Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ordinance 6981
ORDINANCE NO. AN ORDINANCE DETERMINING THE NECESSITY FOR AND ORDERING AND $ROVIDING FOR THE IMPROVEMENT OF A PORTION OF POINSETTA DRIVE AND PORTIONS OF SUNDRYfOTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXA ; LETTING CON- TRACT TO AUSTIN ROAD COMPANY AND FOR THE MAKING AND CONSTRUCTION OF SUCH IMPROVEMENTS AND AUTHORIZING ITS EXECU- TION; MAKING APPROPRIATION$ FOR THE PURPOSE OF PAYING THE INDEBTEDNESS THEREBY INCURRED; MAKING PROVISIONS FOR THE LEVYING OF ASSESSMENTS, AGAINST ABUTTING PROPERTIES AND THE OWNERS THEREOF FOR A PART OF THE COST OF SUCH IMPROVEMENTS AND THE ISSUANCE OF ASSIGNABLE CERTIFICATES IN EVIDENCE OF SUCH ASSESSMENTS; DIRECTING THE PUBLIC WORKS DIRECTOR OF THE CITY TO PRE- PARE ESTIMATES; DIRECTING THE CITY SECRETARY TO FILE A NOTICE OF ADOPTION OF THIS ORDINANCE WITH THE COUNTY CLERK OF TARRANT COUNTY, TEXAS; DECLAR- ING THAT THIS ORDINANCE AND ALL SUBSEQUENT PROCEEDINGS RELATING TO SAID STREET IMPROVEMENT ARE AND SHALL BE PURSUANT TO THE ACT OF THE FIRST CALLED SESSION OF THE FORTIETH LEGISLATURE OF THE STATE OF TEXAS, CHAPTER 106; COMMONLY KNOWN AS ARTICLE 1105b OF VERNON'S TEXAS CIVIL STATUTES AS AMENDED BY ACTS 1967, 60TH LEGISLATURE, PAGE 365, CHAPTER 176, SECTION 1, EMERGENCY EFFECTIVE MAY 12, 1967; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND EN- ROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOKS OF THE CITY COUNCIL AND BY FILING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THIS CITY AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Public Works Director for the City of Fort Worth, Texas, has prepared Plans and Specifications for the improvements of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, and same having been examined by the City Council of the City of Fort Worth, Texas, and found to be in all matters and things proper, NOW THEREFORE: BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The hereinafter described Plans and Specifications are hereby approved and adopted. II. There exists a public necessity for the improvement of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, to-wit: UNIT 1: POINSETTA DRIVE From Isbell Road to Levee known and designated as Unit 1, Project No. 104-24000-237 UNIT 2: ANAHUAC AVENUE From Brocks Lane to Meandering Road known and designated as Unit 2, Project No. 104-24000-237 UNIT 3: OAK FOREST DRIVE From south property line of Lot S, Block X, Sunset Acres Addition to SO feet north, known and designated as Unit 3, Project No. 104-24000-237. UNIT 4: KAREN STREET From Highway 80 to West Elizabeth Lane, known and designated as Unit 4, Project No. 104-24000-237. UNIT S: DOREEN AVENUE From Karen Street to Cherry Lane, known and designated as Unit S, Project No. 104-24000-237. UNIT 6: WEST ELIZABETH LANE From Karen Street to Cherry Lane, known and designated as Unit 6, Project No. 104-24000-237. UNIT 7: BRYCE STREET From Montgomery to Gendy Street, known and designated as Unit 7, Project No. 104-24000-237. III. Each of the above described portions of streets, avenues and public places in the City of Fort Worth, Texas, shall be improved by raising, grading, and filling same and by constructing thereon the following, to-wit: UNIT 1: POINSETTA DRIVE From Isbell Road to Levee, known and designated as Unit 1, Project No. 104-24000- 237, a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT 2: ANAHUAC AVENUE From Brocks Lane to Meandering Road, known and designated as Unit 2, Project No. 104- 24000-237, a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT 3: OAK FOREST DRIVE From south property line of Lot 5, Block X, Sunset Acres Addition to 50 feet north, known and designated as Unit 3, Project No. 104- 24000-237, a six-inch hot-mix asphaltic con- crete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. UNIT 4: KAREN STREET From Highway 80 to West Elizabeth Lane, known and designated as Unit 4, Project No. 104 24000-237, a six-inch thick hot-mix asphaltic concrete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT 5: DOREEN AVENUE From Karen Street to Cherry Lane, known and designated as Unit 5, Project No. 104- 24000-237, a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT 6: WEST ELIZABETH LANE From Karen Street to Cherry Lane, known and designated as Unit 6, Project No. 104- 24000-237, a six-inch thick hot-mix asphaltic concrete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high con- crete curb and eighteen-inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT 7: BRYCE STREET From Montgomery to Gendy Street, known and designated as Unit 7, Project No. 104-24000- 237, a seven-inch reinforced concrete pavement with seven-inch super-imposed concrete curb on a forty foot roadway. Six-inch thick con- crete driveways will be constructed where specified. The above, together with concrete curbs, gutters, driveways and incidentals to such improvements, on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said improvements to be constructed as and where shown on the Plans and Specifications therefor. IV. The cost of said improvements as herein defined shall be paid for as follows, to-wit: A. The property abutting on that portion of the street, avenue or public place and the real and true owners thereof shall pay all of the cost of curbs and gutters in front of their property and not exceeding nine-tenths (9/10ths) of the estimated cost of the remainder of such improvements. B. The City of Fort Worth shall pay all of the remainder of the cost of said improvements after deducting the amounts herein specified to be paid by the abutting properties and the real and true owners thereof as set out in subsection A. The amounts payable by the abutting properties and the real and true owners thereof shall be assessed against such properties and the real and true owners there- of and shall constitute a first and prior lien upon such properties and a personal liability of the real and true owners there