Loading...
HomeMy WebLinkAboutContract 41240-A2 A AMENDMENT NO. 2 TO AGREEMENT FOR ARCHITECTURAL DESIGN SERVICES EAST MULTI-PURPOSE FACILITY AT THE WILL ROGERS MEMORIAL CENTER STATE OF TEXAS COUNTY OF TARRANT CITY SECRETARY CONTRACT NO. -_ Z-- WHEREAS, The City of Fort Worth and Brinkley Sargent Architects (Architect) made and entered into City Secretary Contract No. 41240 (The Contract)which was authorized by the City Council by M&C C-24630, the 15th day of December, 2010; and Amendment No. 1 was authorized in the amount of$75,000 by M&C C-25128 dated August 23, 2011 for the additional design services to add a gymnasium made possible with a grant from Texas Parks and Wildlife; and WHEREAS, further amendment is necessary to reimburse the Architect as part of the design services agreement for additional design services for integration of the public art. NOW THEREFORE, city and Architect, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article 1.1, SECTION I — SERVICES OF THE ARCHITECT, the following paragraphs are added to read as follows: Provide additional design services for the design and detailing of additional structural reinforcing of the roof top screen wall. The cost of this additional service is $3,200.00 plus $0.00 in reimbursable expenses. The scope of services is described more fully in the Brinkley Sargent Architects AIA Document G802-2007 dated May 8, 2012, subject: Amendment Number 002 which is attached hereto as Attachment"A"and made a part of this Agreement." 2. Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows: "The total compensation for all of the assignments to be performed by Architect as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES hereof shall be a fixed fee of $365,196 plus up to$30,000.00 in reimbursable expenses. " 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. (The remainder of this page is intentionally left blank.) OFF 1C1AL RpcoRD CITY SECRETARY 0;_}_2 1 -12 P 0 5 : 3 2 IN FT,WORTH9"TIC �- r� EXECUTED this the day of , 2012, in Fort worth, Tarrant County,Texas. Brinkley Sargent Archite APPROVED: By: VM By: Dwayne 130 ley Fernando Costa President Assistant City Manager APPROVAL CaMMENDED: RECORDED: IF rid By y ;Q&00na000a [ Douglas)$.weirsig, Director ary..1. ayser A' ov ao Transportation&Public Works Xpartment Cit Secreta P y ry v 0 o a o� APPROVED A F RM AND LEGALITY: M&C�Nt,eQ u fired ° � a om0 4 0 o Id Contract Authorization °� a "�`�' By: °000a 00 0 o .c Ay Douglas W. Black AS 4 Assistant City Attorney - . . ,._ .. .. F CIAL RECORD SECRETARY WORTH, TX AIA Document G802 2007 H Amendment to the Professional Services Agreement Amendment Number:002 Td:Ronnie Clements Date: 518112 (Chewer of 0ivner's Representative) In-accordance with the Agreement dated:December 15,2410 BETWEEN the Owner: (Name and address) The City of Fort worth 401 West 13'h Street Fort worth,Texas 76102 and the Architect: (Name and address) Brinkley Sargent Architects 5000 Quorum Drive,Suite 604 Dallas,Texas 75254 for,the Project: (Nahie and address) Fort Worth Far Southwest Community Center Chisolm Community Center Authorization is requested ®to proceed with Additional Services. ❑to incur additional Reimbursable Expenses. As follows: Modification of structure to facilitate the hanging of the art piece. The following adjustments shall be made to compensation and time_ (insert provisions in accordance ivith the Agreement, or as otherwise agreed by the parties.) Compensation: raster Quintanilla-Structral Engineering Modifications $2,000.00 Brinkley Sargent Architects-Coordination& Modification of building sections and details $1,200.40 Total Additional Service $3,240.40 Time: NIA AIA Document G802T"—2007(formerly G606'""—2000).Copyright 0 2000 and 2007 by The American Institute at Architects.All rights reserved.WARM NG: This Ale Document Is protecU d by V.S.Copyright Law and Internatlonal Treaties.Unauthorised reproduction or distribution of this Ale Document, ►� or any portion of It,may result In severe civil and criminal penalties,and will be prosecuted to the maximum extent passible under the law.This document was produced byAlA software at 49:08:49 on 05108!20"12 under Order No.089258819d i which expires on at/4412013,and Is not for resale. User Motes: (2020694371) t SUBMUED BY: AGREED TO: (sign ur (Signature) E�wayna M.Brinklg,AIA,Principal (Printe na a and title) (Printed name and title) 45/ro iZ (Daft) (Date) AIA Document G802 2007(formerly G606 TO—2DO01.Copyright 472000 and 2007 by The American Institute of Architects.All rights reserved.WARNING: This A10 Document Is protected by U.S.Copyright Law and International Treaties.unauthorised reproduction or distribution of this Ale document* Z or any portion of it,msy result in severe civit and criminal pen atties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA softwere at 09:48:49 on 05/08/2012 under drder No.D89258819C t which expires on 4110412013,and is not for resale. User Notes: t 202069437 1)