Loading...
HomeMy WebLinkAboutContract 43406FM pa Contractor Street Address City & State pe Telephone r Contact Person pe r CONTRACT DOCUMENTS r i CLEAR FORK DRAINAGE BASIN In M -210 SEWER IMPROVEMENTS — PART 2 Sewer Project Number P275- 703170102287 pa Water Project Number P265- 603170102287 DOE # 6807 In X -21801 P0 CITY OF FORT WORTH TARRANT COUNTY, TEXAS in RJN GROUP, INC. CONSULTING ENGINEERS FORT WORTH, TEXAS W March 1, 2012 PW Im ps Im r CONTRACT DOCUMENTS CLEAR FORK DRAINAGE BASIN M -210 SEWER IMPROVEMENTS - PART 2 SEWER PROJECT NUMBER P275- 703170102287 WATER PROJECT NUMBER P265- 603170102287 DOE # 6807 File # X -21801 City Project # 01022 FW March 1, 2012 w Y hereby state that these Contract Documents were prepared under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Texas. r an ON �a�aaarr►>>�' OP CHRIS ERIC. BROOKS i . 67697 : W : � ♦ o •. -gyp D:4.w t++ ONAL Chris Eric Brooks Date. March 1, 2012 Registration No. 67697 in CITY COUNCIL AGENDA COUNCIL ACTION: Approved on 6112/2012 ']foal sfle o! Ihr. City rA Fa' Worth, ruas FORT WORTII DATE: 6/12/2012 REFERENCE NO.: C -25666 LOG NAME: 60SSM21OP2 -NTC CODE: C TYPE: NON- CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of a Contract with North Texas Contracting, Inc., in the Amount of $1,029,708.20 for Clear Fork Drainage Basin M -210 Sanitary Sewer Improvements, Part 2, on Colonial Parkway and Rogers Road (COUNCIL DISTRICTS 3 and 9) RECOMMENDATION: It is recommended that the City Council authorize the execution of a contract with North Texas Contracting, Inc,, in the amount of $1,029,708.20 for Clear Fork Drainage Basin M -210 Sanitary Sewer Improvements, Part 2. DISCUSSION: On April 13, 2010, (M&C C- 24176) the City Council authorized the City Manager to execute an engineering Agreement with RJN Group, Inc., for the preparation of plans and specifications for Clear Fork Drainage Basin M -210 Sanitary Sewer Improvements. The purpose of this project is to eliminate sanitary sewer overflows in compliance with the Texas Commission on Environmental Quality (TCEQ) ' Sanitary Sewer Overflow Initiative. The Construction of Part 1 of the project was completed in April 2012. This project, Part 2, is a continuation of Part 1 and consists of the installation of approximately 1,400 feet of 42 -inch and 36 -inch sewer line in Colonial Parkway. The project was advertised for bid on March 1, 2012 and March 8, 2012 in the Fart Worth Star- Telegrpm. On April 5, 2012, the following bids were received: Alternate B allowed for HOPE pipe to be used as an alternative to concrete pipe for the storm drain pipe adjustments. Bids for Alternative B marked with an ' were declared unresponsive. Staff has elected to use Alternate A bids for the award of this contract. MIWBE - North Texas Contracting, Inc., is in compliance with the City's MVJBE Ordinance by committing to 23 percent MIWBE participation. The City's goal on this project is 17 percent. In addition to the contract cost, $30,000.00 is required for construction staking, project management, material testing and inspection and $31,000.00 is provided for project contingencies. Alternate A Alternate B (Concrete Pipe) (HDPE Pipe) Bidder Amount Amount Time of Corn letion North Texas $1,029,708.20 $1,028,128.20 180 Calendar Days Contracting, Inc. S.J. Louis Construction $1,035,994.32 $1,032,834.32 of Texas, LTD Wright Construction $1,112,763.95 $1,1 12,763.95 Co., Inc. Jackson Construction, $1,287,970.50 NO BID Ltd. Gin -S en Inc. $1,297,841.00 3 641.00 ARK Contracting $1,421,060.00 t$1,421,060.00 Services LLC Alternate B allowed for HOPE pipe to be used as an alternative to concrete pipe for the storm drain pipe adjustments. Bids for Alternative B