r CONTRACT DOCUMENTS
r
i
CLEAR FORK DRAINAGE BASIN
In M -210 SEWER IMPROVEMENTS — PART 2
Sewer Project Number P275- 703170102287
pa Water Project Number P265- 603170102287
DOE # 6807
In
X -21801
P0 CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
in
RJN GROUP, INC.
CONSULTING ENGINEERS
FORT WORTH, TEXAS
W March 1, 2012
PW
Im
ps
Im
r
CONTRACT DOCUMENTS
CLEAR FORK DRAINAGE BASIN
M -210 SEWER IMPROVEMENTS - PART 2
SEWER PROJECT NUMBER P275- 703170102287
WATER PROJECT NUMBER P265- 603170102287
DOE # 6807
File # X -21801
City Project # 01022
FW March 1, 2012
w
Y hereby state that these Contract Documents
were prepared under my direct supervision and
that I am a duly Registered Professional
Engineer under the laws of the State of
Texas.
r
an
ON
�a�aaarr►>>�'
OP
CHRIS ERIC. BROOKS
i . 67697 : W :
�
♦ o •. -gyp D:4.w
t++ ONAL
Chris Eric Brooks
Date. March 1, 2012 Registration No. 67697
in
CITY COUNCIL AGENDA
COUNCIL ACTION: Approved on 6112/2012
']foal sfle o! Ihr. City rA Fa' Worth, ruas
FORT WORTII
DATE: 6/12/2012 REFERENCE NO.: C -25666 LOG NAME: 60SSM21OP2 -NTC
CODE: C TYPE: NON- CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of a Contract with North Texas Contracting, Inc., in the Amount of
$1,029,708.20 for Clear Fork Drainage Basin M -210 Sanitary Sewer Improvements, Part
2, on Colonial Parkway and Rogers Road (COUNCIL DISTRICTS 3 and 9)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of a contract with North Texas
Contracting, Inc,, in the amount of $1,029,708.20 for Clear Fork Drainage Basin M -210 Sanitary Sewer
Improvements, Part 2.
DISCUSSION:
On April 13, 2010, (M&C C- 24176) the City Council authorized the City Manager to execute an
engineering Agreement with RJN Group, Inc., for the preparation of plans and specifications for Clear
Fork Drainage Basin M -210 Sanitary Sewer Improvements. The purpose of this project is to eliminate
sanitary sewer overflows in compliance with the Texas Commission on Environmental Quality (TCEQ)
' Sanitary Sewer Overflow Initiative.
The Construction of Part 1 of the project was completed in April 2012. This project, Part 2, is a
continuation of Part 1 and consists of the installation of approximately 1,400 feet of 42 -inch and 36 -inch
sewer line in Colonial Parkway. The project was advertised for bid on March 1, 2012 and March 8, 2012
in the Fart Worth Star- Telegrpm. On April 5, 2012, the following bids were received:
Alternate B allowed for HOPE pipe to be used as an alternative to concrete pipe for the storm drain pipe
adjustments. Bids for Alternative B marked with an ' were declared unresponsive. Staff has elected to
use Alternate A bids for the award of this contract.
MIWBE - North Texas Contracting, Inc., is in compliance with the City's MVJBE Ordinance by committing
to 23 percent MIWBE participation. The City's goal on this project is 17 percent.
In addition to the contract cost, $30,000.00 is required for construction staking, project management,
material testing and inspection and $31,000.00 is provided for project contingencies.
Alternate A
Alternate B
(Concrete Pipe)
(HDPE Pipe)
Bidder
Amount
Amount
Time of Corn letion
North Texas
$1,029,708.20
$1,028,128.20
180 Calendar Days
Contracting, Inc.
S.J. Louis Construction
$1,035,994.32
$1,032,834.32
of Texas, LTD
Wright Construction
$1,112,763.95
$1,1 12,763.95
Co., Inc.
Jackson Construction,
$1,287,970.50
NO BID
Ltd.
Gin -S en Inc.
$1,297,841.00
3 641.00
ARK Contracting
$1,421,060.00
t$1,421,060.00
Services LLC
Alternate B allowed for HOPE pipe to be used as an alternative to concrete pipe for the storm drain pipe
adjustments. Bids for Alternative B marked with an ' were declared unresponsive. Staff has elected to
use Alternate A bids for the award of this contract.
