Loading...
HomeMy WebLinkAboutContract 43407C', , "� ETAI N, ciTY SWMARY coNTRACT NO. Lr� CW SCCMETARY 11 rl� D.O.E. FRE CC90RACK'A"S. BONCXNC- CO, ccNs"Imalo, N's COPY CUENI'DEPARTMENT PROJECT MANUAL CLIENT DEPARTMENT FOR THE CONSTRUCTJON OF Summei- Creelf D)lve (Risingv- Road to Star mei- Pw-k Drive) City Project No. 00997 TPW No. 0291 541200 206760099783 Betsy Price Mayor Tom Higgins City Imallager Douglas W. Wicisig, P.E. Director, Transportation and Public Works Department Prepared for The City of Fort Worth 2012 �5 17 �),Z Z- A, OFFICK1. RECO174,01 cirf, SECREI'ARY 1:,T,l VIORTHI'rX OF M &C Review Page 1 of 2 ,fl : .]I ,,Iro r)[ ! >,(, Cjr.+ )s nr- iv:ion I!. %r. ,, CITY COUNCIL AGENDA FoRT� 11 COUNCIL ACTION: Approved on 7/10/2012 REFERENCE 20SUMMER CREEK DATE: 7/1012012 NO.: **C-25693 LOG NAME: CONSTRUCTION CONATSER CODE: C TYPE: CONSENT PUBLIC NO N� SUBJECT: Authorize Execution of a Contract with Conatser Construction TX, LP, in the Amount of $766,736.95 for Pavement, Sidewalks, Street Lights and Drainage Improvements far Summer Creek Drive from Summer Park Drive to Risinger Road and Authorize Execution of Amendment No. 3 to an Engineering Agreement with Dunaway Associates, Inc_ City Secretary Contract No. 39970, in the Amount of $28,040.00 for the Provision of Construction Administration Services for this Project (COUNCIL DISTRICT 6) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with Conatser Construction TX, LP, in the amount of $766,736.95 for pavement, sidewalks, street lights, and drainage improvements along Summer Creek Drive from Summer Park Drive to Risinger Road and; 2. Authorize execution of Amendment No. 3 to an Engineering Agreement with Dunaway Associates, Inc., City Secretary Contract No. 39970, in the Amount of $28,040.00 for construction administration services including construction inspection, material testing, and surveying for this project. DISCUSSION: This Mayor and Council Communication authorizes two actions: 1. Execution of a construction contract providing for the construction of paving, sidewalks, street lights and drainage improvements along Summer Creek Drive from Summer Park Drive to Risinger Road. The construction will include two -lanes of concrete paving and a bike lane. The project was advertised on April 26, 2012 and May 3, 2012 in the Fort Worth Star - Telegram. The following bids were received on May 24, 2012: Bidder Amount Conatser Construction TX, L.P. $766,736.95 LB Contracting, LLC $894,746.42 McClendon Construction Co., Inc. $942,497.80 Jackson Construction, Ltd. $974,967.50 UI Contractors, LLG $1,114,319.10 In addition to the construction contract costs, funding in the amount of $79,260.00 will be utilized for City construction services including surveying review, real property services, material testing, and construction inspection. Dunaway Associates, LP, will be providing for the construction staking, material testing, and some engineering field services as described below, The City reserves the right to increase or decrease quantities of individual pay items within the construction contract, provided that the total contract amount remains within plus or minus 25 percent of the amount of the contract awarded by the City Council. http:// apps. cfwnet. org / council _packet /mc_review.asp ?ID =1... 7/11/2012 W r M &C Review Page 2 of 2 Conatser Construction TX, LP, is in compliance with the City's MMIBE Ordinance by committing to 20 percent MANBE participation. The City's goal on this project is 20 percent. 2. Execution of Amendment No. 3 to an Engineering Agreement with Dunaway Associates, L.P., in the amount of $28,040.00 providing funding for construction engineering field services to answer questions as construction progresses, material testing, construction surveying and construction staking for this project. On March 2, 2010, (M &C C- 24111) the City Council authorized the City Manager to execute an Engineering Agreement with Dunaway Associates, L.P., for Pavement Reconstruction and Water and Sanitary Sewer Main Replacements on Summer Creek and McPherson Boulevard in the amount of $444,283.00 which included this portion of Summer Creek Drive. This contract includes the following previous amendments: 1 Amendment No. 1 for $13,020.00, administratively approved February 14, 2011; and 2. Amendment No. 2 for $124,775.00, approved by M &C C- 24853, April 12, 2011. Dunaway