marked with an ' were declared unresponsive. Staff has elected to use Alternate A bids for the award of this contract. MIWBE - North Texas Contracting, Inc., is in compliance with the City's MVJBE Ordinance by committing to 23 percent MIWBE participation. The City's goal on this project is 17 percent. In addition to the contract cost, $30,000.00 is required for construction staking, project management, material testing and inspection and $31,000.00 is provided for project contingencies. M The project is located in COUNCIL DISTRICTS 3 and 9. FISCAL INFORMATIONICERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. TO Fund /Account Qenjers FROM Fund/Account/Centers P275 5412QO 703170102287 $1,029.708.20 Sybmitted for City Manager's ffic by: Fernando Costa (6122) Originaling Department Head: S. Frank Crumb (6207) Additional Informatlon Contact: David L. Cooper (8252) f ] ATTA HC MENTS 60SSM21 OP2-NTC MAP. dl W r-1 RM ■w M M M FORT WORTH. FORT WORTII WATER DEPARTMENT ADDENDUM NO. 1 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR Clear Fork Drainage Basin iM -210 Sewer Improvements — Part 2 City Project No. 01022 and D.O.E. Project No. 6087 File # X -21801 Sewer Project No.: P275-703170102287 Water Project No.: P265- 603170102287 ADDENDUM NO. 1 Dated. March 12, 2012 REVISED BID OPENING DATE: April 5, 2412 Addendum No. 1 forms a part of the Contract Documents referenced above and modifies the Original Contract Documents and Plans. Acknowledge receipt of this Addendum in the space provided in the Bid Form Section 00 41 00, page 3 of 3 and on the outer envelope of your bid. Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification. A cony of this Addendum is available on the City of Fort Worth Buzzsaw Website. MODIFICATIONS TO DIVISION 00 — SECTION 00 11 13 INVITATION TO BIDDERS: I. THE BID OPENING DATE IS HEREBY REVISED TO APRIL 5, 2012 amending page 1 of the Invitation to Bidders to now read- "1:341 PM Thursday, April 5,2012". — 2. PRE -BID CONFERENCE DATE IS HEREBY REVISED TO MARCH 22, 2012 amending page 1 of the Invitation to Bidders to now react: "DATE: 3122112 ". _ Aft other provisions of the plans, specifications and contract documents for the project which are not expressly upended herein shall remain in full force and effect. Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering the bid non - responsive. A signed copy of this addendum shall be placed into SECTION 00 05 15 - ADDENDA of the proposal at the time of the bid submittal. RECEIPT ACKNOWLE GED: Tony Sholola, P -E., Engineering Manager — Fay : 13 y : � .._ .— — -- - -- ..._- - Company: dlN ��r +-► David L. Cooper, P.E., Project Manager Addendum. No. l AJN Group, Inc. M Re leased: 3/1 2/2012 FORT WORTH. FORT WORTH WATER DEPARTMENT :ADDENDUM NO. 2 TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR Clear Fork Drainage Basin M -210 Sewer Improvements — Part 2 City Project No. 01022 and D.D.E. Project No. 6807 File # X -21801 Sewer Project No.: P275-703170102287 Water Project No.: 1"265-603170102287 ADDENDUM NO. 2 Dated: March 30, 2012 Addendum No. 2 forms a part of the Contract Documents referenced above and modifies the Original Contraet Documents and Plans. Acknowledge reeeipt of this Addendum in the spaee provided in the Bid Form Section 00 41 00, page 3 of 3 and on the outer envelope of your bid. _ Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification, A copy of this Addendum its attachments and a Pdated referenee materials are available on the C i t of Fort Worth Bttzzsaw Website. MODIFICATIONS TO DIVISION 00 GENERAL CONDITIONS 1. SECTION 00 11 13 - INVITATION TO BIDDERS: SECTION 00 11 13 INVITATION TO BIDDERS (pages 1 and 2) is replaced entirely with