MIWBE - North Texas Contracting, Inc., is in compliance with the City's MVJBE Ordinance by committing
to 23 percent MIWBE participation. The City's goal on this project is 17 percent.
In addition to the contract cost, $30,000.00 is required for construction staking, project management,
material testing and inspection and $31,000.00 is provided for project contingencies.
M
The project is located in COUNCIL DISTRICTS 3 and 9.
FISCAL INFORMATIONICERTIFICATION:
The Financial Management Services Director certifies that funds are available in the current capital
budget, as appropriated, of the Sewer Capital Projects Fund.
TO Fund /Account Qenjers FROM Fund/Account/Centers
P275 5412QO 703170102287 $1,029.708.20
Sybmitted for City Manager's ffic by: Fernando Costa (6122)
Originaling Department Head: S. Frank Crumb (6207)
Additional Informatlon Contact: David L. Cooper (8252)
f ]
ATTA HC MENTS
60SSM21 OP2-NTC MAP. dl
W
r-1
RM
■w
M
M
M
FORT WORTH.
FORT WORTII WATER DEPARTMENT
ADDENDUM NO. 1
TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR
Clear Fork Drainage Basin iM -210 Sewer Improvements — Part 2
City Project No. 01022 and D.O.E. Project No. 6087
File # X -21801
Sewer Project No.: P275-703170102287
Water Project No.: P265- 603170102287
ADDENDUM NO. 1
Dated. March 12, 2012
REVISED BID OPENING DATE: April 5, 2412
Addendum No. 1 forms a part of the Contract Documents referenced above and modifies the
Original Contract Documents and Plans. Acknowledge receipt of this Addendum in the space
provided in the Bid Form Section 00 41 00, page 3 of 3 and on the outer envelope of your bid.
Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification.
A cony of this Addendum is available on the City of Fort Worth Buzzsaw Website.
MODIFICATIONS TO DIVISION 00 — SECTION 00 11 13 INVITATION TO BIDDERS:
I. THE BID OPENING DATE IS HEREBY REVISED TO APRIL 5, 2012 amending
page 1 of the Invitation to Bidders to now read- "1:341 PM Thursday, April 5,2012".
— 2. PRE -BID CONFERENCE DATE IS HEREBY REVISED TO MARCH 22, 2012
amending page 1 of the Invitation to Bidders to now react: "DATE: 3122112 ".
_ Aft other provisions of the plans, specifications and contract documents for the project which are
not expressly upended herein shall remain in full force and effect.
Failure to return a signed copy of the addendum with the proposal shall be grounds for rendering
the bid non - responsive. A signed copy of this addendum shall be placed into SECTION 00 05 15
- ADDENDA of the proposal at the time of the bid submittal.
RECEIPT ACKNOWLE GED: Tony Sholola, P -E., Engineering Manager
—
Fay : 13 y :
� .._ .— — -- - -- ..._- -
Company: dlN ��r +-► David L. Cooper, P.E., Project Manager
Addendum. No. l
AJN Group, Inc.
M
Re leased: 3/1 2/2012
FORT WORTH.
FORT WORTH WATER DEPARTMENT
:ADDENDUM NO. 2
TO THE PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS FOR
Clear Fork Drainage Basin M -210 Sewer Improvements — Part 2
City Project No. 01022 and D.D.E. Project No. 6807
File # X -21801
Sewer Project No.: P275-703170102287
Water Project No.: 1"265-603170102287
ADDENDUM NO. 2
Dated: March 30, 2012
Addendum No. 2 forms a part of the Contract Documents referenced above and modifies the
Original Contraet Documents and Plans. Acknowledge reeeipt of this Addendum in the spaee
provided in the Bid Form Section 00 41 00, page 3 of 3 and on the outer envelope of your bid.
_ Failure to acknowledge receipt of this Addendum could subject the bidder to disqualification,
A copy of this Addendum its attachments and a Pdated referenee materials are available on the C i t
of Fort Worth Bttzzsaw Website.
