Loading...
HomeMy WebLinkAboutOrdinance 7669 ORDINANCE NO. 7 Wei 9 ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF SOUTH CAMPUS DRIVE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH AUSTIN ROAD COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with Austin Road Company , for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-wit- SOUTH CAMPUS DRIVE From Seminary Drive to Mansfield Highway, known and designated as Project No. 104-23000-146, a seven- inch thick reinfroced concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high superimposed concrete curb on two thirty-three foot traffic lanes with a twenty-six foot median. WHMMS, by sundry proceedings heretofore passed by the City Council of the City of Fbrt Worth, Texas, including Ordinance No. 7386 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHMAS, the City Council of the City of Fort Worth, Texas, has, upon re- view, found and determined that, in some instances, in order to effect substantial ,justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 7386 , and 'ffHMEAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, TH—METFORE, BE IT ORDAIN34D BY THE CITY COUNCIL OF T?M CITY OF FORT WORTH, TIT-US, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with re- ference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certifi- cates, to,-ether with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certificates has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS q"'t day of , 19=. APPROVED AS TO FORM AND LEGALITY: City Attorney PROJECT NO. 104-23000--146, SOUTH CAMPUS DRIVE FROM SEMINARY DRIVE TO THE MANSFIELD HIGHWAY, to be improved by constructing a seven-inch reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven inch high superimposed concrete curb on two thirty-three foot traffic lanes with a twenty-six foot median. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE WILLIAM HICKS SURVEY Booth B. Strange Tract 10 659.18' Pavement $24.67 $16,261.97 P. 0. Box 2469 Ind. 639.18' Curb 1.01 645.57 Houston, Texas 77001 $16,907.54 RAILROAD R.O.W. 125' A. L. Finger, Trustee Tract 9 1,113.07' Pavement $24.67 $27,459.44 P. 0. Box 194 Ind. 1,138.07' Curb 1.01 1,149.45 Houston, Texas $28,608.89 EAST SIDE A. L. Finger, Trustee Tract 9 1,140.67' Pavement $24.67 $28,140.33 P. 0. Box 194 Ind. 1,090.67' Curb 1.01 1,101.58 Houston, Texas $29,241.91 RAILROAD R.O.W. 125' Booth B. Strange Tract 10 574.76' Pavement $24.67 $14,179.33 P. 0. Box 2469 Ind. 569.76' Curb 1.01 575.46 Houston, Texas 77001 $14,754.79 TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) . . . . . . . . . .. . . .$ 89,513.13 TOTAL COST TO CITY OF FORT WORTH (STREET) . . . . . . . . . . . . . . . .$101,254.81 TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN) . . . . . . . . . . .$ 76,740.48 TOTALCONSTRUCTION COST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$267,508.42 'MILE City of Fort Worth, Texas UN BAILIFF Mayor and Council Communication RAHA. DATE REFERENCE SUBJECT: Final Payment R, Construction PAGE NUMBER of South Campus Drive from Seminary DriVIE 11/29/77 FP-1273 to Old Mansfield Highway -- Project No. I or 2_._ 104-23000-146 Final Council action on the project desgribed below is requested. Project Description Name: Construction of South Campus Drive from Seminary Drive to Old Mansfield Highway - Project No. 023 14600 Contractor: Austin Road Company Contract Awarded: June 21, 1976 (M&C C--3433) Work Order issued: August 2, 1976 :. Partial for portion of storm drain only Work Began: August 2, 1976 Project Substantially Complete and Final Inspection Made: August 31, 1977 Final Construction Approval: October 27, 1977 Working Time Bid: 75 + 5 (C.O. #1) = 80 Working Time Used: 90 Project Cost and Financing Original Bid Price: §240,401.41 Change Order No. 1: 4,531,37 (M&C C-3488, 8,28.76) No. 2: 460.00 (A.R. 1-15 2.3.1) Revised Bid Price: 244,932.78 Final Contract Cost: $247,349.44 Partial Payments Previously Made: 9 Amount: $219,758.80 Final Payment Due; 27,590.64 Sufficient funds are available for the final payment to be made from Project Number 104--230001-146. Contract Time Time charges show the contractor used 10 Working Days in addition to the time allotted. However, no liquidated damages are recommended because the contractor suffered considerable loss of time and could not prosecute his work in a normal manner at the railroad crossing because the right of entry on the railroad right-of-way was not obtained until the project was almost complete. The plank crossing and warning devices still have not been completed by the railroad, and the contractor, in cooperation with the City, has continued to provide the necessary barricades to keep the road closed (to safeguard the public) since the project was completed on August 31, 1977. Deviation from Bid Price The final contract cost of this project is $2,416.66 or 1% over the revised bid price. The increase is attributed to� minor variations between quantities estimated in the Contract Specifications and quantities measured and used at the job site. DATE REFERENCE SUBJECT: Final Payment - Construction PAGE NUMBER of South Campus Drive from Seminary Driv 2 2 11/29/77 FP-1273 to Old Mansfield Highway - Project No. Of Com liance with Specifications Tests made during construction show that materials used and required_ thicknesses were in compliance with Contract Specifications with the exception of one minor area and the contractor was penalized for tflis area as provided for in the Contract Specifications. Recommendations It is recommended that the project described be accepted by the adoption of an ordinance and final payment of $27,590.64 be made to Austin Road Company, GG;sm SUBMITTED BY: DISPOS ITIO Y COUNCIL � PROCESSED BY APPROYED (3 OTHER (DESCRIBE) p d N CI�ADOPTEDC : SECRETARY DATE CITY MANAGER