of and shall be payable to-wit: When the improvements- are completed and accepted by the City on a particular unit, the sums assessed against property abutting upon such completed and accepted units shall be and become payable in five (5) equal installments, due respectively on or before thirty (30) days, and one (1) , two (2) , three (3), and four (4) years from the date of such completion and acceptance and the assessments against the pro- perty abutting upon the remaining units shall be and become due and payable in such installments after the date of completion and acceptance of such respective unit. The entire amount assessed against the particular parcels of property shall bear interest from the date of such completion and acceptance of the improvements on the unit upon which the particular property abuts at the rate of six (6%) percent per annum, payable annually except as to interest on the first installment, which shall be due and payable on the date said installment matures provided that any owner shall have the right to pay any and all of such Installment at any time before maturity by paying principal with interest accrued to the date of payment and further provided if default be made in the payment of any installment promptly as the same matures, then at the option of the City of Fort .Worth or its assigns, the entire amount of the assessment upon which such default is made shall be and become immedi- ately due and payable; but it is specifically provided that no assessments shall in any case be made against any property or any owner thereof in excess of the special benefits to property in the enhanced value thereof by means of said improvements in the unit upon which the particular property abuts, as ascertained at the hearing pro- vided by the law in force in the City, nor shall any assessment be made in any case until after notice of hearing as provided by law. Said assessments against the respective lots and parcels of property and owners thereof shall be evidenced by certificates of a special assessment which shall be executed in the name of. the City of Fort Worth, PROVIDED, however, that acting through its duly authorized Director of Public Works, the City of Fort Worth retaining the right to authorized payment of the sums assessed against abutting property upon such completed and accepted unit in not more than forty-eight equal regular monthly installments of not less than $9.00 each, the first of such installments to become due and payable not more than 30 days after the completion and acceptance by the City of the particular unit, PROVIDED FURTHER, that the City Attorney is hereby empowered to authorize payments of said sums in lesser installments and/or over a longer period of time in cases in which the Director of Public Works has previously determined that an extreme financial hardship upon the property owner will otherwise result and PROVIDED FURTHER, that such method of payment shall be authorized only in instances where the owner or owners of property abutting upon such completed and accepted unit shall have executed and delivered to the City of Fort Worth a lawful, valid and binding note and mechanic's and materialman's contract upon forms supplied by the City granting a mechanic's lien upon and conveying the said abutting property in trust to secure the payment by said owner or owners according to the terms thereof of the sums assessed against such property. V. The assessments against the respective lots and parcels of property and the owners thereof shall be evidenced by certificates of special assessment, which shall be executed in the name of the City by the Mayor of said City and the City Secretary shall attest the same and impress the corporate seal of the City thereon, and which may have attached thereto coupons in evidence of the several installments, or in evidence of any of the installments in which the assessment is payable, which certificates shall be issued to the City of Fort Worth, shall recite the terms and time of payment, the amount of the assessment, the description of the property, and the name of the owners, as far as known, and shall contain such other recitals as may be pertinent thereto, and shall further recite substantially that all pro- ceedings with reference to the making of such improvements have been regularly had in compliance with law, and that all prerequisites to the fixing of the assessment lien against the property described in said certificates and the personal liability of the owners thereof, have been regularly had, done and performed, and such re- citals shall be prima facia evidence of the matters so recited, and no further proof shall be required in any court, and the said certificates shall provide substantially that if default be made in the payment of any installment promptly as the same matures, then, at the option of the City of. Fort Worth, or its assigns, the entire amount of the assessment shall be and become immediately due and payable, together with reasonable attorney's fees and costs of collection, if incurred, all of which, as well as the principal and interest on the assessment, shall be a first and prior lien against the property, superior to all other ii.ens and claims except State, County, School District, and City ad valorem taxes . No error or mistake in naming any owner or in describing any property or in any other matter or thing, shall invalidate any assessment or any certificate issued in evidence thereof, and the omission of improvements on any particular unit or in front of any property exempt by law from the lien of special assessment for street improvements shall not in- validate any assessment levied. The certificates referred to need not contain recitals in exactly the works above provided for, but the substance thereof shall suffice, and they may contain other and additional recitals pertinent thereto. VI. Bids having Deen advertised for as required by Article 1105b of the