Associates, L.P., agrees to maintain its initial MIWBE commitment of 25 percent that it made on the original Agreement and extend and maintain that same MIWBE commitment of 25 percent to all prior amendments up to and inclusive of this Amendment No. 3. Therefore Dunaway Associate, L.P., remains in compliance with the City's MIWBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MANBE Commitment form executed by an authorized representative of its company. The resultant total project cost will be $874,036.95 which will be paid for through the Special Funded Capital Projects Fund. This project is located in COUNCIL DISTRICT 6, MAPSCO 102R and 102V FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Specially Funded Capital Projects Fund. TO Fund /AccounlJCenters Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ATTACHMENTS Summer Creek Location- Exhibit.pdf FROM Fund /Account/Centers 1) C291 541200_ 2.06240099783 $766,736.95 2] C291_531200_?0.624.0099752 $91 500.00 2) 0291 531200. 206240099780 $5 U -0.00 2L 291 531200 206240099784 11.540.00 Fernando Costa (6122) Douglas W. Wiersig (7801) Patrick Buckley (2443) http://apps.cfwnet.org/ council _packet /mc_review.asp ?ID =l... 7/11/2012 CITY OF FORT WORTH TRANSPORTATION AND PUBLIC WORKS DEPARTMENT ADDENDUM NO. I SUMMER CREEK DRIVE (FROM RISINGER RD TO SUMMER PARK DR) - D.O.E. NO. 6856 CITY PROJECT NO. 00997 ADDENDUM RELEASE DATE: May 21, 2012 BIDS RECEIVED DATE: May 24, 2012 INFORMATION TO BIDDERS: The Plans, Specifications and Contract Documents for the above mentioned project are hereby revised and amended as follows: 1. A pre -bid meeting was held on 5/1112012 and the following items were discussed: a. MWBE goal to remain 20% as currently shown in the specification documents. b. Easements and ROW have not been obtained for this project as of yet. It is e1b, anticipated that they will be obtained prior to NTP being issued to the Contractor. c. For Clarification: The Contractor shall install the water meter per the City of Fort Worth Standards for the irrigation system as shown on the plans. All costs associated with the water service connection and meter installation is subsidiary to the irrigation Lump Sum Bid Item 9999.0110. d. For Clarification: The Contractor shall be responsible for purchasing all lighting material per the City's standard material specifications. The City will not make available for purchase any lighting material to the Contractor. e. For Clarification: Each D40 -9T double arm will consist of a pair of arms. f. Sign -in sheet from the pre -bid meeting is included with this addendum. 2. The following items are RFls that came up during bidding and the responses given: a Q: There is no pay item for conduit, yet there are two separate items for the some wire (one states "bore "). Is the conduit assumed to be subsidiary to the cable installation? A: Yes conduit is subsidiary to these two bid items. b. Q: There is no pay item for luminaires. Are these intended to be subsidiary to the illumination assembly (3441.3003) and arm (9999.0045) items? A. Yes luminaries are subsidiary to these bid items. c. Q: The quantity for the D40 -9T arm is 10ea, but there are only six existing single - arm poles that are being modified. A: This is correct, there are only 6 existing single grin poles being modified. The arms for the new illnmination assemblies are subsidiary to that item. So this bid item should be 6 not I0. d. Q: The seventh pay item in the lighting section is fnr 6ea "Street Light 33A Arm ", I don't see where any of this type arin would be used at all. The existing single fight that is being relocated on Quail Feather Dr. has a 33A arm, but this isn't being replaced, just relocated? A: This is correet, this bid itein should be completely deleted from the proposal section. e. Q: There are pay items for removing lights, and pay items for installing foundations and installing arms, but no pay item for actually relocating the light poles that are being removed and installed on the new foundations. Is this operation intended to be subsidiary to one of the other pay items? A: No this operation (i.e. removing and relocating the existing light poles to the new foundations) is ineluded in the bid item 3 441.3 502 "Street light pole removal and salvage" We will change this bid item name to "Remove and Relocate Ex Street light pole to new foundation ". 