MODIFICATIONS TO DIVISION 00 GENERAL CONDITIONS
1. SECTION 00 11 13 - INVITATION TO BIDDERS: SECTION 00 11 13 INVITATION TO
BIDDERS (pages 1 and 2) is replaced entirely with the new SECTION 00 11 13 INVITATION
TO BIDDERS released under Addendum No. 2 on 3 -30 -I2 (see attaehed). Tile revised
document reflects corrections and changes to the following:
Bid date changres (page 1, lisle 10),
GENERAL DECRIPTION OF fVORK (page 1, lines 16 thrrjugh 24)
y PREBID CONFERENCE changes (purge 1, line 41)
CITY'S RIGHT TO ACCEPT OR REJECT BIDS (Page 2, lines 6 through 8)
2. SECTION 00 3513 - CONFLICT OF INTEREST FORM: SECTION 00 35 13 CONFLICT
OF INTEREST FORM is replaced entirely with the new SECTION 00 35 13 CONFLICT OF
INTEREST FORM released under Addendum No. 2 on 3 -30 -12 (see attached).
3. SECTION 00 41 00 - BID FORM: SECTION 00 4100 BID FORM is replaced entirely with
the new SECTION 00 41 00 BID FORM released under Addendum No. 2 on 3 -30 -12 (see
attached).
w
4. SECTION 00 42 43 - PROPOSAL FORNI: SECTION 40 42 43 PROPOSAL FORM is
replaced entirely with the new SECTION 00 42 43 PROPOSAL FORM released under
Addendum No. 2 on 3 -30 -12 (see attached).
M -210 Part 2 •:addendum. No. 2
RJ N Gmup, Inc.
Me
Issued: 3/30/2012
FORTWORTH.
MODIFICATIONS TO DIVISION 33 UTILITIES
I. SECTION 33 41 11 - HDPE STORM DRAIN PIPE: SECTION 33 41 11 HDPE STORM
DRAIN PIPE specification is added to the DIVISION 33 -- UTILITES section of the Contract
Documents to address alternate storm sewer pipe materials under Addendum No. 2 on 3 -30 -12
w (see attached).
2. THERMOPLASTIC PROFILE -WALL PIPE ACCEPTANCE LETTER: A
T14ERMOPLAS "TIC PROFILE -WALL PIPE ACCEPTANCE LETTER from the Fort Worth
Department of Transportation and Public Works (TPW) is added to the end of the DIVISION 33
- UTILITES, SECTION 33 41 11 of the Contract Documents to address alternate srortn sc%vcr
pipe materials under Addendum No. 2 on 3- 30.12 (see attached).
MODIFICATIONS TO SPECIAL SPECIFICATIONS
am
1. SPECIAL SPECIFICATIONS: The entire section of SPECIAL SPECIFICATIONS is replaced
with the new SPECIAL SPECIFICATIONS document released under Addendum No. 2 on
3 -30 -12 (see attached).
2. SPECIAL SPECIFICATIONS: The 150 CFS Peak Flow Nutrient Rein ova I Baffle Box Detail
is replaced by the new 120 CFS Peak Flow Nutrient Removal Baffle Box Detail sheet and
Specifications and Notes sheet released under Addendum No. 2 on 3 -30-(2 (see attached).
MODIFICATIONS TO STANDARD DETAILS
I S LQrm Water, Traffic Control & Pavi»P_ Details)
I. STANDARD DETAILS (Storm Water): Duc to the consideration of Alternate Pipe materials
for storm sewcrs on this project, the D -022 CORRUGATED DUAL WALL
THROMOPLASTIC PIPE TRENCH INSTALLATION DETAIL has been added to the
STANDARD DETAILS (Storm Watcr, Traffic Control & Paving Details) section of the Contract
Documents and released under Addendum No. 2 on 3 -30 -12 (see attached).
`'IODIFICATIONS TO Appendix GC -4.02 Subsurface and Physical Conditions
I. A 3pendix GC -4.02 Subsurfnce .Ind Physical Conditions: The November 2011 draft
geotechnical engineering report included in this section is replaced cntirely with the new
Geotechnical Engineering Report— M -210 Sewer Improvements and Con firmntion Borings
dated March 12, 2012 under Addendum No. 2 on 3 -30 -12 (see attached).