re- vised Civil Statutes of Texas, as amended, and the bid of Austin Road Company having been found to be the lowest and best bid for the making and construction of said improvements, the contract there- fore is hereby awarded to Austin Road Company , at and for the prices stated in the Proposal of said company and as reported and recommended by the Public Works Department, which said report and recommendation is on file with the City, the City Manager, and the City Secretary are hereby directed to execute the said contract in the name of the City of Fort Worth, Texas, and to impress the corporate seal of the City thereon, the said contract embracing, among other things, the prices for the work. VII. To provide for the payment of the indebtedness incurred by the City of Fort Worth, Texas, by said contract, there is hereby appropriated out of available funds and current revenues of the City, an amount sufficient to pay said indebtedness so incurred. VIII. The improvements provided for herein shall be made and constructed, notice given, hearing held and assessment levied and all proceedings taken and had in accordance with and under the terms of the powers and provisions of Chapter 106 of the Acts of the First Called Session of the Fortieth Legislature of the State of Texas, now known as Article 1105b of Vernon's Texas Civil Statutes, as amended, which law has been adopted as an amendment to and made a part of the Charter of the City of Fort Worth, Texas, and under which law these proceedings are taken and had. IX. Each unit above described shall be and constitute a separate and independent unit of improvement and the assessments herein provided for shall be made for the improvements in each unit according to the cost of the improvements in that unit and according to the benefits arising from the improvements in that unit. X. In making assessments, if the name of the owner be unknown, it shall be sufficient to so state the fact, and if any property be owned by an estate or by any firm or corporation, it shall be sufficient to so state, and it shall not be necessary to give the correct name of the owner, but the real and true owners of the property mentioned shall be liable and the assessments against the property shall be valid. XI. The Director of Public Works of the City of Fort Worth, Texas, be and he is hereby ordered and directed to file with the City Council, estimates of the cost of such improvements in each unit, in accordance with the terms of the powers and provisions of the Charter of the City of Fort Worth, Texas. XII. The City Secretary is directed to prepare, sign and file with the County Clerk of Tarrant County, Texas, a notice in accordance with the provisions of the Act passed at the Fifth Called Session of the Forty-first Legislature of the State of Texas, and shown as Chapter 21 of the Acts of said Session of the Legislature, said Act having been passed in the year 1930, and now known as Article 1220a of Vernon's Texas Civil Statutes. XIII. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. XIV This ordinance shall take effect and be in full force and effect from and after the date of its passage, PASSED AND APPROVED THIS h DAY OF �-�� 1979. APPROVED AS TO FORM AND LEGALITY: or, rr4seoo Fe City Attorney r City of Fort Worth, `I-exas .Mayor ,and Council Communication DAl1.IFF DATE REFERENCE SUBJECT: Award of Contract--Assessment PAGE NUMBER 4/8/74 C-2775 Paving at 7 Locations on the West Side lot 3 Council action on the. project as described below is requested.: Roadway R.O.W. Unit Street Limits Width-Ft. Width-Ft. 1. Poinsettia Ave. Isbell Rd. to Levee 30 50 2. Anahuac Ave. Brooks La. to 30 50 Meandering Rd, 3. Oak Forest Dr. S. Property Line Lot 5, 30 50 B1k. X, Sunset Acres to 50' North 4. Karen Street U.S. 80 to W. Elizabeth La. 40 60 5. Doreen Ave. Karen St. to Cherry La. 30 50 6. W. Elizabeth La. Karen St. to Cherry La. 40 60 7. Bryce Street Montgomery St. to Gendy St. 40 50 Paving in this project is under the City's Assessment Paving Program in the 1973/75 Capital Improvement Program (Page A-111 and A-112) . History Units 1, 2 and 7 were initiated by paving petitions from property owners in 1970. Due to the interruption of the Street Improvement Progtam, the above petitions were repolled in late February, 1973, to insure that pro- perty owners were still in favor of paving their streets after they were paved with penetration type pavement by Tarrant County. Units 3, 4, 5 and 6 were initiated by Community Facilities Contracts in 1971 and 1972, as border streets to the developments. Improvements Units 1, 2, 3 and 5 will be improved by construction of residential grade hot-mix asphaltic concrete pavement with concrete curb and gutter, Units 4 and 6 will be improved with collector .grade.,ho.t-mix. asphaltic concrete pavement with concrete curb and gutter; and Unit 7 will be improved with industrial grade concrete pavement with superimposed curbs. All ,puits will be complete with required concrete driveway approaches and nces- sary storm drain pipe and appurtenances. DATE PAGE REFERENCE SUBJECT: Award of Contract -- Assessment NUMBER 4/8/74 C-2775 Paving at 7 Locations on the West Side -2-- of �- Submission of Bids The following bids have been received: Bidder Amount Austin Road Company $242,173.79 Texas Bitulithic Company 251,534.20 R. W. Gibbins, Inc. 273,016.60 The following contractors took plans and specifications but did not submit bids: Glade, Inc. S.R.O. Asphalt, Inc.. Lewis & Lewis, Inc. Bids Received: March 14, 1974 Working Days Allotted: 103 Proposed Assessments and Enhancement Appraisals Unit 7, Bryce Street, begins at Montgomery Street and ends approximately one block east,with the adjacent industry creating industrial type traffic on and across Bryce Street. In addition, the portion of Bryce Street* to be improved is a relatively short project causing the unit bid price to be higher than the normal unit prices for a project of its type. An independent