SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
r6 rn
Yg7'3
This Informal Report is in response to the City Council's request to receive a monthly update on
development activity within the City and the measures staff are using to improve the development
process. Staff also generates a monthly report to keep the Council informed of the volume of
development activity, process improvements and staff's performance in implementing changes
and improving the delivery of plan review and permits. This activity report consists of metrics
associated with building permits, infrastructure, stormwater development, and water development
plan review. It provides updates on continuous development process improvement efforts. The
monthly Development Activity report is attached for your use and information.
April 2020 Highlights
Building Permits
• Total commercial valuation (including remodels and additions) for April 2020 was $258
million compared to:
o $262 million in March 2020, down 2%
o $98 million in April 2019, up 163%
• Total commercial valuation (including remodels and additions) between April 16t" —30t"
was $163 million compared to $95 million between April 1st - 15t", up 72% in the 2nd half
of April 2020.
• In April 2020, 128 new commercial permits were issued compared to:
0 139 new commercial permits issued in March 2020, down 8%
0 65 new commercial permits issued in April 2019, up 97%
• 34 new commercial permits were issued between April 16t" — 30t" compared to 94 new
commercial permits issued between April 1 st— 15t", down 64% in the 2nd half of April
2020.
• 20 new commercial permit applications were received between April 16t" — 30t"
compared to 19 new commercial permit applications received between April 1st— 15t"
up 5% in the 2nd half of April 2020.
• In April 2020, 504 new single-family permits were issued compared to:
0 612 new single-family permits issued in March 2020, down 18%
0 500 new single-family permits issued in April 2019, up 1%
• 254 new single-family permits were issued between April 16t" — 30t" compared to 250
new single-family permits issued between April 1 st— 15t", up 2% in the 2nd half of April
2020.
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 20-10411
To the Mayor and Members of the City Council May 19, 2020
Page 2 of 7
i
i7 Y
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
r6 rn
Yg7'3
• 307 new single-family residential applications were received between April 161h — 301h
compared to 327 new single-family residential applications received between April 1st_
15th, down 6% in the 2nd half of the April 2020.
• 288 new commercial and new single-family permits were issued between April 16th _
31st compared to 344 new commercial and new single-family permits were issued
between April 1 st — 15th, down 16% in the 2nd half of April 2020.
Development Support Services
• The Overall Customer Service Satisfaction was 93% for either Very Positive or
Somewhat Positive for April 2020, compared to 82% in March 2020.
• Chart A shows survey responses for the month of April 2020.
How would you rate the quality of your customer service experience?
90% 8033°k Chart A
.
80%
72.14%
70%
60%
50%
40%
30%
20% 13.11% 13.96k
1 0% on
5.82°Io
328% 3280A 3.33% 3.74%
0% fi fi fi 0.00% _
Very Positive Somewhat Positive Neutral Somewhat Negative Very Negative
■City of Fort Worth Customers
'April 2020 survey results ■SurveyMonkeyGlobal Benchmark
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 20-10411
To the Mayor and Members of the City Council May 19, 2020
Page 3 of 7
i
i7 Y
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
r6 rn
Yg7'3
• Chart B shows commercial vs residential survey responses for the month of April 2020.
Overall, how would you rate the quality of your customer
service experience?
100%
90% 86.61% Chart B
,So% 74.19% 72.14%
70%
60%
50%
40%
30%
20% 16.13% 13.96%
0. 3
00% 3.23% 6.82%
.33%
10% W ■ — 6 3
- 3.74
O.0046 i 0.001A 0 00%
Very Positive Somewhat Positive Neutral Somewhat Negtive Very Negative
City of Fort Worth Customers(Commercial)
■CityofFort Worth Customers(Residential)
SurveyMonkey Global Benchmark
'April 2020 survey results
• In April 2020, a total of 100% of our customers surveyed thought that our Inspections
team was extremely helpful or very helpful compared to 83% in March 2020.
