AMENDMENT NO. 3 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
OLD HEMPHILL ROAD DROP-OFF STATION ADDITION
STATE OF TEXAS
CITY SECRETARY CONTRACT NO. ,559-$3
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Elements of Architecture, Inc., (Consultant)
made and entered into City Secretary Contract No. 49559 (The Contract) which was
authorized by the City Council by M&C Reference No.: C-28324, the 15th day of August,
2017, for Old Hemphill Road Drop-Off Station Addition; and Amendments No. 1 & No. 2
was administratively executed in the amount of $40,736.00 for revisions to the PD site
plan; and for additional signage design services, security modifications to existing site
surveillance, and additional construction administration services due to changes in the
construction sequence; and
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services agreement for additional site lighting and provision for additional
security cameras including photometric study to confirm light coverage to enhance
security. This additional request is directed by the Code Compliance Department.
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement which amends the
Contract:
1.
Article I — Scope of Services, Paragraph (2) shall be added to read as follows:
(2) Provide additional design & construction administration services for the Drop-Off
Station. The cost of this additional service is $5,845.00 plus $200.00 additional
reimbursable expenses. The scope of services is described more fully in
Elements of Architecture, Inc. Letter dated April 22, 2020, subject: "Proposal for
Hemphill Drop-Off Center— Additional Services 03, Addition of Site Lighting.
2.
Article II — Compensation, first paragraph, is amended as follows:
"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachment "D". Payment shall be considered full compensation for all labor,
materials, supplies, and equipment necessary to complete the services
described in Attachment "D". However the total fee paid by the City shall not
exceed a total of $145,597.00 including $6,900.00 in reimbursable expenses
unless the City and the Consultant mutually agree upon a fee amount for
additional services and amend this Agreement accordingly."
CPTY SECRETARN,
CFW Std.Agreement for Prof.Services AMENDMENT(Rev.20 Mar 2020) page i of'2
Old Hemphill Drop-Off Station Addition-Additional Site Lighting-Amendment No.3 I— -- May 2020
Executed effective as of the date signed by the Assistant City Manager below.
FORT WORTH:
City of Fort Worth Contract Compliance Manager:
By signing I acknowledge that I am the person
responsible for the monitoring and
_ administration of this contract, including
By: ensuring all performance and reporting
Name: f requirements.
Title: Assistant City/Manager
Date: &-am,By:
Approval Recommended: Name: Brian Glass
Title: Architectural Services Manager
Approved as to Form and Legality:
By:
>i Nam . Steve Cooke /
Title: Director, Property Management Dept. C
By:
Attest: Nam ohn B. 9yong
Title: Assistanf City Attorney
- _ Contract Authorization:
By: =i +:, �, M&C: Not Required
Name: M ry e ".
Title: Ci y Secret ry _
VENDOR:
Elements of Architecture, Inc. r --
By:
Name: Debbie Fulwiler, AIA
Title: President
Date: 7/-7
CFW Std.Agreement for Prof. Services AMENDMENT(Rev.20 Mar 2020) Page 2 of 2
Old Hemphill Drop-Off Station Addition—Additional Site Lighting—Amendment No. 3 May 2020
Attachment "A"
ELEMENTS 1201 6"Ave,Suite 100
of Architecture, Inc. Fort Worth,Texas 76104
Phone 817.333.2880
Fax 817.333.2883
April 22, 2020
Alfonso Mezo
City of Fort Worth
401 West 13th Street
Fort Worth, TX 76102
Re: Proposal for Hemphill Drop Off Center—Additional Services 03
Addition of site lighting
Dear Alfonso;
Elements is pleased to provide to you this proposal for services associated with providing new site lighting and
provision for additional security cameras. We understand that 6 new pole lights with photocell control and
incorporating 4 security cameras. A photometric study will be provided for underground conduit for power and
data distribution from the existing panels.
TOTAL PROPOSED FEE
Labor
We propose to provide our services as identified in this proposal on an hourly basis with the not to exceed
amounts as follows:
Architectural Services $ 2,050
Electrical Engineering (1,950 x 1.1) $ 2,145
Civil Engineering ($1,500 x 1.1) 1,650
TOTAL ADDITIONAL SERVICES $ 5,845
Fees listed above are for labor only.
Expenses
Reimbursable expenses as outlined in the Master Contract are estimated at$200.
PROJECT TEAM
The design team remains the same with Carrillo, Torres and Elements providing services for this change to the scope.
