Loading...
HomeMy WebLinkAboutIR 8782INFORMAL REPORT TO CITY COUNCIL MEMBERS NO. 8782 AIL G�pRTEq� To the Mayor and Members of the City Council June 13, 2006 Page 1 of 1 � s rFx� SUBJECT: Emergency Construction Contract to Repair the 1673 John Justin Parking Garage, Will Rogers Memorial Center The purpose of this Informal Report is to inform Council of staff's plan to execute an emergency construction contract with Sedalco Construction Services to repair the John Justin Parking Garage at the Richardson -Bass Building, the Will Rogers Memorial Center. Staff anticipates the contract will be more than $25,000. In January 2006 cracks were discovered in the concrete support I -beams of the John Justin Parking Garage which was built in the 1986 -87 timeframe. Based on staff inspection and safety concerns, staff contracted with a firm to shore the concrete beams with scaffolding on a temporary basis. Huitt - Zollars, Inc. was contracted via the City's open -ended annual architectural services agreement, to conduct on -site investigations and provide corrective recommendations. Sedalco Construction Services, who was on -site doing other work and had done some work on this garage years ago, was contracted to assist Huitt - Zollars by excavating the foundation and is removing brick veneer and concrete slab areas. Huitt - Zollars recommended that the affected areas be barricaded immediately to prevent patrons from parking in these areas. The barricades blocked off 20 parking spaces on each floor. The Huitt - Zollars' report described serious structural issues including: rotation of the bearing wall; signs of web, flange, and bearing failure; and loosening, spalling, and failing of the embedded plates for the double tees. Huitt - Zollars was contracted to do the required design work. This project should be exempt from the competitive bid requirements pursuant to Local Government Code §252.022, and authorized by AR C -9 as a procurement necessary due to unforeseen damage to public property. Staff intends to execute an emergency construction contract with Sedalco Construction Services as soon as agreement is reached on the contract scope, schedule, and price. An M &C requesting Council to ratify the emergency construction contract will follow immediately thereafter. Questions can be directed to Greg Simmons, Facilities Manager at 392 -7862. Charles R. Boswell City Manager ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS