Loading...
HomeMy WebLinkAboutOrdinance 24181-05-2020 Ordinance No. 24181-05-2020 AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE AVIATION GAS LEASE CAPITAL PROJECT FUND IN THE AMOUNT OF $1,039,715,00, FROM AVAILABLE FUNDS, FOR THE PURPOSE OF FUNDING THE PHASE II DESIGN, CONSTRUCTION AND ADMINISTRATIVE COSTS ASSOCIATED WITH THE ALLIANCE AIRPORT CONTROL TOWER HVAC REPLACEMENT PROJECT; PROVIDING FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2019-2020 in the Budget of the City Manager,there shall also be increased estimated receipts and appropriations in the Aviation Gas Lease Capital Project Fund in the amount of $1,039,715.00, from available funds, for the purpose of funding the Phase II design,construction and administrative costs associated with the Alliance Airport Control Tower HVAC Replacement project. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance 23835-09-2019 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. APPROVED O'�viVED AS TO FORM AND LEGALITY: CITY SECRETARY Lev v mm `" JB Strong(May 2 , 02014:07 MDT) U!� Assistant City Attorney Mary J. Kayser ADOPTED AND EFFECTIVE: May 5,2020 O�FORT�O A. ACAS ALLIANCE AIRPORT CONTROL TOWER _ok t CONTROL ■" ,� 'r TOWER I t 40 HORIZON p LU 5 � Ea E y{ 1,200 0 2,400 Fee EgrtfJfT ` kk 0 1 Ir 4r� #1T FORTWORTHo SfAIGi Ii1EPEC PROTECT UNWK UNSPE0FIED-Al1RTND5V 14 < of 2 > t>l U laal 8 FIrb,NeA LM R PARD 0-L-Cr♦P,al tqp" SUM274.80 31tfa214atd T^MOO 40D00 [own TPW 11..L-Rp.d L"m S SM.43504 1221s Main WAAt4ad0..L.."L.0..1r S24POM. SM.084.QQ MOD mm m3mm ob dbp,orwrr.. S1AM743. Se8MA7242 52277.9mv A"A3 IE m IN 12R 9-0-0 Pk." SQldp2 N SW.M..31 3XIMD7 tw46 Eau"Blr.dbprarwlb Srypwll •taus •4n77mw $2MOW83 WAR MUM ob d Y F- ft 2m S1 na,a77y1 _non>t - (SbS6A11.4B) w4A ®3"m 3Y.d R.h.5iib4f.n $17m5.052D.1 317ASO45017 I3m211^ 9725 loam SY.dBrrPro...rrrd. S 4KM D2 520,007M7.81 S11.415,031.70 aU$ E3 9'1 EWA wd"WWRM t1212,1D 9121 Moo 1S01f0 ®3M PARD1.1p.a.w,rb M1390,gT 3m.2f 302S I" MaM P.A.i.p...e1.,b Fwd MOO $000 Moo DSO mms CW"PraPrd. 26.018.2ft fffiZ44.11 (34A93.76084) 1Ap EO"M M dl.n Plod-w AGr L- S13932m, me 945.S0118 30.000.sum 472f7 EI5 Ad.emll-t -C+P" 3341.M A 310.7m.308.70 I!w,100e5 49""0 1ld.r.d E.W.0. $0.00 s398.711C20 330S.70-a :06 454306 1Tb Le RopBif 3841M013 $5,434206.8D S4,W2,878.87 018.75 4 a.L-0-0 R.p15.. 80.00 S158.413415 S78S.44308 0.00 obbs,1 a.Flaw TR m 50.00 8000 M.OD 0.00 LWSWdr SaWWAb 90.00 ( l-".851 ($412779S) Uo 4M +t0 Tr-kcF wPAC30.r Fadw $0.00 5000 SOM 0.00 4 aWl Tm@WFrew AiUEO. $0.00 54.&U M40 84.8412M40 0.00 fB�S33Bd1S..rPrd.dw..LOSBIw })SO-Al`!i W-wimlid S 9r1140m IN41 SEARCH JUMSM PROTECT JUMM UNWOFIM-ALL RRdDS V (4 < O of 2 > DI Find I Ned 0001w-PPojs>:+omhw%ma«y RmTLM:ONIOW20 apt PM ®���MMEWMM® OBMW Pr w- 5000 50.00 50.00 30.00 50.00 ow UA6...FUM. S40OPIU.04 $0.00 $0.00 SMAW.32334 X=3W.30 9937 LJNer Qww P.a).r1Fwd. 306D132M.01 $0.00 M.OD $1237.214.79 M5.375A64.12 128 a"rdrawd CW"p•1••1• X00178 M.00 30 OD M.OD W801.28 0cc )RU, Cr..LTw.b-c p 300D Woo ww 5810.772.33 a N 16MM ODW Cdw,q'F..Nlk.Ap1B 14=27 7 S00O 10.00 SODD 94Ap27 0cc 03"t 7TSC4pW S1ARM31 M.OD M.00 30.OD 31.1=17.31 000 9701M CPA D.,WWV S13A4Q402.Oa $0.00 30.00 SDDD SU301g402o0 77c ®2m RA4b Ewrd,C4pW Fa d iffi0.408.85 woo $0.00 Sam $M4Q&85 0 cc 07uwLyr.3RpFa.La.cmpPr.l•.l Pair n,wM $0.00 $0.00 s>2a 97.7a StMAT74 M87 ®32Q92 PARD G"L..u.CapYlPra/..l $0.00 WOO Mao Moo 11000 Doc mmm Bid O.d a.L.a..Lap►rq W.34'#,2fl SOM M.Oa stw3ZS VLMD.03 5223 q 7�0 8 moral aF L.u.Cy WI P4 IM017. M.00 MAD S8.186.00 IMS32.26 310: Ei so-M.CW"PIW-t- SODA794.06 MOD 300D $0.00 30030704.05 30c EMMAra.S..O..L.4n.C p PM MOo M.OD Sn7 wv Std515.93 92 44 g0.35o�,26Arb"Bll.d.yA AYp.q. i' s.,.t wJC M34-•;3 .... ® 50/1-R0.71 $MOD $0.00 ST77A132D S83.O15.03 92.44 City of Fort Worth, Texas Mayor and Council Communication DATE: 05/05/20 M&C FILE NUMBER: M&C 20-0294 LOG NAME: 21ALLIANCE AIRPORT CONTROL TOWER HVAC REPLACEMENT SUBJECT Authorize the Execution of a Construction Contract with Infinity Contractor International,LTD,in the Amount Not to Exceed$965,547.00,Including the Owner's Construction Allowance,for the Alliance Airport Control Tower HVAC Replacement for a Total Anticipated Project Cost of $1,782,742.00,and adopt appropriation ordinance(COUNCIL DISTRICT 7) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the execution of a construction contract with Infinity Contractor International,LTD,in the amount not to exceed$965,547.00, including the owner's construction allowance,for the Alliance Airport Control Tower HVAC Replacement. 