3. SECTION 00 42 43 Bid Noun PAVING Bid Item 3211.Q 13 8" Flex Base e A GR -1 485 SY is added to the Proect. 4. SECTION 00 42 43 Bid Form PAVJNG Bid Item 3471.0001 Traffic Control (Including Temporary HMAC &c Flex Base pavement) quantity is revised 3 ff0 jo 6M0. 5. SECTION 00 42 43 Bid Form LIGHTING Bid Item 3441.3003 Rdwy Illum Assembly TY 18,18A,19, and D -40 bid item descrintiorr revise, to include °;with lu ies er speci rcation 34 4L2a„ 6, SECTION 00 42 43 Bid Form LIGHTING Bid Item 3441.3404 2 -2 -2 -4 Quadplex Alum Elec Conductor bid item desabtion revised to include "with conduit ". 7. SECTION 00 42 43 Bid Form LIGHTING Bid Item 3441.3404 2 -2 -2 -4 Quadplex Alurn Elec Conductor (BORE) bid item description revised to include "wilb conduit_' S. SECTION 00 42 43 Bid Form U611TING Hid Item 3441.3502 Street Light Pole Removal and Salvage bid item descr' Lion revised to "RemovC and Relocate Ex Street li ht pole to new foundation". 9. SECTION 00 42 43 Bid Form LIGHTING Bid Item 9949.0045 Street Light D40 -9T Double Arm quantity is revised from 10 E4 to G EA and—bid item description r v •ed ro inc ude "with luminaries" 10. SECTION 00 42 43 Bid Form LIGITING Bid Item Street Light 33A Arm 6 EA deleted from project. 11. Replace entire proposal section with the version enclosed herein. (Revised excel spreadsheet has been posted to Buzzsaw) Addendum Igo. 1 r r Please acknowledge receipt of the Addendum in the following locations: (1) In the space provided below (2) In the amended Proposal (3) Indicate in upper case letters on the outside of the sealed bid envelope: "RECEIVED & ACKNOWLEDGED ADDENDUM NO. 1" Faiiure to acknowledge the receipt of Addendum No. 1 could cause the subject bidder to be considered "NON- RESPONSIVE ", restilting in disqualification. A signed copy of this addendum shall be placed into the proposal at the time of bid submittal. RECEIPT ACKNOWLEDGED: 0 Title: Addendum No. 1 I SECTION 00 52 43 2 AGREEMENT 3 AGREEMENT THIS AGREEMENT, is made by and between 4 The City of Forth Worth a home rule municipal corporation in the State of Texas, acting by and 5 throu its City Manager, hereinafter called City, and Conatser Construction TX- :1 a LP (legal 6 description, e.g. corporation., LP, LLC), authorized to do business in Texas, acting by and through 7 its duty authorized representative, hereinafter called Contractor. City and Contractor, in 8 consideration of the mutual covenants hereinafter set forth, agree as follows- 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows' 15 Sumrrter Creek Drive Risin er Road to Summer-Park Drive 16 City Proi t No. 00997 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. ' 22 The Work will be complete for Final Acceptance within 180 calendar days after the date 23 when the Contract Time commences to run as provided in Paragraph 2.03 of the General 44 Conditions. 25 33 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that City will 27 suffer financial loss if the Work is not completed within the times specified in Paragraph 28 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 29 Gencral Conditions. The Contractor also recognizes the delays, expense and difficulties 30 involved in proving in a legal proceeding the actual loss suffered by the City if the Work 31 is not completed on time. Accordingly, instead of requiring any such proof, Contractor 32 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 33 City Three hundred fifteen Dollars (5315.00) for each day that expires after the time 34 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 35 Acceptance. IR. 36 Article 4. CONTRACT PRICE 37 City agrees to pay Contractor for performance of the Work in accordance with the Contract r 38 Documents an amount in current funds of Seven Hundred Sixty-six Thousand Seven 39 Hundred Thirty -six and 951100 .................................... ............................... 40 Article 5. CONTRACT DOCUMENTS CfDili =KoleIIm►1 &111 42 A. The Contract Documents which comprise the entire agreement between City and 43 Contractor concerning the Work consist of the following: 44 1. This Agreement. 45 2. Exhibits to this Agreement: 46 a. Bid Form 47 1) Proposal Form 48 2) Vendor Compliance to State Law Non Resident Bidder 49 3) Prequalifieation Statement 50 4) State and Federal documents 51 b. Currcnt Prevailing Wage Rate Table 52 c. Insuranee Accord Form(s) 53 d. Payment Bond 54 e. Performance Bond 55 f. Maintenance Bond 56 g. Power of Attorney for the Bonds 57 h. Worker's Compensation Affidavit 58 i. MWBE Commitment Form 59 3. General Conditions. 