomeMy WebLinkAboutContract 52898-CO1 N n A� T CSC No. 52898-001 .CF� *% Fc,R�T ` ,6�T'H_ City of Fort Worth �P ��o �� Change Orden Request c.0 ,j roject Name: Fort Worth EMWTP 1 HSP-H-20 and Hydro Tank City Sec No.: 1 52898 Project No.(s): 56017-0600430-100271-001785 DOE No. NfA CityPrcj.No.:J 100277 I Project Description: Installation of new Hydro-Tank and HSP-H-24 Contractor. Archer Western Construction,LLC Change Order 4 0 Date: 616/2020 Jj I City Project Mgr. Dena Johnson City inspector., Carmen Drake I Phone Number: 817-392-7865 Phone Number: 817-392-8347 Dept. Water Totals Contract Time Catender days) Original Contract Amount $1,023,700.00 $t,023,700.00 395 Extras to Date Credits to Date Pending Change Orders(in M&C Process) Contract Cost to Date $1,029,700,00 $t 023 700-all 395 Amount of Pro osed Change Order $21,328,66 -sr 2a•66 Revised Contract Amount $1.045rt}7B-G6 $1,045,02t3i% 39i Original Funds Available for Change Orders $51,185.00 $51,185-OO Remaining Funds Available for this CO $51,185-00 $51,185.00 Additional Funding(if necessary) I + —1 CHANGE ORDERS to DATE(INCLUDING THIS ONE)AS%OF ORIGINAL CONTRACT 1 2,08% MAXALLOWABLE CONTRACTAMOUNT(ORIGINAL CONTRACT COST+25%) $1,279,825,00 - JU9TWICATION(REASONS)'FOR'OH+k4g1 QRBER Change Order No. 1 will provide for the following: • Additional footage of 8-inch DIP and fittings to accomodate the new location of the hydro tank pad in order to avoid conflict with an existing 36-inch storm drain. i • New gate at the treatment plant north end tower fence due to the fact that the new hydra tank pad location will block the existing gate to vehicular traffic. I • Filler flange to lift the existing 18-inch butterfly valve centerline to match the new HSP-H-20 pump discharge centerline. i I I It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. C aril rautar's G!rmparty Name � Cnnl�aclor Name G6n1rgc!.rr Slgnalufu Archer Western Construction,LLC Jeffrey Kendall Je0 Kendall 5 8 2 0 2 0 I spectra: C] 11F #�rojoc M Iraa{ter Dald / I 15//_2 1-�AreCujyyawr[fie t Dike Col: anliarl°upeNlsG+r t F.l�'k— i.1„t� rirf ��f(iaPv_ May 11,2020 ry +tant CityAtldrre p As#fl�tll Cit r�lannger I.�'! . _ May 11,2020 4a L-_ 1,202D� . gym {1 :t*aunrlAclirl� Ifi�e ulre.d. , ��, M&C Number NIA M&C Date Approved I FORT WORTH City of Fort Worth Change Order Additions Project Name Fort Worth EMWTP 1 HSP-H-20 and Hydro Tank City Sec No.: 52898 Project No.(s): 56017-0600430-100277-001785 DOE No. N/A City Proj.No.: 100277 Project Installation of new Hydro-Tank and HSP-H-20 Description Contractor Archer Western Construction,LLC Change Order:= Date: 5/6/2020 City Project Mgr. Dena Johnson City Inspector Carmen Drake ADDITIONS ITEM DESCRIPTION-- DEPT Qty Unit Unit Cost Total 2 Install additional DIP for revised tank location Water 1.00 LS $12,917.71 $12,917.71 3 Install new gate and fencing Water 1.00 LS $3,514.88 $3,514.88 4 Install filler flange on HSP-20 Water 1.00 LS $4,896.07 $4,896.07 Water $21,328.66 Page 1 of i Additions Sub Total 1$211,328.66 FORT «ORTH City of Fort Worth Change Order Deletions Project Name Fort Worth EMWTP 1 HSP-H-20 and Hydro Tank City Sec No.: 52898 Project No.(s): 56017-0600430-100277-001785 DOE No. N/A City Proj, No.: 100277 Project Description Installation of new Hydro-Tank and HSP-H-20 Contractor Archer Western Construction, LLC Change Order: 111 Date F 5/6/2020 City Project Mgr. Dena Johnson City Inspector: F Carmen Drake DELETIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total Water Page 1 of 1 IDeletions Sub Total WWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders co# DATE AMOUNT Total $0.00 Page 1 of 1 Contract Compliance Manager By signing S acknowledge that S am the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Signature . De Name of Employee Title . ATTEST: MaryJ, Kayser City 5ecretary E 9� ,;RETARY H \ t • � I r v y ( ' r vI P • CO t. f � - f Y i r.' f r• • x \ ' � r 3'a r5 � jL � 1 - f r KOFF New hydro location pad location i, rth side q ft o � 1 1 / Ji i •Tr��` � _ r __ I I I