X-Team Building Plan Review
1 1WAS •
January 10 11 17
February 11 10 24
March 6 1 27
April 3 0 2
YTD 2020 TOTAL: 30 22 70
CY 2019 TOTAL: 88 70 106
GROSS:I 118 92 176
• As of April 30, there are 52 pending X-Team building permits.
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 20-10411
To the Mayor and Members of the City Council May 19, 2020
Page 4 of 7
i
i7 Y
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
r6 rn
Yg7'3
Building Plan Review
• On April 16, 2020 review times were as follows:
Days to first review Commercial Plans Actual 5 Days Goal 7 Days
Days to first review Residential Plans Actual 1 Days Goal 7 Days
• All departmental reviews time to first comment were as follows:
Commercial Plans 6 Days
Residential Plans 5 Days
New Commercial Building Permits
BPI Project Annual Report Current Month
May2017-Apr.2018 CY 2019 Mar.2020
Total Time:from opened date to issued permit 96 days 64 days 120 days
City Time 63 days 31 days 51 days
Customer Time 33 days 33 days 69 days
Average Time to First Review 38 days 15 days 26 days
Total Number of Permits 60 76 8
New Residential Building Permits
Annual Report Current Month
CY 2019 Mar.2020
Total Time:from opened date to issued permit 31 days 34 days
City Time 19 days 14 days
Customer Time 12 days 20 days
Average Time to First Review 11 days 8 days
Total Number of Permits 394 69
*Data is reported in average business days and excludes the miscellaneous permits that are included in the building plan review
section above. Miscellaneous permits are as follows:pools, spas,retaining walls,foundations,temporary construction, and
fences. Additionally,the data excluded walk-in permits and third-party review permits.
• City time for new commercial building permits issued during this reporting period was
51 days compared to:
0 63 days in the BPI Project, down 12 days
0 31 days in the CY 2019 Annual Report, up 20 days
• Average time to complete first review for new commercial building permits issued
during this reporting period was 26 days compared to:
0 38 days in the BPI Project, down 12 days
0 15 days in the CY 2019 Annual Report, up 11 days
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 20-10411
To the Mayor and Members of the City Council May 19, 2020
Page 5 of 7
i
i7 Y
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
r6 rn
Yg7'3
• City time for new residential building permits during the Current Month was 14 days
compared to 19 days in the CY 2019 Annual Report, down 5 days.
• Average time to complete first review for new residential building permits during the
Current Month was 8 days compared to 11 days in the CY 2019 Annual Report, down 3
days.
Plat/ Infrastructure Plan Review
• Infrastructure Plan Review Center (IPRC) reviewed 100% of the plans submitted within
the 14-day goal timeframe in the month of April 2020.
• 5 CFA applications were received between April 16t" — 30t" compared to 7 CFA
applications between April 1 st— 15t", down 29% in the 2nd half of April 2020.
• 12 Plat applications were received between April 16t" — 30t" compared to 15 Plat
applications between April 1 st— 15t", down 20% in the 2nd half of April 2020.
Response to COVID-19 Pandemic
• In our efforts to reduce the risk to staff and our development partners due to the
COVID-19 pandemic, the Development Services Department has made all required
applications/permits available online. In addition, we have added the Tarrant County
Game Room permit, Easement Application and the Transportation Impact Fee Credit
Agreement to Accela.
• Most inspection services remain the same, with the exception that staff has begun
performing live video inspections for certain permit types. The process has been
effective so far.
• The Development Services department continues to work with a team that includes IT
Solutions, Law, the City Secretary, and Communications departments to host monthly
virtual board and commission meetings. Special recognition to Sevanne Steiner in the
Development Services department, Melinda Ramos and Tyler Wallach in the City
Attorney's Office, Donna Ackerman and Sallie Trotter in the IT Solutions department,
and Jack McGhee and Andrea Duffie in the Communications department as well as all
the staff whose diligent and expeditious work made this happen during these
challenging times.