2. Appendix GC -4.02 Suh%urrace and Ph sicat Conditions: The City of Fort Worth Soil Lab
Services Report for M -2 10 Projccl pavement cores is being added to the _Appendix GC -4.02
Subsurface and Physical Conditions section of the Contract Documents under Addendum No. 2
on 3 -30 -12 (see attached).
NI 10 Part 2 - :Addendum. No. 2
RJN Group, Inc.
up
Issued: 313 0124 1 2
FORT NORTH.
tMODIFICATIONS TO
Appendix GC- 6.46.1) Minority and Woman Owned Business Enter rise Compliance
1. A endix GC- 6.06.1) Minority and Woman Owned Business Enterprise Compliance.
Pages 1 or the SubcontractorsiSuppIiers Utilization, the Prime Contractor Waiver, and the Good
Faith Effort Forms have been replaced with a new page I ror the Subcontractors/Suppliers
Utilization Form, a new page 1 for the Prime Contraetor Waiver Form, and a new page I
for the Good Faith Effort Form under Addendum No. 2 on 3 -30 -12 (see attached).
+
MODIFICATIONS TO THE CONSTRUCTION PLANS
+ 1. CLARIFICATION:
APPROVED SEWER PIPE MATERIALS.
+ For this project, it has been determined that no prnjile wall pipe material will be
allowed. Since,jiberglass reinforced pipe (FRP) was used on Part 1, it was decided that
the Part 2 bidders shall only use Citi, Approved, solicl ivalled FRP pipe materials far the
+ 11-210 interceptor. However, the bidders crre .still required to clearly indicate which pipe
materials are being proposed for use on this project in the Proposal Farm as necessary.
Failure to elo so could result in brdcler disqualification.
+
2. CONSTRUCTION PLAN MODIFICATIONS: The following Plan Sheets have been
modified to address Parks and Community Services Department ( PACSD) concems, storm water
+
and sanitary sewer design modifications and related notechanges:
Sheet 2 — General Notes: PACSD Construction & Tree Damage Penalties notes were added
Sheet 4 — M -210 R* Plan Profile: Sewer and storm sewer design modifications & note added
Sheet 5 — M -210 R* Plan Profile: Sewer and storm sewer design modifications & note added
Sheet 6 — M -210 R* Line A Plan Profile & +MH Details: Sanitory sewer caIIout change
Sheet 7 — Storm Sewer Modifications: Storm sewer design modifications & notes added
Sheet 8 — SWPPP— Forest Park: flan modifications for PACSD & notes added
Sheet 12 — Pavement Restoration Plan: Inclusion of concrete pavement restoration & storm
sewer design modifications & related notes added
Sheet 13 — Colonial Parkway 54"' Storm Sewer Ad'ustments: Storm sewer design
~ modifications & notes added
For your convenience, we have integrated these changes into a new comprehensive construction plan
file and a specification revisions file summary For downloading from the City of'Fort Worth SuzzSaw
site under the ADDENDtJN11t NO. 2 directory. All revised construction plans are released under
Addendum No. 2 on 3- 30 -12.
All other provisions of the plans, specifications and contract ducurnents For the project which are
not expressly amended herein shall remain in t'ull force and effect.
+
M -210 Part 2 - Addendum. No. 2
RJN Group, Inc.
EN
Issued: 3/30/2012
w
FORT WORTH.
-
Failure to return a signed copy of the addendum with the proposal shall he grounds for rendering
the bid non - responsive. A signed copy of this addendum shall be placed into DIVISION 00—
GENERA L CONDITIONS, SECTION 00 05 IS — .-ADDENDA of the proposal at the time of the
bid submittal.
RECEIPT ACKNOWLEDGED" Tony Sholola, P.E., Engineering Manager
By: t/ By:
Company: i _ David L. Cooper, P.E., Project Manager
4M
In
W
M -210 Part 2 - Addendum. No. 2 4 Issued; 3/30/2012
RJN Group, Inc.
M
we
M
MW
EL-7
■.
..
low
i
00 i2 43 - I
Aarecnw, al
Vage 1 or 4
1 SECTION 00 52 43
2 ,AGREEMENT
3 THIS AGREEMENT, authorized on June 12, 2012, is made by and between the City of Fort
-4 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager,
5 ( "City"), and NORTH TEXAS CONTRACTING Inc., authorized to do business in Texas, acting
6 by and through its duly authorized representative, ("Contractor').