60 4. Supplementary Conditions. 61 5. Specifications as included in the Project Manual. 62 6. Drawings. 63 7. Addenda, 64 8. Documentation submitted by Contractor prior to Notice of Award. 65 9. The following which may be delivered or issued after the Effective Datc of the 66 Agreement and, if issued, become an incorporated part of the Contract Documents: 67 a. Notice to Proceed. 68 b. Field Orders. 69 c. Change Orders. 70 d. Letter of Final Acceptance. 71 72 Article 6. INDEMNIFICATION APk 73 6.1 Contraetor covenants and agrees to indemnify, hold harmless and defend, at its own 74 expense, the city, its officers, servants and employees, from and against any and all 75 claims arising out of, or alleged to arise out of, the work and services to be performed 76 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 77 under this contract. This indemnification provision is specifically intended to operate 78 and be effective even if it is alleged or proven that all or some of the damages being 79 sought were caused, in wbole or in part. by any act, omission or neglieence of the city. 80 This indemnity provision is intended to include, without limitation, indemnity for 81 costs, expenses and legal fees incurred by the city in defending against such claims and 82 causes of actions. 83 84 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 85 the city, its officers, servants and employees, from and against any and all loss, damage 86 or destruction of property of the city, arising out of, or alleged to arise out of, the work 87 and services to be performed by the contractor, its officers, agents, employees, 88 subcontractors, licensees or invitees under this contract. This indemnification 89 provision is specifically intended to operate and be effective even if it is alleeed or 90 proven that all or some of the damages beine sought were caused. in whole or in part , 91 by anv act, omission or neslieence of the city. 92 93 Article 7. MISCELLANEOUS 94 7.1 Terms. 95 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 96 have the meanings indicated in the General Conditions. 97 7.2 Assignment of Contract. 98 This Agreement, including all of the Contract Documents may not be assigned by the 99 Contractor without the advanced express written consent of the City. 100 7.3 Successors and Assigns. 101 City and Contractor each binds itself, its partners, successors, assigns and legal 102 representatives to the other party hereto, in respect to all covenants, agreements and 103 obligations contained in the Contract Documents. 104 7.4 Severability. 105 Any provision or part of the Contract Documents held to be unconstitutional, void or 106 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 107 remaining provisions shall continue to be valid and binding upon CITY and lab CONTRACTOR. 109 7.5 Governing Law and Venue. 110 This Agreement, including all of the Contract Doeuments is performable in the State of 111 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 112 Northern District of Texas, Fort Worth Division. 113 7.6 Other Provisions. 114 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 115 classified, promulgated and set out by the City, a copy of which is attached hcreto and 116 made a part hereof the same as if it were copied verbatim herein. 117 7.7 Authority to Sign. 118 Contractor shall attach evidence of authority to sign Agreement, if other than duly 119 authorized signatory of the Contractor. 120 121 SIGNATURE PAGE TO FOLLOW r- rA r rAi 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 IN WTINESS WHEREOF, City and Contraetor have signed this Agreement in multiple counterparts. At least one counterpart each has been delivered to City and Contraetor. This Agreement will be effective on PX. r D 2D1 , 20 (which is the Effective Date of the Agreement). City of Fort Worth Contractor: Conatser Construction TX, LP B: �7 e;� Fernando Costa By: - Assistant City Manager tgnature) M &C C - z5 � S 3 Jerry Con atser, President of Conatser Management Group. Inc. G.P. Address: PO Box 15448 City /State/Zip: Fort Worth TX 76119 A to as Form and Legality: I sistant City Attorney APE90VAL RECOMMENDED: Dou 1 . Wiersi P. E. DIRECTOR, TRANSPORATION PUBLIC WORKS DEPARTMENT 1000 Throckmorton St. Fort Worth, Texas 76102 o��~ctat REC�Y c1Tr sic