HomeMy WebLinkAboutContract 48970-FP2 City Secretary 48970 -FP2
Contract No.
FORTWORTH., Date Received May 26,2020
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: W&S, D&P, Improvements to Serve HCA Medical Center
City Project No.: 100790
Improvement Type(s): Water ® Sewer
Original Contract Price: $88,606.00
Amount of Approved Change Order(s):
Revised Contract Amount:
Total Cost of Work Complete: $88,606.00
C�Vdo# May 26,2020
Carson Collier(May 26,2020 07:42 CDT)
Contractor Date
Project Manager
Title
North Texas Contracting, Inc.
Company Name
4)Lk;m;i: May 26,2020
Mark cRa in(May 26,202007:46 CDT)
Project Inspector Date
Aaron Lang Ma 26 2020
Aaron Long(May 2,202008:10 CDT) Y f
Project Manager Date
Zaz� Zx"Ae-�' May 26,2020
Laurie Lewis(May 26,2020 09:48 CDT)
CFA Manager Date
Zing X9yi dW-1
Dana Burghdoff(M y26,202 0:08 CDT) May26,2020
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name:W&S, D&P, Improvements to Serve HCA Medical Center
City Project No.: 100790
City's Attachments
Final Pay Estimate
Change Order(s): ❑ Yes ® N/A
Pipe Report: ® Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 120 CD Days Charged: 732
Work Start Date: 5/8/2017 Work Complete Date: 1/4/2019
Page 2of2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name WATER,SS,DRAINAGE&PAVING IMPROV TO SERVE HCA PLAZA M
Contract Limits
Project Type WATER&SEWER
City Project Numbers 100790
DOE Number 1007
Estimate Number 1 Payment Number 1 For Period Ending 1/23/2019
CD
City Secretary Contract Number 110790 Contract Time 12(ED
Contract Date 3/16/2017 Days Charged to Date 732
Project Manager NA Contract is 100.00 Complete
Contractor NORTH TEXAS CONTRACTING,INC.
P.O.BOX 468
KELLER, TX 76244
Inspectors RODGERS / MCFADIN
Thursday,May 7,2020 Page 1 of 5
City Project Numbers 100790 DOE Number 1007
Contract Name WATER,SS,DRAINAGE&PAVING IMPROV TO SERVE HCA PLAZA Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 1/23/2019
Project Funding
UNIT L•WATER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 FIRE HYDRANT 1 EA $2,200.00 $2,200.00 1 $2,200.00
2 16"X 6"TAPPING SLEEVE&VALVE 3 EA $2,350.00 $7,050.00 3 $7,050.00
3 16"X 8"TAPPING SLEEVE&VALVE 2 EA $2,850.00 $5,700.00 2 $5,700.00
4 DUCTILE IRON WATER FITTINGS 1 TN $2,000.00 $2,000.00 1 $2,000.00
W/RESTRAINT
5 6"PVC WATER PIPE 80 LF $30.00 $2,400.00 80 $2,400.00
6 8"PVC WATER PIPE 57 LF $35.00 $1,995.00 57 $1,995.00
7 6"WATER METER AND VAULT 2 EA $12,000.00 $24,000.00 2 $24,000.00
8 TRENCH SAFETY 137 LF $1.00 $137.00 137 $137.00
9 TRAFFIC CONTROL 1 MO $1,500.00 $1,500.00 1 $1,500.00
10 ASPHALT PVMT REPAIR BEYOND DEFINED 114 SY $55.00 $6,270.00 114 $6,270.00
WIDTH ARTERIAL
11 6"CONC CURB AND GUTTER 70 LF $20.00 $1,400.00 70 $1,400.00
12 REMOVE CONC CURB&GUTTER 70 LF $12.00 $840.00 70 $840.00
Sub-Total of Previous Unit $55,492.00 $55,492.00
UNIT II:SANITARY SEWER IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
---------------------------------------
1 12"SEWER 69 LF $98.00 $6,762.00 69 $6,762.00
2 20"CASING BY OPEN CUT 69 LF $101.00 $6,969.00 69 $6,969.00