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Aviation Gas Lease Capital Project Fund in the amount of$1,039,715.00 from available funds for the purpose of funding the Phase II design,construction and administrative costs. DISCUSSION: The airport and tower were officially opened on December of 1989 and as the facilities age some building systems have out lived their expected life span.City staff administratively engaged design firms to prepare construction documents,for all phases of the work,to replace the tower's roofing and heating and air-conditioning equipment.Because of the need to keep the Air Traffic Control Tower operating at all times,the roofing and supplemental air-conditioning system located on the roof of the tower cab was accomplished first as Phase 1, (M&C C-29036)February 12, 2019.This contract will complete Phase 2 of the project,replacing the HVAC system for the rest of the facility. The City issued a Request for Proposals in the Fort Worth Star Telegram on October 17,2019 and October 24,2019. On November 21,2019 the City received three responses for the replacement project from general contractors.Two of these firms provided the required Post Proposal-Pre Award Submittals to be further evaluated by the City.These firms were: • DMI Corp.,d/b/a Decker Mechanical • Infinity Contractors International LTD These proposals were reviewed by members of the Aviation Department,Office of Business Diversity and the Property Management Department. References were checked,the MWWBE Office evaluated their sub-consulting plans and the proposal were reviewed for completeness. Based on this evaluation,the selection team recommends award of the construction contract to Infinity Contractors Intemational LTD. SCORING MATRIX Infinity Contractors DMI Corp.,d/b/a International LTD Decker Mechanical Proposed Price 60 37 MWBE Review 4 6 Schedule 5 5 References and 10 10 Experience Past Work in the City 8 9 of Fort Worth ffA:Ljl 87 67 The overall project costs are expected to be as described in the table below: TOTAL PROJECT BUDGET TOTAL Phase 1-Total Cost $743,027.00 Phase 2-Design Cost $6,700.00 Phase 2-Construction Cost $965,547.00 Phase 2-Administrative Cost $67,468 I TOTALV $1,782,742.00� Waiver of Building Permits-In accordance with the City Code of Ordinances,Part II,Chapter 7-1 Fort Worth Building Administrative Code, Section 109.2.1,Exception 2;"Work by non-City personnel on property under the control of the City of Fort Worth shall be exempt from the permit fees only if the work is for action under a contract that will be or has been approved by City Council with notes in the contract packages stating the fee is waived." M/WBE Office-Infinity Contractors International Ltd is in compliance with the City's BDE Ordinance by committing to 2%MBE participation and documenting good faith effort. Infinity Contractors International Ltd identified several subcontracting and supplier opportunities.However,the firms contacted in the areas identified did not respond or did not submit the lowest bids.The City's MBE goal on this project is 10%. Location-The Alliance Airport is located in COUNCIL DISTRICT 7,but serves all Fort Worth residents in ALL COUNCIL DISTRICTS. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies upon approval of the above recommendations and adoption of the attached appropriation ordinance,funds will be available in the Aviation Gas Lease Capital Project(Aviation Gas Lease Cap Proj)Fund AFW ATC HVAC Replacement project. Prior to an expenditure being incurred,the Property Management Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office by: Jay Chapa 5804 Originating Business Unit Head: Steve Cooke 5134 Additional Information Contact: Brian Glass 8088