the new SECTION 00 11 13 INVITATION TO BIDDERS released under Addendum No. 2 on 3 -30 -I2 (see attaehed). Tile revised document reflects corrections and changes to the following: Bid date changres (page 1, lisle 10), GENERAL DECRIPTION OF fVORK (page 1, lines 16 thrrjugh 24) y PREBID CONFERENCE changes (purge 1, line 41) CITY'S RIGHT TO ACCEPT OR REJECT BIDS (Page 2, lines 6 through 8) 2. SECTION 00 3513 - CONFLICT OF INTEREST FORM: SECTION 00 35 13 CONFLICT OF INTEREST FORM is replaced entirely with the new SECTION 00 35 13 CONFLICT OF INTEREST FORM released under Addendum No. 2 on 3 -30 -12 (see attached). 3. SECTION 00 41 00 - BID FORM: SECTION 00 4100 BID FORM is replaced entirely with the new SECTION 00 41 00 BID FORM released under Addendum No. 2 on 3 -30 -12 (see attached). w 4. SECTION 00 42 43 - PROPOSAL FORNI: SECTION 40 42 43 PROPOSAL FORM is replaced entirely with the new SECTION 00 42 43 PROPOSAL FORM released under Addendum No. 2 on 3 -30 -12 (see attached). M -210 Part 2 •:addendum. No. 2 RJ N Gmup, Inc. Me Issued: 3/30/2012 FORTWORTH. MODIFICATIONS TO DIVISION 33 UTILITIES I. SECTION 33 41 11 - HDPE STORM DRAIN PIPE: SECTION 33 41 11 HDPE STORM DRAIN PIPE specification is added to the DIVISION 33 -- UTILITES section of the Contract Documents to address alternate storm sewer pipe materials under Addendum No. 2 on 3 -30 -12 w (see attached). 2. THERMOPLASTIC PROFILE -WALL PIPE ACCEPTANCE LETTER: A T14ERMOPLAS "TIC PROFILE -WALL PIPE ACCEPTANCE LETTER from the Fort Worth Department of Transportation and Public Works (TPW) is added to the end of the DIVISION 33 - UTILITES, SECTION 33 41 11 of the Contract Documents to address alternate srortn sc%vcr pipe materials under Addendum No. 2 on 3- 30.12 (see attached). MODIFICATIONS TO SPECIAL SPECIFICATIONS am 1. SPECIAL SPECIFICATIONS: The entire section of SPECIAL SPECIFICATIONS is replaced with the new SPECIAL SPECIFICATIONS document released under Addendum No. 2 on 3 -30 -12 (see attached). 2. SPECIAL SPECIFICATIONS: The 150 CFS Peak Flow Nutrient Rein ova I Baffle Box Detail is replaced by the new 120 CFS Peak Flow Nutrient Removal Baffle Box Detail sheet and Specifications and Notes sheet released under Addendum No. 2 on 3 -30-(2 (see attached). MODIFICATIONS TO STANDARD DETAILS I S LQrm Water, Traffic Control & Pavi»P_ Details) I. STANDARD DETAILS (Storm Water): Duc to the consideration of Alternate Pipe materials for storm sewcrs on this project, the D -022 CORRUGATED DUAL WALL THROMOPLASTIC PIPE TRENCH INSTALLATION DETAIL has been added to the STANDARD DETAILS (Storm Watcr, Traffic Control & Paving Details) section of the Contract Documents and released under Addendum No. 2 on 3 -30 -12 (see attached). `'IODIFICATIONS TO Appendix GC -4.02 Subsurface and Physical Conditions I. A 3pendix GC -4.02 Subsurfnce .Ind Physical Conditions: The November 2011 draft geotechnical engineering report included in this section is replaced cntirely with the new Geotechnical Engineering Report— M -210 Sewer Improvements and Con firmntion Borings dated March 12, 2012 under Addendum No. 2 on 3 -30 -12 (see attached). 2. Appendix GC -4.02 Suh%urrace and Ph sicat Conditions: The City of Fort Worth Soil Lab Services Report for M -2 10 Projccl pavement cores is being added to the _Appendix GC -4.02 Subsurface and Physical Conditions section of the Contract Documents under Addendum No. 2 on 3 -30 -12 (see attached). NI 10 Part 2 - :Addendum. No. 2 RJN Group, Inc. up Issued: 313 0124 1 2 FORT NORTH. tMODIFICATIONS TO Appendix GC- 6.46.1) Minority and Woman Owned Business Enter rise Compliance 1. A endix GC- 6.06.1) Minority and Woman Owned Business Enterprise Compliance. Pages 1 or the SubcontractorsiSuppIiers