3 6"SDR 26(150 PSI PRESSURE CLASS) 58 LF $37.00 $2,146.00 58 $2,146.00
4 POST-CCTV INSPECTION 127 LF $5.00 $635.00 127 $635.00
5 4'MANHOLE 1 EA $2,000.00 $2,000.00 1 $2,000.00
6 4'EXTRA DEPTH MANHOLE 3.9 VF $250.00 $975.00 3.9 $975.00
7 MANHOLE VACUUM TESTING 1 EA $200.00 $200.00 1 $200.00
8 EPDXY MANHOLE LINER 6 VF $165.00 $990.00 6 $990.00
9 HYDRALIC SLIDE IN EX.MANHOLE 1 EA $750.00 $750.00 1 $750.00
10 6"2-WAY CLEANOUT 2 EA $450.00 $900.00 2 $900.00
11 CONCRETE ENCASE SEWER PIPE 35 LF $25.00 $875.00 35 $875.00
12 TRENCH SAFETY 127 LF $1.00 $127.00 127 $127.00
13 TRAFFIC CONTROL 1 MO $1,500.00 $1,500.00 1 $1,500.00
Thursday,May 7,2020 Page 2 of 5
City Project Numbers 100790 DOE Number 1007
Contract Name WATER,SS,DRAINAGE&PAVING IMPROV TO SERVE HCA PLAZA Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 1/23/2019
Project Funding
14 ASPHALT PVMT REPAIR BEYOND DEFINED 139 SY $55.00 $7,645.00 139 $7,645.00
WIDTH,ARTERIAL
15 6"CONC CURB AND GUTTER 20 LF $20.00 $400.00 20 $400.00
16 REMOVE CONC CURB&GUTTER 20 LF $12.00 $240.00 20 $240.00
--------------------------------------
Sub-Total of Previous Unit $33,114.00 $33,114.00
--------------------------------------
Thursday,May 7,2020 Page 3 of 5
City Project Numbers 100790 DOE Number 1007
Contract Name WATER,SS,DRAINAGE&PAVING IMPROV TO SERVE HCA PLAZA Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 1/23/2019
Project Funding
Contract Information Summary
Original Contract Amount $88,606.00
Chanize Orders
Total Contract Price $88,606.00
Total Cost of Work Completed $88,606.00
Less %Retained $0.00
Net Earned $88,606.00
Earned This Period $88,606.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $88,606.00
Thursday,May 7,2020 Page 4 of 5
City Project Numbers 100790 DOE Number 1007
Contract Name WATER,SS,DRAINAGE&PAVING IMPROV TO SERVE HCA PLAZA Estimate Number 1
Contract Limits Payment Number 1
Project Type WATER&SEWER For Period Ending 1/23/2019
Project Funding
Project Manager NA City Secretary Contract Number 110790
Inspectors RODGERS / MCFADIN Contract Date 3/16/2017
Contractor NORTH TEXAS CONTRACTING,INC. Contract Time 120 CD
P.O.BOX 468 Days Charged to Date 732 CD
KELLER, TX 76244 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
--------------------------------------
Total Cost of Work Completed $88,606.00
Less %Retained $0.00
Net Earned $88,606.00
Earned This Period $88,606.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $88,606.00
Thursday,May 7,2020 Page 5 of 5
.FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: Water,Sewer,Drainage,&Paving to Serve HCA Medical Center Emergency Department
PROJECT NUMBER: CPN 100790
DOE NUMBER:
WATER
PIPE LAID SIZE TYPE OF PIPE LF
8" PVC 57'
6" PVC 80"
FIRE HYDRANTS: VALVES(16"OR LARGER)
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Densities Passed
NEW SERVICES: 2-6" PVC
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
12" PVC 69
SDR 26 6" PVC 58
PIPE ABANDONED SIZE TYPE OF PIPE LF
DENSITIES: Densities Passed
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
2
(817) 392-7941 •Fax: (817) 392-7845