land appraiser has been retained to appraise the adjacent properties on ,Unit 7, as to enhancement resulting from the proposed street improvement. Results of the appraisal will be presented at the Benefit Hearing. It is the opinion of the Public Works Department that all properties on Units 1 through 6 will be enhanced by an amount equal to or in excess of the amount recommended for assessment. Project Cost and Financing Based on the low bid, approximately $106,515.60 will be assessed against abutting property owners, which will be provided for by a Bond Fund transfer from the Revolving Fund Unspecified. Total construction, inspection engineering, administration and miscellaneous costs to the City is approximately $159,875.57. In addition, approximately $3,550.00 is required for right-of-way acquisition and $1,181.30. to supplement the estimated $14,600.00 originally provided for the contract for design engineering by the consultant (M&C C-2473, dated March 26, 1973.) A Bond Fund transfer of $164,620.00 is required from Assessment Paving Unspecified Account 104-24000-901 to Project Account 104-24000-237 to provide for the Cityls total cost. DATE REFERENCE suBlEcr: Award of Contract -- Assessment PAGE NUMBER 4/8/74 C-2775•• - Paving at 7 Locations on the West Side __3__ or _ _I Recommendations It is recommended that: 1) The following Bond Fund Transfers be approved: Amount From . . To Reason $106,515.60 Unspecified 7 Locations To provide funds for pro- Revolving on West Side perty owners' share of Fund, 042- Revolving construction cost for 09724-901 Fund, 042- Assessment Paving at 7 10424-237 Locations on the West Side, Project No. 104- 2.4000-237 $164,620.00 Unspecified 7 Locations To provide City's share Assessment on West Side of construction cost, in- Paving, 104- Assessment spection engineering sal- 24000-901 Paving, 104- aries, acquisition of 24000-237 right-of-way and miscel- - laneous expenses. 2) An ordinance be adopted: a) Declaring the necessity for and ordering the improvements; b) Making provisions for levying assessments; c) Directing the Public Works Department to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Austin Road Company, in the amount of $242,173.79; and e) Making appropriations to cover the indebtedness thereby incurred for improvements of the project named above. 3) An ordinance be adopted: a) Approving the estimates of costs and amounts proposed to be assessed; and b) Setting May 6, 1974, as the date for the Benefit Hearing. RNL:f SUBMITTED BY: DISPOSITIO14 BY COUNCIL: PR%C�ED BY ET'APPROVED 0 OTHER (DESCRIBE) `�✓/✓/JJ CITY SECRETARY DATE CITY MANAGER PROJECT NO. 104 - 2 4000 - 237 _ I o a OVID D '� rAVE 'tH t' W RI STINE _ - ccNGS` D •� AVE 3 �c UD W c RD—i p ... ` = i•,� . ,fj O NTA MART j I — c= MPERIAL D YLE c W HA HH F?i DR ® MEAND '3 Y W � ;o a R .KS �i'Q ` a c o P AV O 1 „ST E DR V z� B ND S o \, AD Q Qo DR " BLACI OAK ®� sj 0J YETI .. v UN 'DR... OU Sr. �, pp �'S�'' W DEXI R {b - WALNUT DR Ling GQ� RYC AVE Q50 o z Lin e BYER VE W00 AVE ARL HTS eiem 0 i E 30o ifs Line �\ AVE ` ti d p L 2 Vy 7TH IT `► Z y x AS N 0 HI lAVE V o TREYINO AT SON OUN AV V ROS BUN NG = 500 WE $ z m SHENAND H• ZTA' N OLARKE AVE °O nZ NDT eiem. GOEA z ~ z AVE 6 a O p o RAC i Jt �� AVE �„ SLOCUM� a s i m o ,A j c 00 rARb. -� ¢ �� :_ CARTE §DUAR p W ADDLE d ANN _ > ARB R REST INE `y-1 RD i- DOREE AVE a o°Cc DOREEN DO E AVE WE C L WELL D ¢_ �_ WASHFI RN ELIZ H LA z` BET W HARLE AVE F IZAB TH ¢ — o r w t r a Q A�OII ��.UN T 4 YE E N UT a z �� 6•.. m UL " BRYd AVE -- PrA_ 9Q NORMAN AVE H a x BYER AVF RUSR � s a 1 ARRICK E c p L ALBERT AVE �A PO A 1 118� 4J � o � s PERS ING :••:,:;`•.� 'PP�• � .: 7 LOCATIONS ON THE WEST SIDE CITY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION ASSESS NT PAVING AT 7 LOCATIONS ON THE WEST SIDE - PROJECT NO. 104-24000-237 On Monday, March 25, 1974, a Neighborhood Meeting was conducted by the Engineering Division of the Public Works Department at Crestwood Elementary School, for the Assessment Paving of 7 Locations on the West Side. Project No. 104-24000-237. Procedures concerning the proposed improvements, owner participation in costs and methods of payment were explained to the fourteen property owners present. After this explanation the meeting was opened for discussion. Mr. J. W. Hennesseey, Jr. 4408 Poinsetta, was concerned about utility cuts in the street. Mr. Schmidt assured him that all utility adjustments would be made prior to the paving. Mr. Hennesseey also said that he had heard of a proposed trailer park at the end of the street and wondered if the pavement would be heavy enough to stand under the additional traffic. He was assured it would. Mrs. Jack Laird ,asked if the ditches would be filled in. Mr. Schmidt told her that they would be filled in and leveled to form parkways. Mr. Roy Lee Moreland, owner of Lot 16, Block 1, Greenfield Acres, requested a driveway on his property. Mr. Lewis R. Wilson, Jr. owner of Lot 2, Block 4, Broadmoor Addition, said he thought it a waste of money paving streets where there were no existing utilities. Mr. Wilson is owner of the Day Care Center that abuts both Doreen Avenue and W. Elizabeth Lane. There were no questions on Unit 7, Bryce Street. After a short general discussion the meeting was adjourned. FORT WORTH, TEXAS April 8 , 19 74 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen and Mrs. Rimmer: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of Poinsetta Drive and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROJECT NO. 104-24000-237, UNIT 1, POINSETTA DRIVE FROM IS,BELL ROAD TO LEVEE, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Five-inch hot-mix asphaltic concrete pavement Commercial zoning........ ...... ..... ..... $9.33/L.F. Commercial zoning (owner occupied) ....... 6.21/L.F. Residential zoning.... .... ... ........... . 3.09/L.F. Seven-inch curb and eighteen-inch gutter........ . .. 3.41/L.F. Six-inch thick concrete driveways.. ....... .... ..... 