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 20-10411
To the Mayor and Members of the City Council May 19, 2020
Page 6 of 7
i
i7 Y
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
r6 rn
Yg7'3
Public participation has been active at these virtual meetings. In addition to viewing on
WebEx Events, the meetings were broadcast on the City's cable channel and streamed
on the City's website "live" on the day of the meeting. Recordings of the meetings are
provided on the City's website after the meeting for the public to view at their
convenience.
o Downtown Design Review Board meeting (April 17tn)
o City Plan Commission meeting (April 22nd)
o Development Advisory Committee meeting (April 23rd)
o Urban Design Commission meeting (April 23rd)
o Downtown Design Review Board special called meeting (May 8tn)
o Historic & Cultural Landmarks Commission meeting (May 11tn)
o Zoning Commission Meeting (May 13tn)
Both the residential and commercial Boards of Adjustment are scheduled for May 20,
2020. Staff plans to continue hosting virtual public meetings as long as necessary.
• Two categories of development-related fees have been added into Accela, which
previously required separate payment processes. Work continues to add more
development fees that cannot currently be paid through Accela. The added fees include:
o All Park fees for the Park and Recreation Department
o All Water Development fees for the Water Department
• The Development Services Department continues to work with both internal and
external stakeholders to move as many services as possible onto digital platforms to
provide consistent availability to the public and exceptional customer service. Staff has
received training on all of the newly offered online services, and are still exploring more
innovative avenues to continually improve service delivery. Other items being
researched include electronic signing of infrastructure plans and agreements with
counties.
• The Development Services Department has started releasing articles regarding the
status of City operations such as procedures for businesses reopening and the option
to use the X-Team for expedited plan review. The Department plans to continue
posting the articles on the City's website, as well as social media outlets (Facebook
and Twitter), to keep customers updated. Another key improvement in work will be
video tutorials for the citizens to better navigate our online system when determining
what is needed to apply for a permit, how to apply for a permit, registering, and basic
navigation of ACA.
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 20-10411
To the Mayor and Members of the City Council May 19, 2020
Page 7 of 7
i
i7 Y
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
r6 rn
Yg7'3
• Development Services Department is assisting businesses who decide to re-open their
establishment. Businesses are not required to obtain a new certificate of occupancy or
health inspection before re-opening if the owner and/or tenant will remain the same. If a
business' power is or was shut off during the pandemic, a new electrical inspection or
release may be required in order to resume business. This was communicated to