All firms are SBE certified.
If this proposal meets with your approval,we would anticipate an amendment to our contract for services identified
within this proposal. If you have any questions regarding this proposal or need to discuss, please call me.
Sincerely,
i
t �
Debbie Fulwiler, AIA
President
TESADDITIONAL SERVICES
Torres Engineering Services,Inc PROPOSAL
Proposal No: 1532-ASA02
Project: Old Hemphill Drop Off Center
Date: 4/15/20
Customer: Elements of Architecture, Inc.
1201 6th Avenue
Fort Worth, TX 76104
Attention: Debbie Fulwiler
ADDITIONAL SERVICES
Torres Engineering Services, Inc. is pleased to offer this additional services proposal for
electrical engineering services for the Old Hemphill Drop Off Center project.
The following are the additional services included in this proposal:
1. Add 6 new light poles, 4 with cameras.
2. Provide photometric study for site.
3. Provide pole base details (structural engineering not included).
4. Provide underground conduit layouts.
5. Provide electrical design for design above.
COMPENSATION
The compensation for engineering services in this proposal is $1,950 (One Thousand
Nine Hundred Fifty Dollars 00/100).
ACCEPTANCE
Along with this proposal, Torres Engineering Services, Inc. also agrees to the terms
established between the City of Fort Worth and Elements of Architecture, Inc. in the
contract document"Annual Architectural Agreement: Elements of Architecture, Inc."
executed with the City of Fort Worth October 9, 2006. Torres Engineering Services, Inc.
appreciates the opportunity to work with you on this project and looks forward to the
design and construction phases of this facility. Diligent efforts shall be made to
coordinate with other disciplines.
If the terms associated with this proposal are acceptable to you, please sign and return a
signed copy to me. Your signature below will provide acceptance to this proposal.
Submitted by, Accepted by,
Roberto Torres, President Debbie Fulwiler, AIA
TES Elements of Architecture, Inc.
AMENDMENT NUMBER 3 TO THE AGREEMENT BETWEEN THE
CLIENT AND CARRILLO ENGINEERING, LLC
AMENDMENT NUMBER 2 DATED January 31, 2019 to the agreements between
Elements of Architecture, Inc. ("Client") and Carrillo Engineering, LLC ("Consultant") dated
November 21, 2016 ("the Agreement") concerning the City of Fort Worth Old Hemphill Drop-off
Center(the 'Project").
The Consultant has entered into the Agreement with the Client for the furnishing of
professional services, and the parties now desire to amend the Agreement.
Therefore, it is mutually agreed that the Agreement is amended to include Additional
Services to be performed by Consultant and provisions for additional compensation by the Client to
the Consultant, all as set forth in Exhibit A hereto. The parties ratify the terms and conditions of
the Agreement not inconsistent with this Amendment, all of which are incorporated by reference.
CLIENT:
ELEMENTS OF ARCHITECTURE,INC. CARRILLO ENGINEERING,LLC
By: By:
Title: Title: Managing Member
Exhibit A to Amendment Number 3 dated
April 20,2020
Carrillo Engineering, LLC shall perform the following Additional Services:
Task 1 —Site Plan Revisions $1,500(Lump Sum)
As part of this task and at the request of the City of Fort Worth("City"),the Consultant will assist
the architect and MEP engineer in the placement of proposed site lights relative to improvements
and existing easements. The Consultant will add to the proposed lights to the site plan. We
understand the photometrics and lighting design will be completed by the MEP engineer.
I
tbK1Ytl 4'�'tl^+^3-tlt0'MRL1B'a41 NM+P� � . mvia Zug � ---
mlx�ay.^nt�-mn+�s'�*������ia
au!xa2u o xonsaav wt�i INM U as i xM"ff
DTI 11=:) ayi �!- TD6dN1�!!i Q10 09i9 _� o
°"uVw - NOILK[5 MO-JOHQ W[Hap aH 0'IO M3J wets •w.+w m-I..w. Y @ N
n �Zu i�ippl
tT--�—Q F. �8 Q �� 10s w lS ~ rca�w4
Z 3zww¢Z � 06H-w�€r s<mg
rc3z w �b z . '.J5
grc pOa z
zO 0zy ozf
g Ld 5� w
_ � a € 6ffM
o-
�S�'
Oa ... 81888t o a .t a ado
Ele
a¢ZOa
Q p O W j-�
a}r o yk�3zU3
190
11 'paZo
U J
Qr0
p_ d)
t
kill s