1.17/S.F. The assessments result in the following division of cost: TOTAL COST TO PROPERTY OWNERS.. .......... ......... . $249,608.18 TOTAL COST TO CITY OF FORT WORTH................... 55,348.87 TOTAL ESTIMATED CONSTRUCTION COST............ .... .. $79,957.05 PROJECT NO. 104-24000-237, UNIT 2, ANAHUAC AVENUE FROM BROW IANE TO MEANDERING ROAD, to be improved by onstructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Five-inch hot-mix asphaltic concrete pavement Commercial zoning. . .... ... . ....... ........$9.86/L.F. Residential zoning... . .. ........... ....... 3.02/L.F. Seven-inch curb and eighteen-inch gutter. ........... 3.48/L.F. Six-inch thick concrete driveways.. .. ........... .... 1.17/S.F. The assessments result in the following division of cost: TOTAL COST TO PROPERTY OWNERS... . ......... ......... .$11,202.64 TOTAL COST TO CITY OF FORT WORTH.................... 21,085.65 TOTAL ESTIMATED CONSTRUCTION COST..... ...... ........$32,288.29 PROJECT NO. 104 24000-237, UNIT 3, OAK FOREST DRIVE FROM SOUTH PROPERTY LIME OF LOT 5, BLOCK X. SUNSET ACRES ADDITION TO 50 FEET NORTH, to be improved by constructing a six- inch thick hot-mix asphaltic concrete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch gutter on a thirty foot roadway. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement Residential zoning...... ........ ...... ....$2.79/L.F. Seven-inch curb and eighteen-inch gutter.......... .. 3.71/L.F. The assessments result in the following division of cost: TOTAL COST TO PROPERTY OWNERS. .... ... ...... ... ......$ 496.85 TOTAL COST TO CITY OF FORT WORTH.... ..... .. ........ . 29238.25 TOTAL ESTIMATED CONSTRUCTION COST.. .. ...... .... .....$2,735.10 PROJECT NO, 104-24000-237, UNIT 4: KAREN STREET FROM HIGHWAY 80 TO WEST ELIZABETH LANE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement Commercial and apartment zoning..........$14.42/L.F. Seven-inch curb and eighteen-inch gutter,..,...,.., 3.35/L.F. Six-inch thick concrete driveway. ........... .. .... . 1.17/S.F. The assessments result in the following division of cost: TOTAL COST TO PROPERTY OWNERS......................$13,353.44 TOTAL COST TO CITY OF FORT WORTH................... 80131.39 TOTAL ESTIMATED CONSTRUCTION COST. ... ....... .......$21,484.83 PROJECT NO, 104-24000-237, UNIT 5: DOREEN AVENUE FROM KAREN STREET TO CHERRY LANE, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Five-inch hot-mix asphaltic concrete pavement CF zoning... ... .. ..... .. ... ..$9.09/L.F. Residential zoning...... .... ......... .... 3.15/L.F. Seven-inch curb and eighteen-inch gutter... ........ 3.35/L.F. Six-inch thick concrete driveway.. ... ... .:...... .. . 1.17/S.F. The assessments result in the following division of cost: TOTAL COST TO PROPERTY OWNERS... ........... ..... ...$ 6,456.47 TOTAL COST TO CITY OF FORT WORTH.............. ..... 43,587.38 TOTAL EST MTED CONSTRUCTION COST..................$50,043.85 PROJECT NO. 104-24000-237, UNIT 6: WEST ELIZABETH LANE FROM KAREN STREET TO CHERRY LANE, to be improvers by constructing a six-inch thick hot-mix asphaltic concrete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high concrete curb and eight- teen-inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete drive- ways will be constructed where specified. The following assessment rates have been established: Six-inch hot-mix asphaltic concrete pavement Commercial, apartment and CF zoning......$14.42/L.F. Seven-inch curb and eighteen-inch gutter........... 3.35/L.F. Six-inch thick concrete driveway..... .............. 1.17/S.F. The assessments result in the following division of cost: TCThL COST TO PROPERTY OWNERS. .... .................$17,848.86 TOTAL COST TO CITY OF FORT WORTH. .................. 9,052.94 TOTAL ESTIMATED CONSTRUCTION COST. .. .... ...... .... .$26,901.80 PROJECT NO. 104-24000-237, UNITS BRYCE STREET FROM MONTGOMERY STREET TO GENDY STREET, To be improved by constructing a seven-inch reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high superimposed concrete curb on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Seven-inch reinforced concrete pavement Industrial zoning.. .o.o.00000.00000es000.$32o94/L,Fe Seven-inch concrete curb.... .. •......0 •.. .......... 1.41/L.F. Six-inch thick concrete driveway. . ... ...... ........ 1.17/S.F. The assessments result in the following division of cost: TOTAL COST TO PROPERTY OWNERS....... ... ......... ...$32,549.16 TOTAL COST TO CITY OF FORT WORTH... o... ... .000eoeoe 20,431.09 TOTAL ESTIMATED CONSTRUCTION COST..................$52,980.25 TOTAL COST TO PROPERTY OWNERS (ALL UNITS).. .. ......$106,515.60 TOTAL COST TO CITY OF FORT WORTH (ALL UNITS).......$159,875.57 TOTAL ESTIMATED CONSTRUCTION COST (ALL UNITS)......$266,391.17 �2 . h4_tj� CK M. GRAHA14, P.E. CITY ENGINEER PROJECT No. 104-24000-237, UNIT 1: `POINSETTA DRIVE FROM ISBELL R0kD TO LEVEE, to be improv- ed by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thicl lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROOKS IDE ANNEX Beginning at the northeast corner of Isbell Road and Poinsetta Drive. E. D. Crow & Wm. King S152.5-1 9 109.7' Pavement $9.33 $1,023.50 250 Roberts Cut-off Comm. 93' Curb & Gutter 3.41 317.13 76114 194 Sq. Ft. Driveway 1.17 226.98 $1,567.61 T. B. Whitfield 2 9 100' Pavement $3.09 $ 309.00 4424 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 Floyd Eagan 3 9 100' Pavement $3.09 $ 309.00 4320 Quail Trail Rea. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 Bertie Roberson 4 9 100' Pavement $3.09 $ 309.00 515 Isbell Road Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 James W. Hennesseey, Jr. 5-A 9 50' Pavement $3.09 $ 154.50 4408 Poinsetta Dr. Res. 50' Curb & Gutter 3.41 170.50 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 424.45 1, PROJECT NO. 104-24000-237, UNIT 1: POINSETTA DRIVE FROM ISBELL ROAD TO LEVEE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROOKSIDE ANNEX A. J. Buechel, Jr. 5-B 9 50' Pavement $3.09 $ 154.50 601 Harrisdale Res. 50' Curb & Gutter 3.41 170.50 76114 $ 325.00 A. J. Buechel, Jr. 6 9 100' Pavement $3.09 $ 309.00 601 Harrisdale Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 Mrs. Maggie Vickery 7 9 100' Pavement $3.09 $ 309.00 4318 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 Jack Laird 8 9 100' Pavement $3.09 $ 309.00 P.O. Box 333 Res. 100' Curb & Gutter 3.41 341.00 Sebastian, Fla. 85 Sq. Ft. Driveway 1.17 99.45 32958 $ 749.45 Charles E. Gideon 9 9 100' Pavement $3,09 $ 309.00 4300 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $ 650.00 Michigan Avenue intersects 2. PROJECT NO. 104-24000-237, UNIT 1: POINSETTA DRIVE FROM ISBELL ROhD TO VEE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROOKSIDE ANNEX Earlyne Henderson 1 8 100' Pavement $3.09 $ 309.00 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 Edward L. Hale 2 8 100' Pavement $3.09 $ 309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 140 Sq. Ft. Driveway 1.17 163.80 $ 813.80 Edward L. Hale 3 8 100' Pavement $3.09 $ 309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 $ 650.00 Geanie Roberson 4-A 8. 50' Pavement $3.09 $ 154.50 4115 Lennan St. Res. 50' Curb & Gutter 3.41 170.50 Amarillo, Texas 79109 85 Sq. Ft. Driveway 1.17 99.45 $ 424.45 Alfred S. Mauldin 4-B 8 50' Pavement $3.09 $ 154.50 4218 Poinsetta Dr. Res. 50' Curb & Gutter 3.41 170.50 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 424.45 Mrs. C. G. Langston 5 8 100' Pavement $3.09 $ 309.00 4216 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 3. PROJECT NO, 104-24000-237, UNIT 1; POINSET7k DRIVE FROM ISBELL ROAD TO LEVEE, Continued; BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROOKSIDE ANNEX Mrs. Lois Phillips Hill 6 8 100' Pavement $3.09 $309.00 4124 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 C. W. Kimbrough 7 8 100.25' Pavement $3.09 $309.00 - 4120 Poinsetta Dr. Res. 100.25' Curb & Gutter 3.41 341.85 76114 85 Sq. Ft. Driveway 1.17 99.45 $751.07 Opal Yeager 8 8 132.54' Adjusted to c/o First Nat'l Bank Res. 92' Pavement $3.09 $284.28 Trust Dept. 92' Curb & Gutter 3.41 313.72 P.O. Box 701 $598.00 Abilene, Texas 79604 SOUTH SIDE Pete C. Standridge 15 7 132.54' Adjusted to 4224 Poinsetta Dr. Res. 92' Pavement $3.09 $284.28 76114 92' Curb & Gutter 3.41 313.72 $598.00 Pete C. Standridge 16 7 100.25' Pavement $3.09 $309.77 4224 Poinsetta Dr. Res. 100.25' Curb & Gutter 3.41 341.85 76114 85 Sq. Ft. Driveway 1.17 99.45 $751.07 Pete C. Standridge 17 7 100' Pavement $3.09 $309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 4. PROJECT NO, 104-24000-237, UNIT 1: POINSETTA DRIVE FROM ISBELL ROAD TO LEVEE, Continued: BLOCK Q�WR LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE BROOKSIDE ANNEX Pete C. Standridge 18 7 100' Pavement $3.09 $309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 Pete C. Standridge 19 7 100' Pavement $3.09 $309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 City of Fort Worth 20 7 100' No Assessment Res. City of Fort Worth 21 7 100' No Assessment Res. 100' Raymond E. Milligan 22 7 100' Pavement $3.09 $309.00 4245 Poinsetta Res, 100' Curb & Gutter 3.41 341.00 76114 $650.00 Michigan Avenue intersects S. B. Walker 10 6 100' Pavement $3.09 $309.00 4309 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 140 Sq. Ft. Driveway 1.17 163.80 $813.80 5. PROJECT NO. 104-24000-237, UNIT 1: POINSETTA DRIVE FROM ISBELL ROAD TO LEVEE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE BROOKSIDE ANNEX S. B. Walker 11 & E'k of 6 150' Pavement $3.09 $ 463.50 4309 Poinsetta Dr. 12 Res. 150' Curb & Gutter 3.41 511.50 76114 85 Sq. Ft. Driveway 1.17 99.45 $1,074.45 L. J. Austin & A of 12 6 50' Pavement $3.09 $ 154.50 B. B. Middlebrook Res. 50' Curb & Gutter 3.41 170.50 76107 85 Sq. Ft. Driveway 1.17 99.45 $ 424.45 M. 0. Lawyer 13-B 6 50' Pavement $3.09 $ 154.50 608 Isbell Road Res. 50' Curb & Gutter 3.41 170.50 76114 140 Sq. Ft. Driveway 1.17 163.80 $ 488.80 Dale Williams 13-A 6 50' Pavement $3.09 $ 154.50 4403 Poinsetta Dr. Res. 50' Curb & Gutter 3.41 170.50 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 424.45 D. R. Milligan 14 6 100' Pavement $3.09 $ 309.00 4245 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 140 Sq. Ft. Driveway 1.17 163.80 $ 813.80 Floyd H. Eagan 15 6 100' Pavement $3.09 $ 309.00 4320 Quail Trail Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 6. PROJECT NO, 104-24000-237, UNIT 1: POINSETTA DRIVE FROM ISBELL ROAD TO LEVEE, Continued: BLOCK CAR LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE BROOKS IDE ANNEX Floyd H. Eagan 16 6 100' Pavement $3.09 $309.00 4320 quail Trail Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 Floyd H. Eagan 17-A & 17-8 6 100' Pavement $3.09 $309.00 4320 Quail Trail Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 Mrs. G. H. Bettes 18 A 6 Owner occupied 4429 Poinsetta Dr. Comm. 109.5' Pavement $6.21 $680.00 76114 93' Curb & Gutter 3'.41 317.13 $997.13 TOTAL COST TO PROPERTY OWNERS (UNIT 1).. ...........$24,608.18 TOTAL COST TO CITY OF FORT WORTH (UNIT 1) ........ ..$55,348.87 TOTAL ESTIMATED CONSTRUCTION COST (UNIT 1).. ...... .$79,957.05 7. PROJECT NO, 104-24000-237, UNIT 2;- ANAHUAC AVENUE FRCM BROM LANE TO MEANDERING ROAD, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five- inch thick lime stabilized subgsade with seven-inch-high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OMR LOT ZONM FRONTAGE RATE AMOUNT ASSESSMENT WEBS GREENFIELD ACRES Beginning at the NW corner of Brocks Lane and Anahuac Avenue, Earl C. .hones S'k-11 1 50' Pavement $3.02 $ 151.00 901 Anahuac Ave. Res, 50' Curb & Gutter 3.48 174.00 76114 $ 325.00 Earl C. Jones A-11 1 502 Pavement $3.02 $ 151.00 901 Anahuac Ave. Res, 500 Curb & Gutter 3.48 174.00 76112 $ 325.00 Lillie Sawey 12 1 100' Pavement $3.02 $ 302.00 900 Anahuac Ave. Res. 1000 Curb & Gutter 3.48 348.00 76114 $ 650.00 Emmett Earl Fox II 13 1 100' Pavement $3.02 $ 302.00 921 Anahuac Ave. Res. 1009 Curb & Gutter 3.48 348.00 76114 85 Sq, Ft. Driveway 1.17 99.45 $ 749.45 P. J. Carter Sk-14 1 50' Pavement $3.02 $ 151.00 6721 Telephone Rd. Res, 50' Garb & Gutter 3.48 174.00 76135 85 Sq, Ft, Driveway 1.17 99.45 $ 424.45 8. PROJECT NO, 104-24000-237, UNIT 2: ANAHUAC AVENUE FROM BROCKS LANE TO MEANDERING ROAD, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE GREENFIELD ACRES Donald B. Banks N'k-14 1 50' Pavement $3.02 $151.00 929 Anahuac Ave. Res. 50' Curb & Gutter 3.48 174.