business owners through the following social media outlets: Facebook, Twitter, and
City News.
Please contact D.J. Harrell, Development Services Director, at 817-392-8032 or
Dalton.Harrel l(a)fortworthtexas.gov if you have any questions, concerns or comments.
David Cooke
City Manager
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
FORT WORTH®
Development
0 0
Activity Report
APRIL 2020
INSIDE THIS EDITION BUILDING PERMITS....................................................2-s
INFRASTRUCTURE....................................................9-12
STORMWATER........................................................ 13-14
WATER..............................................................................15
DEVELOPMENT PROCESS IMPROVEMENTS........16
BUILDING PERMITS
New Single Family Permits
700
600
500 I
400
300
200
100
0 '
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2016 204 151 290 379 277 435 323 262 268 281 239 341
■2017 268 326 594 391 475 497 412 419 317 248 567 341
■2018 583 492 428 479 440 288 319 567 543 545 581 454
■2019 396 415 468 500 388 385 417 504 491 326 328 557
■2020 575 526 612 504
All data is in calendar year • • Ist Otr 2020 1713 33.9% Increase
New Commercial Permits
200
180
160
140
120
100
80 -
60
40
20
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2016 92 82 72 80 67 166 105 103 82 90 104 75
■2017 106 71 100 99 77 76 83 116 62 96 51 54
■2018 94 70 74 101 81 70 52 76 38 142 60 37
■2019 66 142 90 65 141 79 80 45 84 100 135 181
■2020 126 120 139 128 1
All data is in calendar year L IstQtr2019 = • • Increase
Development Activity Report
BUILDING PERMITS
Building Permit Comparison
35000 —
30000
25000
20000
15000
10000
5000
0
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
0 Multi-Family Permits 384 486 450 409 349 376 349 803 487 421 451 261
1 Residential Permits 7066 7136 7101 6927 8115 8471 8792 9522 10562 11687 11523 4004
.Commercial Permits 2285 2341 2404 2481 2112 2284 2179 2528 2418 2609 2599 665
J Grand Total 9735 9963 9955 9817 10576 1113:1] 11320 12853 13467 14717 14573 4930
All data is in calendar year
Total Commercial Valuation
$800 — —
$700
$600
$500
o $400
$300
$200
$100
$0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
02016 $79 $164 $491 $167 $75 $182 $164 $185 $85 $111 $205 $101
02017 $209 $727 $249 $118 $518 $198 $134 $203 $282 $144 $193 $125
02018I $650 $126 $165 $26 $158 $257 $91 $255 $62 $177 $156 $103
02019 $103 $208 $230 $98 $311 $269 $221 $121 $392 $421 $588 $242
02020 $214 $440 $262 $258
Ist Qtr 2019Qtr 2020 $916 Million
All data is in calendar year
Development Activity Report 3
BUILDING PERMITS
New Commercial Permits Valuation
$800
$700
$600
$500
o $400
$300
$200
$100
$0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2016 $57 $131 $307 $99 $14 $148 $117 $135 $62 $80 $141 $63
■2017 $131 $702 $218 $87 $355 $152 $73 $175 $215 $114 $97 $74
■2018 $616 $99 $112 $223 $122 $213 $39 $154 $25 $113 $128 $66
■2019 $2 $193 $201 $51 $246 $234 $162 $40 $339 $383 $477 $141
■2020 $167 $282 $204 $155 1
All data is in calendar year
Permit Valuation Comparison
Difference Prev. Difference Y-Y
Category Current Month Prev.Month M-M Year %
, ,
New SF -108 4 5175 2,217
504 612 500
Permits -18% 1% 43%
New SF -$19,137,570 $7,025,585 $937,688,297 $385,508,083