Utilization, the Prime Contractor Waiver, and the Good Faith Effort Forms have been replaced with a new page I ror the Subcontractors/Suppliers Utilization Form, a new page 1 for the Prime Contraetor Waiver Form, and a new page I for the Good Faith Effort Form under Addendum No. 2 on 3 -30 -12 (see attached). + MODIFICATIONS TO THE CONSTRUCTION PLANS + 1. CLARIFICATION: APPROVED SEWER PIPE MATERIALS. + For this project, it has been determined that no prnjile wall pipe material will be allowed. Since,jiberglass reinforced pipe (FRP) was used on Part 1, it was decided that the Part 2 bidders shall only use Citi, Approved, solicl ivalled FRP pipe materials far the + 11-210 interceptor. However, the bidders crre .still required to clearly indicate which pipe materials are being proposed for use on this project in the Proposal Farm as necessary. Failure to elo so could result in brdcler disqualification. + 2. CONSTRUCTION PLAN MODIFICATIONS: The following Plan Sheets have been modified to address Parks and Community Services Department ( PACSD) concems, storm water + and sanitary sewer design modifications and related notechanges: Sheet 2 — General Notes: PACSD Construction & Tree Damage Penalties notes were added Sheet 4 — M -210 R* Plan Profile: Sewer and storm sewer design modifications & note added Sheet 5 — M -210 R* Plan Profile: Sewer and storm sewer design modifications & note added Sheet 6 — M -210 R* Line A Plan Profile & +MH Details: Sanitory sewer caIIout change Sheet 7 — Storm Sewer Modifications: Storm sewer design modifications & notes added Sheet 8 — SWPPP— Forest Park: flan modifications for PACSD & notes added Sheet 12 — Pavement Restoration Plan: Inclusion of concrete pavement restoration & storm sewer design modifications & related notes added Sheet 13 — Colonial Parkway 54"' Storm Sewer Ad'ustments: Storm sewer design ~ modifications & notes added For your convenience, we have integrated these changes into a new comprehensive construction plan file and a specification revisions file summary For downloading from the City of'Fort Worth SuzzSaw site under the ADDENDtJN11t NO. 2 directory. All revised construction plans are released under Addendum No. 2 on 3- 30 -12. All other provisions of the plans, specifications and contract ducurnents For the project which are not expressly amended herein shall remain in t'ull force and effect. + M -210 Part 2 - Addendum. No. 2 RJN Group, Inc. EN Issued: 3/30/2012 w FORT WORTH. - Failure to return a signed copy of the addendum with the proposal shall he grounds for rendering the bid non - responsive. A signed copy of this addendum shall be placed into DIVISION 00— GENERA L CONDITIONS, SECTION 00 05 IS — .-ADDENDA of the proposal at the time of the bid submittal. RECEIPT ACKNOWLEDGED" Tony Sholola, P.E., Engineering Manager By: t/ By: Company: i _ David L. Cooper, P.E., Project Manager 4M In W M -210 Part 2 - Addendum. No. 2 4 Issued; 3/30/2012 RJN Group, Inc. M we M MW EL-7 ■. .. low i 00 i2 43 - I Aarecnw, al Vage 1 or 4 1 SECTION 00 52 43 2 ,AGREEMENT 3 THIS AGREEMENT, authorized on June 12, 2012, is made by and between the City of Fort -4 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, 5 ( "City"), and NORTH TEXAS CONTRACTING Inc., authorized to do business in Texas, acting 6 by and through its duly authorized representative, ("Contractor'). 7 City and Contractor, in consideration of the mutual covenants hereiriatter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the I 1 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Clear Fork Draix uge Basrrr XI -2!f] Sewer by rovewerrrs- Part 2 16 DUE if 6807 CV Proieet,Vu nber 01022 17 Article 3. CONTRACT TIME 18 3.1 Time is oft he essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract, 21 3.2 Final Acceptance. 22 The Work wili be complete for f=inal Acceptanee within 180 days aver the date when the 23 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 24 3.3 Liquidated damages 25 Contractor recognizes that time is of the essence of this Agreement and that City will 26 suffer financial loss if the Work is not completed within the times specified in Paragraph 27 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 28 General Conditions. The Contractor also recognizes the delays, expense and difficulties 29 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 30 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 31 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 32 City Three Thurr.>ivad- Dollars ($3 000) for each day that expires after the time specified 33 in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 34 Acceptance. CITY Of FOR r wr)R PH t'lrar Pork Ora Fmi je Basin ,tit -210 Sesser Improvement-1 - Puri ? SrANDARD CONSTRUC PION SPEC I FICA] [ON DOCU,NIFNTS 0n- Prajecl Numbrr01022 Revised June 4, 2012 C1l'Y OF FOR'r WORT} t ('leer Fork Draenage Basin .11 -214 Seiver Improvrmenls - Pur! 2 STANDARD C'ONSTRUC'r10N SPECIFICATION LX- )CUMENTS Ciry Projerr Number 01022 Revised tune 4. 2012 005243 -2 ,Iereement Pav,e 2 of 4 35 Article 4. CONTRACT PRICE 36 City agrees to pay Contractor for performance of the Work in accordance with the Contract 37 Documents an amount in current funds of One Million Twenty Nine Thousand Seven Hundred 38 and Eight Dollars and Twenty Cents (SI,029,708.20). 39 Article 5. CONTRACT DOCUMENTS 40 5.1 CONTENTS: 41 A.The Contract Documents which comprise the entire agreement between City and 42 Contractor concerning the Work consist of the fallowing: 43 1. This Agreement. 44 2. Attachments to this Agreement: 45 a. Bid Form 46 l) Proposal Form 47 2) Vendor Compliance to State Law Non - Resident Bidder 48 3) Prequalification Statement 49 4) State and Federal documents (prujecl.specr/ic) 50 b. Current Prevailing Wage Rate Table 51 c. Insurance ACORD Form(s) 52 d. Payment Bond 53 e. Performance Bond 54 K Maintenance Bond 55 g. Power of Attorney for the Bonds 56 h. Worker's Compensation Affidavit 57 i. M W BE Commitment Form 58 3. General Conditions. 59 4. Supplementary Conditions. 60 5. Specifications specifically made a part of the Contract Documents by attachment 61 or, if not attached, as incorporated by reference and described in the 'Table of _ 62 Contents of the Project's Contract Documents. 63 6, Drawings. 64 7. Addenda. 65 8. Documentation submitted by Contractor prior to Notice of Award. 66 9. The following which may be delivered or issued after the Effective Date of the 67 Agreement and, if issued, become an incorporated part of the Contract Documents: 68 a. Notice to Proceed. 69 b. Field Orders. 70 c. Change Orders. 71 d. Letter of Final Acceptance. 72 73 C1l'Y OF FOR'r WORT} t ('leer Fork Draenage Basin .11 -214 Seiver Improvrmenls - Pur! 2 STANDARD C'ONSTRUC'r10N SPECIFICATION LX- )CUMENTS Ciry Projerr Number 01022 Revised tune 4. 2012 CITY OF FORT woRTH Cftwr Fork Drainage Basin ,t1 -210 Sewer lmprovemenrs - Awl 2 Im STANDARD CONSTRUCTION SPFCIFICATION D(]CUMI:NTS C1 Project :Vumher 01022 Revised lune 4, 2012 005243 -3 Agreement Pave 3 of4 74 Article 6. INDEMNIFICATION 75 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 76 expense, the city, its officers, servants and employees, from and against any and all 77 claims arising out of, or alleged to arise out of, the work and services to he performed _ 78 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 79 under this contract. This indemnification provision is specifically intended to operate 80 and be effective even if it is alleged or vroven that all or some of the dame es bein 81 sou ht were caused in whole or in part, by any net omission or ne li enee of the city 82 This indemnity provision is intended to include, without limitation, indemnity for 83 costs, expenses and legal fees incurred by the city in defending against such claims and 84 causes of actions. 