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $424.45 James C. McGowan S'k-15 1 50' Pavement $3.02 $151.00 1005 Anahuac Ave. Res. 50' Curb & Gutter 3.48 174.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $424.45 James C. McGowan N'k-15 1 50' Pavement $3.02 $151.00 1005 Anahuac Ave. Res. 50' Curb & Gutter 3.48 174.00 76114 140 Sq. Ft. Driveway 1.17 163.00 $488.80 Roy Lee Moreland 16 1 100' Pavement $3.02 $302.00 1103 Midway Drive Res. 94.5' Curb & Gutter 3.48 328.86 Richardson, Texas 140 Sq. Ft. Driveway 1.17 163.80 $794.66 Betty Jean Mercer 17 1 100' Pavement $3.02 $302.00 1023 Anahuac Ave. Res. 94.5' Curb & Gutter 3.48 328.86 76114 85 Sq. Ft. Driveway 1.17 99.45 $730.31 Donald E. Thomas 18 1 59.4' 5500 Dartmouth Res. No benefit due to grade differential 76114 No Assessment 9. PROJECT NO, 104-24000-237, UNIT 2: ANAIHC AVENUE�FRCK BR OCKS 1AWE TO WANDERING ROAD, Continued: BLOCK WR LOOT ZONING FR�OtMGEGE RATE AMOUNT ASSESSMENT Meandering Road intersects EASE IDE GREENFIELD ACRES Basil Johannesen 1 2 60' 6171 Meandering Road Comm, No benefit due to grade differential 76114 No Assessment Basil Johannesen 1-A 2 70' Pavement $9.86 $ 690.20 6171 Meandering Road Comm, 70' Curb & Gutter 3.48 243.60 76114 $ 933.80 Alex Rawls 1-B 2 50' Pavement $9.86 $ 493„00 6163 Meandering Road Comrn. 50' Curb & Gutter 3.48 174,00 76114 41 Sq, Ft, Driveway 1.17 47.97 $ 714.97 Alex Rawls 1-C 2 50' Pavement $9.86 $ 493.00 6163 Meandering Road Comm. 50' Curb & Gutter 3,48 174.00 76114 $ 667.00 Alex Rawls 2 A 2 50' Pavement $3.02 $ 151.00 6163 Meandering Road Res, 50' Curb & Gutter 3.48 174.00 76114 $ 325.00 10. PROJECT NO, 104-24000-237, UNIT 2: ANAHUAC AVENUE FROM BROCKS LANE TO MEANDERING ROAD, Continued: BLOCK OWNER. LOT ZONING FRO MGE RATE AMOUNT ASSESSMENT MST SIDE GREENFIELD ACRES Dan R. Rawls 2 & Nk-3 2 85' Pavement $3:02 $256:70 6009 Meandering Rd. Res. 85' Curb & Gutter 3,48 295.80 76114 85 Sq. Ft, Driveway 1.17 99.45 $ 651.95 H. W. Johnson Sk-3 2 50' Pavement $3.02 $151:00 924 Anahuac Ave. Res, 50' Curb &Gutter 3,48 174'00 76114 85' Sq, Ft, Driveway 1.17 99.45 $ 424.45 Eva Banks 4 2 100' Pavement $3002 $302000 920 Anahuac Ave. Res, 100' Curb & Gutter 3.48 348.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 Willy T. Thomas 5 2 100' Pavement $3.02 $302.00 908 Anahuac Ave. Res, 100' Curb & Gutter 3.48 348.00 76114 85 Sq. Ft, Driveway 1.17 99.45 $ 749.45 Ila C. Redwine Nk-6 2 50' Pavement $3.02 $151.00 904 Anahuac Ave. Res, 50' Curb & Gutter 3.48 174.00 76114 $ 325.00 11, L�Y�®�,. 104 24000-237, UNIT 2; ANAHUAC AVENUE FROK BROCKS,LANE TO MEANDERING ROAD, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE GREENFIELD ACRES Lillie A. Sawey- Sk-6 2 50' Pavement $3.02 $151000 900 Anahuac Ave. Res, 50' Curb & Gutter 3.48 174.00 76114 $ 325.00 TOTAL COST TO PROPERTY OWNERS (UNIT 2) . . . . . . . . . . . . . . . . $11,202.64 TOTAL COST TO CITY OF FORT WORTH (UNIT 2) . . . . . . . . . . . . $21,085.65 TOTAL ESTIMATED CONSTRUCTION COST (UNIT 2) . . . . . . . . . . . . .$329288.29 12. PROTECT No, 1^04-244000-237, UNIT 3: OAK .FOREST DRIVE FRaK SOUTH PROPERTY LINE OF LOT 5, BLOCK X.SUNSET ACRES ADDITION TO 50 FEET NORTH, to be improved by constructing a six-inch hot-mix asph. ltic concrete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. BLOCK (NNEER LOT ZONING FRONTAGE. RATE AMOUNT ASSESSMENT WEST SIDE SUNSET ACRES ADDITION .Pack W. Boulton 21-A u 35' Pavement $2;79 $ 97.65 975 Roaring Springs Rd. Res, 20' Curb & Gutter 3.71 74.20 76114 $171.85 3 C. Crcekmore & 5 X 50' Pavement $2;79 $1390'50 3. E. Whitworth Res, 50' Pavement 3.71 185.50 1816 Reeder Road $325.00 Azle, Texas 76020 TOTAL COST TO PROPERTY OWNERS (UNIT 3). . . . . . .. . . . . . . . . $ 496.85 TOTAL COST TO CITY OF FORT WORTH (UNIT 3). . . . . . . . . . . . . $2,238.25 TOTAL ESTIMATED CONSTRUCTION COST (UNIT 3). . . . . . . . . . . . $2,735.10 13. FR0,1ECT NO Q 104-24000-237 UNIT 4; KAREN STREET FROM HIGHWAY 80 TO WEST ELIZABETH LANE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a seven- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE BROADMOOR ADDITION Beginning at the NW intersection of Highway 80 and Karen Street. Germany's Nursery M-R 3 187.8' Pavement $14.42 $2,708.08 528 Athenia Drive Comm. 187.8' Curb & Gutter 3.35 629.13 76114 116 Sq. Ft. Driveway 1.17 135.72 $3,472.93 J. P. Germany, Sr. 14 3 150.8' Pavement $14.42 $2,174.54 528 Athenia Drive Apt. 150.8' Curb & Gutter 3.35 505.18 76114 $2,679.72 West Elizabeth Lane intersects EAST SIDE ALTA MERE ADDITION Vantage Properties, Inc. 1 35 369.47' Pavement $14.42 $5,327.76 8383 Stemmons Freeway Comm. 379.47' Curb & Gutter 3.35 1,237.72 Dallas, Texas 543 Sq. Ft. Driveway 1.17 635.31 75247 $7,200.79 TOTAL COST TO PROPERTY OWNERS (UNIT 4)...... ....$13,353.44 TOTAL COST TO CITY OF FORT WORTH (UNIT 4)....... 8,131.39 TOTAL ESTIMATED CONSTRUCTION COST (UNIT 4)......