$93,907,396 $113,044,966 $86,881,811
Value -17% 8% 41%
New Comm -11 63 1208 513
128 139 65
Permits -8% 97% 42%
New Comm -$48,529,013 $104,664,838 $2,537,698,790 1 $808,375,323
$155,178,959 $203,707,972 $50,514,121
Value -24% 207% F
32%
Development Activity Report
BUILDING PERMITS
Large Commercial Projects
April Large Commercial Projects
Address Council District Proiect Name Work Description Valuation
NEW ADDITION OF ENTRY VESTIBULE AND CLASSROOMS,REMODEL TO
3001 FOREST PARK BLVD 9 PASCHAL HIGH SCHOOL EXISTING HIGHSCHOOL AND CLASSROOMS $30,735,121
NEW CONSTRUCTION OF 2 STORYSCIENCE LAB AND CLASSROOM,
1411 MAYDELL ST 2 DIAMOND HILL JARVIS HIGH SCHOOL CORE CLASSROOM AND SUPPORT AREA $26,000,000
NEW CONSTRUCTION SHELL WAREHOUSEIINDUSTRIAL
10717 NORTH FWY,BUILDINGS 1-4 7 NORTH QUARTER 35 $22,862,925
NEW CONSTRUCTION,4 STORY,MULTIFAMILY SENIOR LIVING
5777 OAKLEYAVE 7 GREYSTAR GOLDEN TRIANGLE MID MARKET $22,503,000
REMODEL OF SELECT AREAS TO EXISTING BUILDING AND NEW
4100 ALTAMESA BLVD 6 FWISD-SOUTHWEST HIGH SCHOOL ADDITION OF COLLABORATION SPACE WITH COURTYARD $21,650,000
REMODEL OF EXISTING DATA CENTER
14100 PARK VISTA BLVD 7 QTS FTW1-TRIDENT $10,000,000
SENIOR LIVING RETAIL AND COMMERCIAL
1801 8TH AVE 9 EVERLY PLAZA LLC $8,900,000
NEW ADDITION AND RENOVATION OF A 15 ROOM SECTION AND
6701 OAKMONT BLVD 6 ENCOMPASS HEALTH CITYVIEW EMERGENCY GENERATOR IN EXISTING REHABILITATION HOSPITAL $7,086,973
NEW CHILDRENS ADDITION,2 STORYTO EXISTING BUILDING
9915 RAY WHITE RD 7 HILLSIDE COMMUNITY CHURCH $6,300,000
NEW CONSTRUCTION OF GOLF COURSE CLUBHOUSE AND DEMO OLD
1851 JACKSBORO HWY 2 ROCKWOOD GOLF COURSE CLUBHOUSE $5,500,000
NEW VETINARY CLINIC,2 STORY METAL BUILDING,WITH SALLY PORT,
355 HILLSHIRE DR 7 CITYOF FORT WORTH ANIMAL CARE AND ADOPTION OFFICES,CANINE HOUSING AND RETAINING WALL $4,941,760
NEW ADDTION TO SCHOOL
3038 SHELBYRD 8 CHARLES BAXTER JUNIOR HIGH SCHOOL $4,000,000
CITYOF FORT WORTH PARK MAINTENANCE NEW STAGING AND STORAGE BUILDING#5/EXEMPT FROM FEES CITY
5189 JAMES AVE UNIT#5 9 FACILITY OWNED AND OPERATED $3,624,644
COMPLETE RENOVATION OF MEN'S SHELTER
2400 CYPRESS ST 8 PRESBYTERIAN NIGHT SHELTER $3,100,000
NEW MULTIFAMILY DEVELOPMENT,300 UNITS
5768 CHARRO DR 7 ELAN GOLDEN TRIANGLE $3,034,910
NEW ADDITION OF OR AND RAMP
1800 PARK PLACE AVE 9 BAYLOR SCOTT AND WHITE $3,017,895
BUILDING DEMO AND SITE UTILITY WORK
1300 CONNER AVE 8 FWISD-POLYTECHNIC HIGH SCHOOL $2,018,310
5709 IL GOLDEN TRIANGLE BLVD, NEW CONSTRUCTION OF RETA SHELL BUILDING
BUILDING 1 7 GOLDEN TRIANGLE RETAIL $1,961,000
NEW CONSTRUCTION OF A WHATABURGER
3052 GOLDEN TRIANGLE BLVD 4 WHATABURGER-GOLDEN TRIANGLE $1,299,386
NEW CONSTRUCTION OF VALVOLINE INSTANT OIL CHANGE
9313 NORTH FWY 7 VALVOLINE INSTANT OIL CHANGE $1,200,000
NEW CONSTRUCTION TOWNHOMES
307 SUNSET LN 7 PARKLANDTOWNHOMES $1,008,526
REMODEL TO EXISTING TELECOM DATA STORAGE
1601 JONES ST 9 CENTURYLINK $1,000,000
Development Activity Report
BUILDING PERMITS
CY 20 Q1 New Commercial Permits Heat Map
�g
❑�
o,
r
r
O
ll C�
r � 4
0
� 80
1
I � I • .
Legend
CY 20 Q1 New Commercial Permits Per
Sq Mile
OO-1
O1 -2
=2-3
�3-4
OCFW CITY LIMIT
Development Activity Report
BUILDING PERMITS
CY 20 Q1 New Residential Permits Heat Map
t
o �
o
r
• ' o
• ,o � r o
111 • o� �.