7 City and Contractor, in consideration of the mutual covenants hereiriatter set forth, agree as
8 follows:
9 Article 1. WORK
10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the
I 1 Project identified herein.
12 Article 2. PROJECT
13 The project for which the Work under the Contract Documents may be the whole or only a part is
14 generally described as follows:
15 Clear Fork Draix uge Basrrr XI -2!f] Sewer by rovewerrrs- Part 2
16 DUE if 6807 CV Proieet,Vu nber 01022
17 Article 3. CONTRACT TIME
18 3.1 Time is oft he essence.
19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract
20 Documents are of the essence to this Contract,
21 3.2 Final Acceptance.
22 The Work wili be complete for f=inal Acceptanee within 180 days aver the date when the
23 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
24 3.3 Liquidated damages
25 Contractor recognizes that time is of the essence of this Agreement and that City will
26 suffer financial loss if the Work is not completed within the times specified in Paragraph
27 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the
28 General Conditions. The Contractor also recognizes the delays, expense and difficulties
29 involved in proving in a legal proceeding the actual loss suffered by the City if the Work
30 is not completed on time. Accordingly, instead of requiring any such proof, Contractor
31 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay
32 City Three Thurr.>ivad- Dollars ($3 000) for each day that expires after the time specified
33 in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of
34 Acceptance.
CITY Of FOR r wr)R PH t'lrar Pork Ora Fmi je Basin ,tit -210 Sesser Improvement-1 - Puri ?
SrANDARD CONSTRUC PION SPEC I FICA] [ON DOCU,NIFNTS 0n- Prajecl Numbrr01022
Revised June 4, 2012
C1l'Y OF FOR'r WORT} t ('leer Fork Draenage Basin .11 -214 Seiver Improvrmenls - Pur! 2
STANDARD C'ONSTRUC'r10N SPECIFICATION LX- )CUMENTS Ciry Projerr Number 01022
Revised tune 4. 2012
005243 -2
,Iereement
Pav,e 2 of 4
35
Article 4. CONTRACT PRICE
36
City agrees to pay Contractor for performance of the Work in accordance with the Contract
37
Documents an amount in current funds of One Million Twenty Nine Thousand Seven Hundred
38
and Eight Dollars and Twenty Cents (SI,029,708.20).
39
Article 5. CONTRACT DOCUMENTS
40
5.1 CONTENTS:
41
A.The Contract Documents which comprise the entire agreement between City and
42
Contractor concerning the Work consist of the fallowing:
43
1. This Agreement.
44
2. Attachments to this Agreement:
45
a. Bid Form
46
l) Proposal Form
47
2) Vendor Compliance to State Law Non - Resident Bidder
48
3) Prequalification Statement
49
4) State and Federal documents (prujecl.specr/ic)
50
b. Current Prevailing Wage Rate Table
51
c. Insurance ACORD Form(s)
52
d. Payment Bond
53
e. Performance Bond
54
K Maintenance Bond
55
g. Power of Attorney for the Bonds
56
h. Worker's Compensation Affidavit
57
i. M W BE Commitment Form
58
3. General Conditions.
59
4. Supplementary Conditions.
60
5. Specifications specifically made a part of the Contract Documents by attachment
61
or, if not attached, as incorporated by reference and described in the 'Table of
_
62
Contents of the Project's Contract Documents.
63
6, Drawings.
64
7. Addenda.
65
8. Documentation submitted by Contractor prior to Notice of Award.
66
9. The following which may be delivered or issued after the Effective Date of the
67
Agreement and, if issued, become an incorporated part of the Contract Documents:
68
a. Notice to Proceed.
69
b. Field Orders.
70
c. Change Orders.
71
d. Letter of Final Acceptance.
