HomeMy WebLinkAboutOrdinance 6270 ORDINANCE NO,
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF OAK GROVE ROAD
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH TEXAS; DECLARING THE CONTRACT WITH
L. GRIMES AND COMPANY, I31C. FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF
FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with L. GRIMES AND COMPANY, INC. for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and
public places in .said City, to-wit:
OAK GROVE ROAD From Mallick Parkway to 2300 feet South,
known and designated as Unit No. 1,
Project No. 104--36000-225.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City of Fort Worth, Texas, including Ordinance NoAC C-154$ portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. M&C C-1549 a and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOWO THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the-true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on*the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of , 19
APPROVED AS TO FORM AND LEGALITY:
00
-0 /0,44 14
City Attorney
FORT WORTH, TEXAS
19
TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS,
Gentlemen:
In accordance with the proceedings of your Honorable Body, I have prepared
estimates of the cost of street improvements as shown below:
Estimates of the total cost of improvements on a portion of
OAK GROVE ROAD and portions of sundry other streets,
avenues and public places in the City of Fort Worth, Texas, and estimated amounts per
front foot to be assessed against abutting property and the owners thereof, on each
portion of street, avenue and public place are as follows, to-wit:
PROJECT N0. 104-36000-225 UNIT NO. 1: OAK GROVE ROAD FROM MALLICK PARKWAY
TO 2300 FELT SOUTH EAST LANE ONLY to be improved by constructing a seven-
inch thick reinforced concrete pavement on a six-inch thick lime stabilized
subgrade, with seven-inch high concrete curbs and two-foot wide concrete
gutters, so the finished street will consist of one thirty-three foot wide
roadway, and by constructing five-inch thick concrete sidewalk and six-inch
thick concrete driveways where specified.
The following assessment rates have been established:
Seven-inch curb and two-foot gutter.. . .... . .. ...... . ..... .... $ 2.88/L.F.
Seven-inch Reinforced Concrete Pavement (Industrial Zoning).. 19.61/L.F.
Seven-inch Reinforced Concrete Pavement (Residential Zoning). 2.52/L.F.
Five-inch thick concrete sidewalk...... ........... 0 . . .. .. . . .. 3.82/L.F.
Six-inch thick concrete driveways. . .. . ....... . ....... . ....... 1.06/S.F.
The assessments result in the following division of costs:
Total Property Owners' Cost.. ... ...... .. .... ... $ 30,852.85
Total City of Fort Worth Cost..... .... ...... ... 86,126.77
TOTAL CONSTRUCTION COST $116,979.62
PROJECT NO. 104-36000-225, UNIT NO. 1; OAK GROVE ROAD FROM MALLICK PARKWAY
TO 2300 FEET SOUTH EAST LANE ONLY), to be improved by constructing a seven-
inch thick reinforced concrete pavement on a six-inch thick lime stabilized
subgrade, with seven-inch high concrete curbs and two-foot wide concrete
gutters, so the finished street will consist of one thirty-three foot wide
roadway, and by constructing five-inch thick concrete sidewalk and six-inch
thick concrete driveways where specified.
BLACK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE INTERSECTION OF OAK GROVE ROAD AND MALLICK PARKWAY
EAST SIDE OF STREET ONLY SHELBY COUNTY SCHOOL LAND SURVEY
G. A. Mallick, Inc. Tract 5 713' Adjusted to
500 West Fifth Street Ind. 668' Pavement $19.61 $13,491.68
Fort Worth, Texas 76102 686' Curb & Gutter 2.88 1,981.44
688' Sidewalk 3.82 2,628.16
$18,101.28
Everman Independent 1 1373.5' Pavement $2.52 $ 3,461.22
School District Res. 1373.5' Curb & Gutter 2.88 3,955.68
Everman, Texas 76140 1353.5' Sidewalk 3.82 5,170.37
155 Sq. Ft. Drive 1.06 164.30
$12,751.57
TOTAL PROPERTY OWNERS' COST (ASSESSMENTS) $ 30,852.85
TOTAL CITY OF FORT WORTH COST 86,1-26.77
TOTAL CONSTRUCTION COST $116,979.62
City of Fort Worth, Texas
*A Mayor and Council Communication
UNE
MORPFM9
DATE REFERENCE su'""- Final Payment - Oak Grove Road PAGE
R.68. from Mallick Parkway to 2300 Feet South Iof 2
3 30 70 FP-702
GRAKAM
✓ Final City Council action on the project described below is requested.
Project Description
Name: Oak Grove Road from Mallick Parkway to 2300 Feet
South, Project No. 104-36000-225
Contractor: L. Grimes and Company, Incorporated
Contract Awarded: August 25, 1969 (M&C C-1549)
Work Order Issued: September 30, 1969
Work Order Effective: October 9, 1969
Date of Final Inspection
and Approval: February 28, 1970
Working Time Bid: 60 Working Days
Working Time Used: 51 Working Days
Project Cost and Financing
Original Bid Price: $102,24 M5
Change Order No. 1: $ + 336.00 (A.R. 1-15., Sec.2.3.1; 1/26/70)
Revised Contract Price: $102,57M5
Final Contract Cost: $106,345.11
Partial Payments Previously made: 5 Amount: $92,189.31
Final Payment Due: $14,155�80
Payment to be made from Project Account No. 104-36000-225
Deviation from Bid Price: An over-run of $3,765.56 occurred because of
variations between quantities estimated in the contract documents and
quantities measured and used at the job site.
Compliance With Specifications
During testing on this project, 18 corings were made with the following
results:
Exceeds Even With Under Specs But Below
S2ecs Specs Within Tolerance Tolerance
Paving ' 10 6 2 . 0
Subgrade 0 18 0 0
On the entire project, the average thickness of the concrete paving is
7.19 inches as compared to the seven inches specified, and the average
thickness of the lime stabilized subgrade is six inches as was specified.
Tests made during construction show that materials used were in compliance
with contract specifications.
DATE REFERENCE SUBJECT: Final Payment - Oak Grove Road PAGE
NUMBER from Mallick Parkway to 2300 Feet South 2 2
3/30/70 FP-702 °'
Recommendation
It is recommended that the project described above be accepted as complete
by the adoption of an ordinance and that final payment of $14,155.80 be
authorized to L. Grimes and Company, Incorporated.