O O a O
•
O
Legend
•
• CY 20 Q1 New Residential Permits Per Sq Mile
• QO-5
Q 5-10
�10-15
�15-20
20-25
• Residential Permits Jan 20-Mar 20
-CFW CITY LIMIT
Development Activity Report
INFRASTRUCTURE
I PRC Overview
Cycle Complete 52 52 52 14
Total Projects 170 148 181 36
Avg. Project Total Per Cycle 3.27 2.85 3.48 2.57
Total Accepted Projects 156 139 143 31
Plan Rev. & Ret w/n 14 days 95% 98% 94% 94%
*All data is in calendar year
IPRC Quarterly Details
Q3 2019 •4 2019 • 1 2020 •
Cycles 13 13 14 5
Total Projects 57 41 36 17
Avg. Projects Per Cycle 4.38 3. 15 2.57 3.40
Avg. Accepted Projects Per Cycle 2.541 3. 101 2.201 1 .72
Plan Rev. & Ret w/n 14 days 93%1 100% 100% 88%
*All data is in calendar year
Development Activity Report
INFRASTRUCTURE
CFA Project Overview
$40.0
$35.0
$30.0
$25.0
0
° $20.0
$15.0 -
$10.0 -
$5.0 -
$0.0
Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec
■2017 $20.8 $20.0 $18.3 $9.2 $1 1.3 $12.4 $18.0 $35.2 $34.7 $24.0 $1 1.2 $24.0
02018 $5.9 $24.2 $13.8 $14.5 $9.9 $23.0 $17.0 $19.8 $16.3 $16.9 $71 $17.0
■2019 $19.4 $10.4 $25.6 $36.4 $5.7 $18.4 $23.9 $35.0 $8.3 $14.4 $3.8 $1.5
■2020 $8.0 $6.0 $17.4 $6.0
2018 Total $185.4 M 201 2
All data is in calendar year
Public Infrastructure Residential Projects
$35.0
$30.0
$25.0
$20.0
0
0
_ $15.0
$10.0
$0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
02017 $7.6 $14.3 $12.7 $5.8 $0.9 $11.6 $17.6 $29.6 $13.2 $15.0 $4.4 $12.0
12018 $4.7 $22.2 $11.8 $12.4 $3.4 $14.3 $14.6 $17.9 $11.2 $4.5 $1.3 $3.8
02019 $14.0 $7.1 $21.4 $24.4 $3.7 $14.5 $21.0 $23.4 $4.5 $12.9 $2.7 $0.9
■2020 $7.1 $0.9 $7.6 $5.3
2018 Total$122.2 M 2019
All data is in calendar year
Development Activity Report
INFRASTRUCTURE
Public Infrastructure Commercial Projects
$14.0
$12.0
$10.0
$8.0
0
$6.0
$4.0
$2.0 LL6 IL ji
$ Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
.2017 $9.2 $3.5 $5.3 $2.1 $1.9 $0.6 $0.2 $2.8 $11.2 $1.0 $6.3 $12.0
2018 $0.9 $0.9 $0.8 $2.0 $3.1 $1.5 $0.8 $0.7 $4.7 $6.0 $4.7 $10.7
■2019 $3.7 $0.8 $3.3 $7.5 $0.8 $2.3 $2.9 $4.0 $3.2 $1.5 $0.1 $-
■2020 $0.9 $0.5 $3.3 $0.31
2018 Total
All data is in calendar year
Public Infrastructure Industrial Projects
$4.5
$4.0
$3.5
$3.0
$2.5
0
$2.0
$1.5
$1.0
$0.5
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2017 $4.0 $ $ $ $ $- $- $0.3 $- $- $- $-
■2018 $- $- $- $- $- $0.1 $- $0.2 $3.6 $- $- $-
■2019 $- $- $- $- $- $1.2 $- $- $0.5 $- $0.9 $0.5
2020 $0.4 $3.6 $3.4 $-
2018 Total $3.9 M
All data is in calendar year
Development Activity Report
INFRASTRUCTURE
Public Infrastructure Multi-Family Projects
$8.0
$7.0
$6.0
$5.0
$4.0
$3.0
$2.0
$1.0
$ �- _ 1 ■
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2017 $- $- $- $1.19 $- $0.32 $0.21 $- $- $- $- $0.21
■2018 $0.24 $0.13 $- $- $3.33 $5.24 $1.57 $0.05 $0.40 $- $- $2.63
■2019 $0.70 $- $0.88 $4.40 $1.21 $0.26 $- $7.18 $- $- $- $-
i■2020 $0.11 $0.93 $0.70 $0.39
F2018 Total$13.6 M [2019 Tota M F2020 Total$2.1 M 1
All data is in calendar year l
Public Infrastructure Institutional Projects
$8.00
$7.00
$6.00
$5.00 -
N
G
$4.00
$3.00
$2.00
$1.00 � � � -
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
02017 $- $2.25 $- $0.17 $- $- $- $2.46 $- $7.00 $0.51 $0.12
■2018 $0.06 $0.92 $1.18 $0.11 $- $1.92 $0.10 $0.91 $- $2.65 $1.13 $-
■2019 $0.98 $2.60 $- $0.13 $- $0.15 $- $0.43 $- $- $- $-
■2020 $0.60 $- $2.40 $-
2018 Total $9.0 M 2019 Total $4.3 M 2020 Total $3.0 M
All data is in calendar year
Development Activity Report
STORMWATER
Stormwater Review Performance
Stormwater - - -
Avg. Review Time (days) 7.1 6.5 6.29
Num. Review Completed 1,567 317 121
% completed in 10 business days or less 92.0 98.4 98.3
Avg. PiSWM Review Iterations (City) 2.6 0.0 4.3
Avg. FiSWM Review Iterations (City) 3.1 4.3 4.3
Avg. IPRC Review Iterations (City) 3.2 2.4 2.9
Avg. SWMP Review Iterations (City)* 1.6 2.3 2.2
Avg. Drainage Studies Iterations (City)* 0.0 0.0 0.0
Overall Customer Satisfaction Rating (1-5 scale) 4.6 4.9 4.8
Num. of Surveys Taken 64 17 8
* New item tracked as a result of HB 3167
New Stormwater Submissions
3
40
30
20
10
0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■2018 41 42 54 48 76 71 42 48 47 54 65 42
J2019 42 38 57 48 20 38 45 43 28 11 21 40
■2020 47 36 34 41
All data is in calendar year
Development Activity Report
STORMWATER
Stormwater Pipeline Snapshot
250
200
150
100
50
0
Reviews in process Reviews with City
■Nov'19 185 22
■Dec'19 209 32
■Jan'20 218 38
■Feb '20 222 37
■Mar'20 221 40
■Apr'20 216 21
250
200
150
100
50
0
Avg. age of Reviews with City Avg. age of Reviews with Dev,
(Days) (Days)
■Nov'19 3 184
■Dec'19 8 179
■Jan '20 5 183
■Feb '20 3 187
■Mar'20 3 203
■Apr'20 5 200
Development Activity Report
1 �
Newly Submitted Water/Sewer Studies
Water D- .
Newly Submitted Water Studies 12 10 10 16 14
Water Studies Approved * 7 6 8 13 13
Total Submittals & Resubmittals 11 10 16 27 35
Av . Water StudV C cle 1.6 1.7 2.0 2. 1 2.7
Sewer D- • - • •
Newly Submitted Sewer Studies 10 10 10 17 14
Sewer Studies Approved * 6 6 9 16 12
Total Submittals & Resubmittals 8 10 20 31 24
Avg. Sewer Study Cycle 1.3 1.7 2.2 1 1.9 L2.0
* A study can be submitted multiple times prior to the reported month before being approved
Submitted Water/Sewer Studies
Water D- • 1 - . 1 1 ` . 1
Water Study Reviews in Process 11 14 15 12 1 17
Water Study Reviews in Process with City 1 3 10 6 10
Water Study Reviews in Process with Owner 10 11 5 6 7
Avg. Water Study Reviews in Process with City(Days) 5.0 3.0 7.3 5.2 6.9
Avg. Water Study Review in Process with Owner (Days) 10.3 3.0 7.3 5.6 14.9
Sewer D- • D- • - • 1 1 ` • 1
Sewer Study Reviews in Process 10 15 16 14 19
Sewer Study Reviews in Process with City 2 2 7 6 10
Sewer Study Reviews in Process with Owner 8 13 9 8 9
Avg. Sewer Study Reviews in Process with City(Days) 4.8 3.0 5.5 7.9 8.6
Avg. Sewer Study Review in Process with Owner (Days) 8.0 3.0 5.0 11.7 18.2
Development Activity Report
DEVELOPMENTPROCESS IMPROVEMENTS
DevelopmentActive
Accela Automation/Website/Technology Improvements(I in progress)
As of April 2020
Task Department/Staff Assigned
Staff worked with consultant on making final
Create shared database for CFAs,IPRC,inspections and updates to IPRC,CIA,and construction records
closeout for developer-led infrastructure projects. Development Services,TPW,ITS as well as worked on reports. All tasks on Phase I
have been completed.The project is expected to
be completed by the end of May 2020.