$21,484.83 14. PIRG CT NO,104-24000-237L UNIT 5: DOREEN AVENUE FROM ,KAREN STREET TO CHERRY LANE, to be Improved try constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick time stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide con- czlets gutter on'a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK ; nrR LOT ZONING FRONVIGE RATE AMOUNT ASSESSMENT NTR' '! SIDE BROADMOOR ADDITION ?beginning at the NE corner of Karen Street and Doreen Avenue. BobM. Mitchell 16 9 60' Pavement $3:15 $189:00 R.t. 10, Box 332-A Res. 60' Curb & Gutter 3.35 201.00 $390.00 Randy i'ohAason 15 9 60' Pavement $3,15 $189.00 5113 Kilpatrick Res, 60' Curb be Gutter 3,35 201,00 76107 $390.00 B. C. Spinks 14 9 60' Pavement $3015 $189.00 637 Walter Rill Road Res, 60' Curb & Gutter 3.35 201.00 Crand Prairie, Texas $390.00 75050 Newton E. Renfroe 13 9 117.8' Side lot adjusted to 8025 Doreen Ave. Res, 100' Pavement $3.15 $315,00 76116 100' Curb & Gutter 3.35 335.00 $650.00 Laren Street intersects :+toward K.S. Wong 10 10 130.75' Side lot adjusted to 3232 Cherry Lane Re 100! Pavement $3.15 $315.00 76108 100' Curb & Gutter 3,35 335.00 $650.00 15. PROJECT NO. 104-24000-237, UNIT 5: DOREEN AVENUE FROM KAREN STREET TO CHERRY LANE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROADMOOR ADDITION Howard K. S. Wong 9 10 130.73' Side lot adjusted to 3232 Cherry Lane Res. 20' Pavement $3.15 $ 63.00 76108 100' Curb & Gutter 3.35 335.00 $398.00 Cherry Lame intersects SOU' SIDE BROADMOOR. ADDITION City of Fort Worth 8 4 114.7' Existing facilities ff'ire Department Res. No Assessment Earl J. Yeates 7 4 60' Pavement $3.15 $189.00 76 E. Via De La Reina Res. 60' Curb & Gutter 3.35 201.00 Merritt Island, Fla. 74 Sq. Ft. Driveway 1.17 86.58 $476.58 Mrs. Belle Richardson 6 4 60' Pavement $3.15 $189.00 7905 Doreen Ave. Res. 60' Curb & Gutter 3.35 201.00 76116 $390.00 Lewis R. Wilson, Jr. 5 4 60' Pavement $9.09 $545.40 P.O. Box 12546 CF 60' Curb & Gutter 3.35 201.00 135 Sq. Ft. Driveway 1.17 157.95 $904.35 Cecil D. Webb 4 4 60' Pavement $3.15 $189.00 Rt. 8 Box 172 Res. 60' Curb & Gutter 3.35 201.00 74 Sq. Ft. Driveway 1.17 86.58 $476.58 16•. PROJECT NO." 104-24000-237, UNIT 5: DOREEN AVENUE FROM KAREN STREET TO CHERRY LANE. Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT S©U39 SIDE BROADMOOR ADDITION Southern Homes Co. 3 4 60' Pavement $3.15 $189.00 Box 24726 Res* 60' Curb & Gutter 3.35 201.00 Dallas, Texas 75224 $390.00 Livia R. Wilson, Jr. 2 4 60' Pavement $3.15 $189:00 P.O. Box 12546 Res, 60' Curb & Gutter 3,35 201.00 $390.00 Naomi T. Lytle 1 4 86.3' Pavement $3.15 $2710'85 3529 Bonnie Res, 86.3' Curb & Gutter 3.35 289.11 76116 $560.96 TOTAL COST TO PROPERTY OWNERS (UNIT 5). . . . . . . . . . . . . . . . $ 6,456.47 TOTAL COST TO CITY OF FORT WORTH (UNIT 5) ... . . .. . .... $43,587.38 TOTAL ESTIMATED CONSTRUCTION COST (UNIT 5). ... ........ $50,043.85 17. to tOJECT NO. 104-24000-237 UNIT 6; WEST ELIZABETH 1ANE 'FRO14 KAREN STREET TO CHERRY LANE, be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement- on a seven- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on'a forty foot roadway. Six-inch thick concrete driveways will be construct- ed where specified. BLOCK DOWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROADMOOR ADDITION Beginning at the NE corner of Karen Street and West Elizabeth Lane. Lewis R. Wilson 17 4 60' Pavement $14;42 $ 865.20 P.C. Box 12546 Apt. 60' Curb & Gutter 3.35 201.00 $1,066.20 Leo Lew, Inc. 16 ,4 601 Pavement $14;42 $ 865' 20 P.O. Box 12546 Apt, 60' Curb & Gutter 3.35 201.00 $1,066.20 James F. Beckman 15 ,4 60' Pavement $14*42 $ 865.20 5324 Quail Run Apt. 60' Curb & Gutter 3.35 201.00 76107 $19066.20 Lewis Wilson, Jr. 13 & 14 4 120' Pavement $14.42 $1,730.40 P.O. Box 12546 CF 120' Curb & Gutter 3;35 402.00 232 Sq. Ft. Driveway 1.17 271.44 $2,403.84 Richard D. Stroud 12 ,4 60' Pavement $14.42 $ 865.20 Rt. 1, Box 134-W Apt, 60' Curb & Gutter 3.35 201.00 Azle, Texas $1,066.20 18. PROJECT NO. 104-24000-237, UNIT 6; WEST ELIZABETH LANE FROM KAREN STREET TO CHERRY LANE, Continued: BLOCK OWNL,R LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT N1R.TH SIDE BROADMOOR ADDITION C. N. Adcock & 11 4 60' Pavement $14.42 $ 865.20 Bruce R. Farley Apt. 601 Curb & Gutter 3.35 201.00 See Coast Trust Deed Co. $ 1,066.20 1521 W. Motel Circle Saar Diego, Calif. 92108 City of Fort Worth 10 4 141.6' Fire Department No Assessment Cherry Lane intersects SOL,'TH SIDE ALTA MERE ADDITION %Fantage Properties, Inc. 1 35 551.321 Pavement $14.42 $7,950.03 8383 Stemmons Freeway Comm, 551.32' Curb & Gutter 3.35 1,846.92 Dallas, Texas 271 Sq. Ft. Driveway 1.17 317.07 75247 $10,114.02 TOTAL COST TO PROPERTY OWNERS (UNIT 6) ........ ..$17,848.86 TOTAL COST-TO CITY OF FORT WORTH (UNIT 6) .. .....$ 9,052.94 TOTAL ESTIMATED CONSTRUCTION COST (UNIT 6) ......$26,901.80 19. RQjECT Not, 104-24000-237�IT 7 : BRYCE STREET FROM MONTGOMERY TO GENDY STREET, to be improved by constructing a seven-inch reinforced concrete pavement with seven-inch super- kmpcsed con-crate curb on a forty foot roadway. Six-inch thick concrete driveways will be conztrructed where specified. BLOCK CW1 R LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE ROSS HEIGHTS Beginning at the NE corner of Montgomery Street and Bryce Street. Energy Resources Corp. 12 thru 20 13 440' Pavement $32.94 $14,493.60 2005 'Mona tgomery Ind. 435' Curb 1.41 613.35 ?6107 303 Sq. Ft. Drive 1.17 354.51 $15,461.46 City of Fort Worth 11 13 50' No Assessment uendy Street intersects C.C. Griffin 9 & 10 18 100' Pavement $32.94 $ 39294.00 4824 Crestline Ind. 100' Curb 1.41 141.00 76107 55 Sq. Ft. Drive 1.17 64.35 $ 30499.315 Double Seal Ring Co. 7 & 8 18 100' Pavement $32.94 $ 3,294.00 2065 Montgomery Ind. 95' Curb 1.41 133.95 76107 96 Sq. Ft. Drive 1.17 112.32 $ 3,540.27 Harry B. Friedman 3 thru 6 18 200' Pavement $32.94 $ 6,588.00 1510 W. 10th Street Ind. 200' Curb 1.41 282.00 76102 41 Sq. Ft. Drive 1.17 47.97 $ 6,917.97 20. PROJECT NO. 104-24000-237, UNIT 7 : BRYCE STREET FROM MONTGCMERY TO GENDY STREET, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE ROSS HEIGHTS Energy Resources Corp. 1 & 2 18 90' Pavement $32.94 $ 2,964.60 2005 Montgomery Ind. 90' Curb 1.41 126.90 76107 33 Sq. Ft. Drive 1.17 38.61 $ 3,130.11 TOTAL COST TO PROPERTY OWNERS (UNIT 7) ... ..........$32,549.16 TOTAL COST TO CITY OF FORT WORTH (UNIT 7) ..........$20,431.09 TOTAL ESTIMATED CONSTRUCTION COST (UNIT 7) .........$52,980.25 TOTAL COST TO PROPERTY OWNERS (ALL UNITS) . . . . . . . . . . . . . $106,515.60 TOTAL COST TO CITY OF FORT WORTH (ALL UNITS) . . . . . . . . . . $159,875.57 TOTAL ESTIMATED CONSTRUCTION COST (ALL UNITS) . . . . . . . . $266,391.17 21.