72
73
C1l'Y OF FOR'r WORT} t ('leer Fork Draenage Basin .11 -214 Seiver Improvrmenls - Pur! 2
STANDARD C'ONSTRUC'r10N SPECIFICATION LX- )CUMENTS Ciry Projerr Number 01022
Revised tune 4. 2012
CITY OF FORT woRTH Cftwr Fork Drainage Basin ,t1 -210 Sewer lmprovemenrs - Awl 2
Im STANDARD CONSTRUCTION SPFCIFICATION D(]CUMI:NTS C1 Project :Vumher 01022
Revised lune 4, 2012
005243 -3
Agreement
Pave 3 of4
74
Article 6. INDEMNIFICATION
75
6.1
Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
76
expense, the city, its officers, servants and employees, from and against any and all
77
claims arising out of, or alleged to arise out of, the work and services to he performed
_
78
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
79
under this contract. This indemnification provision is specifically intended to operate
80
and be effective even if it is alleged or vroven that all or some of the dame es bein
81
sou ht were caused in whole or in part, by any net omission or ne li enee of the city
82
This indemnity provision is intended to include, without limitation, indemnity for
83
costs, expenses and legal fees incurred by the city in defending against such claims and
84
causes of actions.
85
86
6.2
Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
87
the city, its officers, servants and employees, from and against any and all loss, damage
88
or destruction of property of the city, arising out of, or alleged to arise out of, the work
89
and services to be performed by the contractor, its officers, agents, employees,
90
subcontractors, licensees or invitees under this contract. This indemnification
91
provision is specifically intended to operate and be effective even if it is alleged or
92
proven that all or some of the damages being so_ ught were caused, in whole or in part,
93
by any act omission or ne li enee of the city.
94
95
Article
7. MISCELLANEOUS
96
7.1
Terms.
97
Terms used in this Agreement which are defined in Article 1 of the General Conditions will
■.
98
have the meanings indicated in the General Conditions.
99
7.2
Assignment of Contract.
100
This Agreement, including all of the Contract Documents may not be assigned by the
101
Contractor without the advanced express written consent of the City.
102
7.3
Successors and Assigns.
`
103
City and Contractor each binds itself, its partners, successors, assigns and legal
104
representatives to the other party hereto, in respect to all covenants, agreements and
105
obligations contained in the Contract Documents.
106
7.4
Severability.
107
Any provision or pert of the Contract Documents held to be unconstitutional, void or
108
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
109
remaining provisions shall continue to be valid and binding upon CITY and
110
CONTRACTOR.
111
7.5
Goveming Law and Venue.
112
This Agreement, including all of the Conlract Documents is performable in the State of
113
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
114
Northern District of "texas, Fort Worth Division.
CITY OF FORT woRTH Cftwr Fork Drainage Basin ,t1 -210 Sewer lmprovemenrs - Awl 2
Im STANDARD CONSTRUCTION SPFCIFICATION D(]CUMI:NTS C1 Project :Vumher 01022
Revised lune 4, 2012
go
M
Un
00 ;2 43 -4
•lereemenl
Page 4 ❑f4
1 15 7.6 Other Provisions.
116 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is
117 classified, promulgated and set out by the City, a copy of which is attached hereto and
[is made a part hereof the same as if it were copied verbatim herein.
119 7.7 Authority to Sign.
120 Contractor shall Attach evidence of authority to sign ,Agreement, if other than duly
121 authorized signatory of the Contractor.
122
123 IN WITNESS WHEREOF, City and Contractor have executed this Agreement in multiple
124 counterparts.
125
126 This Agreement is effective as of the last lute signed by the Parties (-E ffec t i ve Date").
127
1`n n f rn r Fnr-
zoy4t 7Z% r u Ef-
(Printed Name)
City of Fort Worth
Fernando Costa
Assistant City Manager
Dale 711.711
Attest:
City.
A
110
aO
(Seal) NQ
IL
O
�n
Title: 1� K1 1 7.. U7C7
Address: Inv-.
IvIBcC L - z s666
Date: 6 -1 T - I a-
City /State /Zip: rr. ,-73C qLeZqg _ ppro as to Form and Legality:
U- - EA 4�: --
Date DOUglas W. Black
Assistant City Attorney
128
129
130 APP VAL RECOMMENDED:
131
132
133 1 _
134 I rcink C:'rrunh — --
135 DIRECTOR,
136 Water Deparinient
137
C11 Y OF FORT WORTH Clear Fork Drainage Basin ,V -210 Sewer Improvements - Purl 2
+� STANDARD CONSI RUCI ION S PFC. IFICATION WC.UMENTS C ay Prolecr Xwmber 01022
Revised !uric 4 . -11012
x