Permitting Review(I in progress)
Department/St S
On April 23 staff provided DAC with an update on
BPI recommendations. 33 primary tasks have
Complete lean process evaluation for commercial Development Services-Allison Gray,Rochell Thompson, been identified,of those 16 are completed, 10
building permits. D.J.Harrell ongoing and 7 are pending.Next steps include
video tutorials for online permitting and revised
plan review deficiency letters.
Development Process Tree(1 in progress)
Department/Staff Assigned94
To update and publish the process trees for each of our
alliance partners that have had changes in their Draft for Development tree was sent to
respective process as a result of H.B.3167. This will departments for review.Departments have
allow for citizens to have a clear,transparent and Development Services,Water,and TPW returned their reviews and revisions are ongoing.
predictable review process for each of the review Expected completion date is the end of June 2020.
submittal process.
Parks and Recreation Department(1 in progress)
Department/Staff Assigned
To streamline and improve the PARD Staff will meet with internal stakeholders next
Dedication/Conversion Policy by improving process week to discuss proposal and obtain feedback.
flows and decreasing total processing time. Development Services,PARD&TPW Once this is complete,DAC will be updated on
the proposed changes.Project is expected to be
completed by the end of June 2020.
Tarrant County Interlocal Agreement (1 in progress)
Department/Staff Assigned
Update the 200E Inter Local Agreement with Tarrant Tarrant County will be ready for a discussion on
County regarding plat approval jurisdiction in the City of Development Services,TPW,and Legal updating the ILA after its Subdivision Ordinance
fort Worth's ETJ.
has been updated.
School Site Development Guide(l in progress)Assigned
To provide ISDs,Charter Schools,and Private Schools In Light of Covid-19 staff has been providing
with a guide to developing a school site in the City of Fort support to the department during the health
Worth. The guide will offer directions and insight for Development Services,Fire,Water,TPW,and Neighborhood emergency declaration,the completion of the
new school constructions,expansions/additions,and Services draft of the guide has been moved to end of May
remodels. 2020.
Water&Sewer Department(1 in progress)
Department/Staff Assigned
Completed lean process improvement evaluation for The In-House Design Group and ITS will revisit
misc.projects. After discussing results with Water Dept.-Lawrence Hamilton and Homer Garza the lean process improvement evaluation for the
management,the process improvement has been misc.projects during May-June 2020 and will
expanded to include payment process for misc.projects. consider all options for implementations.
Development Activity Report 15
CONTACT INFORMATION
D.J. Harrell, Director
Development Services Department
817-392-8032
Dalton.Harrell@fortworthtexas.gov
Building Permits
Allison Gray,Assistant Director
Development Services Department
Development Building Division
817-392-8030
Allison.Gray@fortworthtexas.gov
Infrastructure
Victor Tornero, IPRC Engineering Manager
Development Services Department
Infrastructure Development Division
817-392-7830
Victor.Tornero@fortworthtexas.gov
Stormwater
Tyson Thompson,Assistant Director
Development Services Department
Infrastructure Development Division
817-392-2120
Tyson.Thompson@fortworthtexas.gov
Water
Chris Harder, Director
Water Department
817-392-5020
Christopher.Harder@fortworthtexas.gov
Report produced by the
City of Fort Worth Development Services Department - Development Project Facilitation Office