Loading...
HomeMy WebLinkAboutOrdinance 7888 ORDINANCE NO. 7 8 O O ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF nnRFFN AVFNIIF AND PORTIONS OF SUNDRY OTHER STREETS; AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH A-1 MAINTENANCE, INC. FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SANE IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE, WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with A-1 MAINTENANCE. INC. , for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-vito DOREEN AVENUE From 185' west of Francis Drive to Francis Drive, known and designated as Project No. 104-24000-271, a five- inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-foot roadway. Six-inch thick concrete driveways will be constructed where specified. 1�4HEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 7751 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above; described portions of streets, avenues and public places and against the real and true owners thereof; and, wHEftEAs, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 7751 , and YJHEHEAs, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THE,hZFOR.E, BE IN ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TE,,U3, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed andshall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certificates has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS day of , 19 APPROVED AS TO FORM AND LEGALITY: City Attorney PROJECT NO. 104-24000-271: DOREEN AVENUE FROM 185' WEST OF FRANCIS DRIVE TO FRANCIS DRIVE, to be improved by constructing a five-inch thick hot mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-foot roadway. Six-inch thick concrete driveways will be con- structed where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE WESTERN HILLS ADDITION Beginning at a point 185' west of Francis Drive Earl D. Griffin 6 5 24' Existing facilities -0- 3221 Phoenix Drive Res. Fort Worth, Texas 76116 BROADMOOR ADDITION Richard L. Todd 9 7 161' Side lot adjusted to: 3262 Francis Drive Res. 100' Pavement $3.41 $341.00 Fort Worth, Texas 76104 100' Curb & gutter 5.09 509.00 $850.00 Francis Drive intersects SOUTH SIDE Guy P. Jacks, Jr. 11 1 163' Side lot adjusted to: 3300 Francis Drive Res. 100' Pavement $3.41 $341.00 Fort Worth, Texas 76104 100' Curb & gutter 5.09 509.00 140 S.F. Driveway 2.65 371.00 $1,221.00 WESTERN HILLS ADDITION Norman Ray 1 1 24' Existing facilities -0- 3301 Phoenix Drive Res. Fort Worth, Texas 76116 TOTAL COST TO PROPERTY OWNERS (ASSESSMENTS) . .. . . ..... . . . . . . . . . . . . . . . .$ 2,071.00 TOTAL COST TO CITY OF FORT WORTH (STREETS) . . . . . . . . . . . . . . . . . . . . .. . . . . .$20,968.40 TOTAL COST TO CITY OF FORT WORTH (STORM DRAIN) . . . . . . . . . . . . . . . . . . . . . . .$47,298.03 TOTAL CONSTRUCTION COST. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$70,337.43 94 `-1 City o Fort Worth Texas F y f FILE Mayor and Council Communication M ERCHERT BAILIFF DATE REFERENCE SUBJECT: Final Payment: Assessment Paving PAGE NUMBER of Doreen Avenue from Phoenix Drive to SMITH 2 L7 7 FP-1364 Francis Drive and Storm Drain Extension loft_ Final Council action is requested on the project described below. Project Description Name: Assessment Paving of Doreen Avenue from Phoenix Drive to Francis Drive and Storm Drain Extension, Project No. 104-24000-271, Contract No. 9895 dated May 9, 1978. Contractor: A-1 Maintenance, Inc. Contract Awarded: May 9, 1978 (M&C C-4184) Work Order Issued: June 27, 1978 Work Order Effective: July 10, 1978 Work Began: July 11, 1978 Project Substantially Complete and Final Inspection Made: November 30, Final Construction val: February 9, 1979 Working Time Bid: 45 Working Days Working Time Used: 47 Working Days Project Cost and Financing Original Bid Price: $66,009.50 Final Contract. Cost: $61,699.50 Less 2 days liquidated damages @ $75/day = $150,,00 Partial Payments Previously Made: 5 Amount: $55,504.35 Final Payment Due: $6,045.15 Deviation from Bid Price The final contract cost of this project is $4,310 under the contract price; the major portion of the savings, $1,200, resulted because it was not necessary to construct subdrains. The remaining cost diff erenc -.,$3.11(), is attributed to minor variations between quantities estimated in the contract specifications and quantities measured and used on the job site. DATE REFERENCE SUBJECT: Final Payment: Assessment Paving PAGE NUMBER of Doreen Avenue from Phoenix Drive to 2 2 2/27/79 FP-1364 Francis Drive and Storm Drain Extension of i Contract Time The contractor used two working days in addition to the time allotted. A charge of $75 per day has been deducted from the final payment as liquidated damages as provided for in the contract. Financing Sufficient funds are available for the final payment to be made from Project No. 104-24000-271. Compliance with Specifications Tests made during construction show materials used and required thicknesses were in compliance with contract specifications. Recommendation It is recommended that the project described be accepted by the adoption of an ordinance, and final payment of $6,045.15 be made to A-1 Maintenance, Inc. GG:plg SU ED BY: DISPOSITIOW BY COUNCIL: PROCESSED BY APPROVED ❑ OTHER (DESCRIBE) 0� I-In rDrkINANCE NO. s 8�, ,;�B.J _ TY SECRETARY DATE CITY MAN ��717