85 86 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 87 the city, its officers, servants and employees, from and against any and all loss, damage 88 or destruction of property of the city, arising out of, or alleged to arise out of, the work 89 and services to be performed by the contractor, its officers, agents, employees, 90 subcontractors, licensees or invitees under this contract. This indemnification 91 provision is specifically intended to operate and be effective even if it is alleged or 92 proven that all or some of the damages being so_ ught were caused, in whole or in part, 93 by any act omission or ne li enee of the city. 94 95 Article 7. MISCELLANEOUS 96 7.1 Terms. 97 Terms used in this Agreement which are defined in Article 1 of the General Conditions will ■. 98 have the meanings indicated in the General Conditions. 99 7.2 Assignment of Contract. 100 This Agreement, including all of the Contract Documents may not be assigned by the 101 Contractor without the advanced express written consent of the City. 102 7.3 Successors and Assigns. ` 103 City and Contractor each binds itself, its partners, successors, assigns and legal 104 representatives to the other party hereto, in respect to all covenants, agreements and 105 obligations contained in the Contract Documents. 106 7.4 Severability. 107 Any provision or pert of the Contract Documents held to be unconstitutional, void or 108 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 109 remaining provisions shall continue to be valid and binding upon CITY and 110 CONTRACTOR. 111 7.5 Goveming Law and Venue. 112 This Agreement, including all of the Conlract Documents is performable in the State of 113 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 114 Northern District of "texas, Fort Worth Division. CITY OF FORT woRTH Cftwr Fork Drainage Basin ,t1 -210 Sewer lmprovemenrs - Awl 2 Im STANDARD CONSTRUCTION SPFCIFICATION D(]CUMI:NTS C1 Project :Vumher 01022 Revised lune 4, 2012 go M Un 00 ;2 43 -4 •lereemenl Page 4 ❑f4 1 15 7.6 Other Provisions. 116 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 117 classified, promulgated and set out by the City, a copy of which is attached hereto and [is made a part hereof the same as if it were copied verbatim herein. 119 7.7 Authority to Sign. 120 Contractor shall Attach evidence of authority to sign ,Agreement, if other than duly 121 authorized signatory of the Contractor. 122 123 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple 124 counterparts. 125 126 This Agreement is effective as of the last lute signed by the Parties (-E ffec t i ve Date"). 127 1`n n f rn r Fnr- zoy4t 7Z% r u Ef- (Printed Name) City of Fort Worth Fernando Costa Assistant City Manager Dale 711.711 Attest: City. A 110 aO (Seal) NQ IL O �n Title: 1� K1 1 7.. U7C7 Address: Inv-. IvIBcC L - z s666 Date: 6 -1 T - I a- City /State /Zip: rr. ,-73C qLeZqg _ ppro as to Form and Legality: U- - EA 4�: -- Date DOUglas W. Black Assistant City Attorney 128 129 130 APP VAL RECOMMENDED: 131 132 133 1 _ 134 I rcink C:'rrunh — -- 135 DIRECTOR, 136 Water Deparinient 137 C11 Y OF FORT WORTH Clear Fork Drainage Basin ,V -210 Sewer Improvements - Purl 2 +� STANDARD CONSI RUCI ION S PFC. IFICATION WC.UMENTS C ay Prolecr Xwmber 01022 Revised !uric 4 . -11012 x